City of Stevens Point
Board of Water and Sewerage Commissioners
November 9, 2026 - 12:00 PM
Stevens Point Public Utilities
300 Bliss Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 820 26885705
By Computer: Zoom Link
By Phone: (303) 715-8592
MINUTES
Discussion and Possible Action on:
- 1.Roll Call.
Present: Paul Adamski, Carl Rasmussen, Anna Haines, Jeff Bushman and Ray Schmidt
Also Present: Joel Lemke, Jennifer Schmeiser, Eric Southworth, Shane Kohnen, Chris Lefebvre, Jason Draheim, Natalie Rink, and Michael Miller (resident)
- 2.Approval of Minutes
Motion made by Paul Adamski, seconded by Anna Haines to approve the October 19, 2026 meeting minutes of the Board of Water & Sewerage Commission.
Ayes all. Nays none. Motion carried.
- 3.Approval of Department Claims
Motion made by Jeff Bushman, seconded by Anna Haines to approve the claims for the month of October as audited and read.
Ayes all. Nays none. Motion carried.
- 4.Water Supply and Distribution Reports - Eric Southworth
Eric stated that a correction is needed to the pumpage report for Well 11. The correct amount is 89,054, rather than the previously reported total pumpage of 197,064,000. Eric also reported that the lead and copper sampling results have been received. The DNR requires the 90th percentile results from the samples collected. The 90th percentile for lead was 1.3, compared to the maximum contaminant level (MCL) of 15. The 90th percentile for copper was 640, compared to the MCL of 1,300. This marks the first time since 2009 that neither lead nor copper had a sample exceeding its applicable limit.
Eric explained the sampling process, which requires 30 residential samples from an approved pool of 45 homes established under DNR criteria. Homes generally qualify based on copper plumbing and the presence of lead solder, typically associated with p. 2homes constructed before 1984. Obtaining all 30 samples can be challenging and requires staff to contact homeowners through letters, phone calls, and in-person visits. Staff will continue working to identify and obtain samples from additional eligible homes for future sampling periods.
- 5.Sewage Treatment Operations Report - Chris Lefebvre
Chris provided an update on wastewater treatment operations and discharge monitoring. The wastewater treatment plant remained within its effluent discharge limits. Staff has been testing an alternative phosphorus-removal chemical for approximately three weeks. The existing iron-based chemical can affect water chemistry and interfere with the ultraviolet disinfection system because iron attaches to the UV bulbs. The alternative chemical appears promising, with costs expected to be comparable to the existing product. Testing will continue for approximately two additional weeks before a decision is made. Chris also addressed elevated suspended solids readings in recent reports. The department believes the increases may be related to cleaning anaerobic digesters and returning the removed material through the head works for treatment. The sampling line was also recently adjusted because it may have been positioned too close to the bottom of the channel, potentially collecting additional solids. Staff will monitor results following the adjustment.
Additional discussion covered anaerobic digester maintenance. The department would ideally clean each digester every five years. One recently cleaned digester had gone approximately seven years between cleanings. Two additional digesters are scheduled for cleaning next year, after which the department hopes to return to its five-year maintenance schedule.
Other treatment tanks are generally inspected and maintained on a more frequent schedule, as operational conditions allow.
- 6.Influent Screw Pump VFD Installation - Chris Lefebvre/Joel Lemke
Chris presented a capital request related to the wastewater treatment plant's influent screw pumps. The facility has two large screw pumps capable of handling approximately six million gallons per day each, along with a smaller submersible pump used for normal daily flows. One of the existing screw pumps previously operated using a variable frequency drive, while the other relied on an older soft-start electrical system. During the removal and rebuilding of the second screw pump, staff discovered that its soft-start equipment had failed.
Rather than rebuilding outdated 1992-era technology, Chris recommended installing another variable frequency drive. The upgrade would allow either screw pump to operate while using the backup generator. Improve operational reliability during highflow events. Provide a more dependable startup process. Improve electrical efficiency and reduce stress on the facility's power system. The current estimated cost is approximately $35,000. Chris indicated he would continue looking for a more competitive price.
Motion made by Ray Schmidt, seconded by Paul Adamski to approve the $35,000 capital request for the variable frequency drive.
Ayes all. Nays none. Motion Carried
- 7.p. 3Strand Agreement for PDFR management - Joel Lemke
Joel presented information regarding two grant awards supporting a citywide stormwater study. The City was awarded funding through two programs, Pre-Disaster Flood Resilience (PDFR), administered through Wisconsin Emergency Management, with an award of $300,000, and Building Resilient Infrastructure and Communities (BRIC), with an award of approximately $268,800. Joel explained that the BRIC program had previously been canceled but was later reinstated. In the meantime, the City had applied for and received the PDFR grant for substantially similar work. The two programs are allowing the grants to be combined. This arrangement expands the scope of services while eliminating the City's local funding share. The proposed Strand Associates agreement outlines the services and associated fees for both grant-funded scopes of work. The study will be citywide and will also consider drainage basins extending beyond City limits.
The Commission was asked to authorize the appropriate signatories, accept the grants as awarded, and approve the use of the combined grant funding for the Strand Associates services. Joel anticipates the work will begin and be completed during 2027 to answer Ray's question on the timeline.
Motion made by Jeff Bushman, seconded by Anna Haines to approve the appropriate signatures for the applicable grant agreements and to accept the two grants as awarded.
Ayes all. Nays none. Motion carried.
- 8.Construction and Maintenance Report - Shane Kohnen
Shane provided an update on seasonal construction and maintenance activities. With the construction season coming to an end, crews are working to complete projects before asphalt plants typically shut down ahead of deer season. Concrete work may continue beyond that timeframe, weather permitting. Shane discussed two projects: the North and South Business 51 projects and the mill and overlay project between Main and Clark Street. The Business 51 projects involve concrete construction, so work may continue as weather conditions allow. At the intersection of Main and Clark Street, approximately two inches of deteriorated concrete were removed and replaced with asphalt due to poor joint conditions. This work has been completed and is considered a temporary improvement.
- 9.Agreement Among Airport and Utilities Related to Maintenance Costs and Future Lease Revenues - Joel Lemke
Joel presented a proposed agreement between the Airport and Utilities departments regarding maintenance responsibilities and shared benefits. Joel explained that certain utility assets, including wells along Wellfield Road, are located within the airport's secured property. A previous land exchange with the Bureau of Aeronautics and FAA helped incorporate these utility assets within the airport fence. The airport maintains the perimeter fence, which also protects the city's utility infrastructure. Staff discussed the shared benefits of this arrangement, including the airport's use of City fiber-optic infrastructure and operational support. The proposed arrangement includes: Utilities crews providing certain maintenance services at the airport without billing for utility labor hours, particularly snow removal and larger equipment-related grounds maintenance.
p. 4Recognizing the mutual benefit of these maintenance activities and the airport's upkeep of the perimeter fence. Considering future cost-sharing or revenue-sharing arrangements related to potential non-aviation land leases, including energy production opportunities. Joel indicated that the November 2nd memo would serve as the basis for the agreement and that the arrangement would appear on both utilities and airport agendas as it pertains to both.
Motion made by Ray Rassmusen, seconded by Pual Adamski to approve the agreement as outlined in the November 2nd memo.
Ayes all. Nays none. Motion carried
- 10.Directors Report - Joel Lemke
Joel provided an update on customer responses to the upcoming changes in rates and billing. Staff reported receiving numerous phone calls and inquiries regarding the increases. While many conversations have been challenging, staff noted that customers generally demonstrate a better understanding once the reasons for the adjustments and available resources are explained.
- 11.Adjournment.
Motion made by Anna Haines, seconded by Jeff Bushman to adjourn the meeting.
Ayes all. Nays none. Motion carried.
Time: 12:35pm