Skip to main content

Independent concept. Not a City of Stevens Point website.

Balance Point
Source library

Water, sewer, and stormwater

Water rate case 5690-WR-110: staff revenue requirement

Publisher
Public Service Commission of Wisconsin
Date
June 18, 2026
Saved
Nov. 26, 2026, 16 pages

Saved text

Set for reading from the publisher’s PDF, with its page numbers. Headings and tables are rebuilt from the text, so check the original for exact layout.

p. 1PSC REF#:594493

Public Service Commission of Wisconsin

Summer Strand, Chairperson4822 Madison Yards Way
Public Service Commission of Wisconsin
Kristy Nieto, CommissionerP.O. Box 7854
Marcus Hawkins, CommissionerMadison, WI 53707-7854

June 18, 2026

Joel Lemke, Public Utilities Director
Stevens Point Municipal Water Utility
300 Bliss Ave, P.O. Box 242

RECEIVED: 6/18/2026 8:25:00 AM
Stevens Point, WI 54881-0242

5690-WR-110

Re: Application of the City of Stevens Point, Portage County,

Wisconsin, as a Water Public Utility, for Authority to Adjust Water Rates

Dear Joel Lemke:

Public Service Commission (Commission) staff has analyzed the Stevens Point Municipal Water Utility’s (applicant) application for a water rate increase. The Commission received the application on March 3, 2026. Attached is Commission staff’s proposed 2026 test year revenue requirement exhibit (Exhibit) which will serve as the basis for the cost-of-service study. Erik Lindgren, rate analyst, will soon develop the cost-of-service study and a proposed rate design. The rate analyst will file a copy of that exhibit in the Electronic Records Filing (ERF) system separately upon completion. Commission staff will submit both proposals at the public hearing, which will be scheduled at a later date.

In its application, the applicant stated that it filed for the rate increase because of multiple factors. The applicant has an ongoing long-term capital improvement plan and several larger infrastructure projects planned, including reconstruction on Business Hwy 51, development of a new pressure zone that includes a new water tower, and completion of Well No. 12. The rate increase will allow the applicant to be financially prepared to undertake these projects and fund future debt service requirements. The applicant also stated that operating and maintenance expenses have increased since the prior rate increase.

For Step I, the applicant requested a return on net investment rate base of 6.70 percent. The Commission calculates the benchmark rate of return weekly based on a three-month rolling average of municipal bond rates and determines a floor annually. The benchmark rate of return at the time Commission staff finalized the revenue requirement for this case was 6.50 percent. Commission staff estimates the applicant’s capital employed in providing public utility service associated with the net investment rate base in Step I to be 70.48 percent municipal equity and 29.52 percent long-term debt. The composite cost of debt is 3.75 percent. Commission staff considers that a return on rate base of 6.50 percent would provide a 7.51 percent return on municipal earning equity and 5.05 times interest coverage in Step I. Commission staff believes a 6.50 percent return on rate base would provide the applicant with sufficient earnings to help

Telephone: (608) 266-5481 Fax: (608) 266-3957

Home Page: http://psc.wi.gov E-mail: pscrecs@wisconsin.gov p. 2address future capital and unforeseen operating needs and would also maintain confidence in the applicant’s financial integrity without resulting in customer rates that are excessive.

For Step II, the applicant requested a return on net investment rate base of 6.70 percent. Commission staff estimated the applicant’s capital employed in providing public utility service associated with the net investment rate base to be 70.45 percent municipal equity and 29.55 percent long-term debt. The composite cost of debt is 3.75 percent. Commission staff considers that a return on rate base of 6.50 percent would provide a 7.51 percent return on municipal earning equity and 5.31 times interest coverage in Step II. Commission staff believes that a 6.50 percent return on rate base would provide the applicant with sufficient earnings to help address future capital and unforeseen operating needs and would also maintain confidence in the applicant’s financial integrity without resulting in customer rates that are excessive.

The proposed Step I increase of $2,185,264 would take effect following the issuance of the Final Decision. The proposed Step II increase of $2,368,170 is compared to the current rates and is an additional increase of $182,906 over Step I rates. The applicant would implement the remaining Step II increase of $182,906 when it notifies the Commission in writing that the Well No. 12 project, as authorized in docket 5690-CW-108, is completed and placed into service. (PSC REF#: 456557.)

In its original application, the applicant included estimated additions to Utility-Financed Plant and related depreciation expense for the Well No. 12 project, as authorized in docket 5690-CW-108, in Step I. The applicant also requested a Step II rate increase that included estimated costs for the construction of a new water tower to replace the existing Bliss Avenue Tower. The applicant stated in its responses to Commission staff that it will begin the Well No. 12 project construction in mid-2026 and will complete and place it into service in late 2027. Since it will not complete and place this project into service during the test year, staff excluded the estimated additions from the Step I increase and included them in the Step II increase.

In addition, the Final Decision in docket 5690-CW-108, issued January 13, 2023, indicated that the applicant expected to complete the Well No. 12 project for a total cost of $1,920,000. In the current proceeding, the applicant stated that construction was in progress, and it will place Well No. 12 into service in late 2027. The applicant also estimated total costs for the project of $2,570,000. In recent Commission decisions, the Commission has allowed recovery of authorized construction costs, but denied consideration of additional costs until all the project costs are complete and can be thoroughly reviewed. As such, Commission staff’s proposal includes total additions to plant of $1,920,000 but does not include the additional $650,000 of estimated cost overruns. Recovery of the cost overruns can be considered once the applicant fully completes and places the construction project into service, and it submits final costs in a subsequent rate case.

p. 3The applicant also stated in its responses to Commission staff that it has not submitted a construction authorization application for the Bliss Avenue Tower project, and that it does not plan to seek construction authorization for the project until at least 2028, with construction commencing after authorization is granted by the Commission. This project timeline falls outside of the test year of Commission staff’s proposed revenue requirement. In addition, the applicant has not started the authorization process and the costs for the project and financing options are unknown. As such, Commission staff did not include any additions to Utility-Financed Plant related to the Bliss Avenue Tower project in the proposed Step II rate increase. Commission staff encourages the applicant to file a subsequent conventional rate case application once the construction authorization process has concluded and an accurate cost estimate and project timeline is available.

Schedule 5 of the Exhibit is the list of depreciation rates that is the basis of Commission staff’s estimated depreciation expense for the test year. Some depreciation rates may be different than those previously authorized for the applicant. Commission staff recommends that the Commission certify these depreciation rates for use by the applicant effective January 1, 2026. Please note that the general service and public fire protection rates are typically effective within 90 days of the Final Decision.

The Commission staff Exhibit is intended to provide the Commission with Commission staff’s analysis and is not a final decision. After reviewing the attached Exhibit, the applicant may present its own analysis and submit any additional information it believes to be pertinent to substantiate its position within five business days of the date of this letter. If Commission staff does not receive a response within that time, it will assume the applicant is in agreement with the staff proposal and the Commission staff rate analyst will use the Exhibit to develop a rate proposal. Please note that this is the applicant’s primary opportunity to address any concerns or changes to Commission staff’s proposed Exhibit.

In order to receive notification of official correspondence (i.e. data requests, notices, final decisions, etc.), individuals must subscribe to the Utility ID or PSC Docket. To subscribe, go to the Commission’s ERF system. For help subscribing, go to Subscribing to Dockets.

p. 4If you have any questions regarding the above, please contact me. If you have any questions regarding the status of your rate case, please contact Erik Lindgren at (608) 261-9402 or by e-mail at Erik.Lindgren@wisconsin.gov.

Sincerely,

Stephen Elmer
Stephen Elmer
Public Utility Auditor
Public Service Commission of Wisconsin
Division of Water Utility Regulation and Analysis
608.267.0637 | Stephen.Elmer@wisconsin.gov

SLE:rgs DL:02137931

Attachment

cc: Jodi Dobson, Baker Tilly
Nina Crane, Baker Tilly

p. 5

Ex.-PSC-Revenue Requirement

Estimated 2026 Operating Income Statement

Net Investment Rate Base and 2026 Estimated Revenue Requirement

6/1/2026

p. 6

Estimated Operating Revenues - Step I

for the 2026 Test Year

Adjustments

Utility EstimateNo.AmountStaff Estimate
Unmetered Sales to General Customers $0$0 $0
Metered Sales to General Customers:
Residential 1,665,0611a(26,694)1,638,367
Multi-family Residential 165,3420165,342
Commercial 830,5080830,508
Industrial 1,332,22701,332,227
Public Authority 225,8320225,832
Irrigation 000
Total Metered Sales $4,218,970$(26,694) $4,192,276
Private Fire Protection 53,916053,916
Public Fire Protection 793,6681b(12,177)781,491
Other Water Sales 000
Sales for Resale 000
Interdepartmental 000
Total Water Sales $5,066,554$(38,871) $5,027,683
Forfeited Discounts 8,55008,550
Rents of Water Property 102,4870102,487
Interdepartmental Rents 000
Other Water Revenues 74,4461c(42,511)31,935
Total Operating Revenues $5,252,038$(81,382) $5,170,656

p. 7Estimated Operating Income Statement and Net Investment Rate Base - Step I

for the 2026 Test Year

Adjustments

Utility EstimateNo.AmountStaff Estimate
Total Operating Revenues:$5,252,038$(81,382) $5,170,656
Operating Expenses:
Source of Supply86,703086,703
Pumping302,4710302,471
Water Treatment196,7290196,729
Transmission and Distribution921,4140921,414
Customer Accounts167,7820167,782
Sales000
Administrative and General885,4292(2,956)882,473
Total Operation & Maintenance Exp.$2,560,528$(2,956) $2,557,572
Depreciation1,580,2893(79,130)1,501,159
Amortization000
Taxes932,2100932,210
Total Operating Expenses$5,073,027$(82,086) $4,990,941
Net Operating Income (Loss)$179,011$704 $179,715
Net Investment Rate Base:
Utility Plant in Service$60,413,376$(2,570,000) $57,843,376
Less:
Accumulated Provision for Depreciation21,878,726(79,290)21,799,436
Net Plant in Service$38,534,650$(2,490,710) $36,043,940
Add: Materials and Supplies340,3590340,359
Net Investment Rate Base$38,875,0094$(2,490,710) $36,384,299
p. 8

Estimated Income Statement and Revenue Requirement - Step I
For the 2026 Test Year

to Yield a 6.50% Return on the Net Investment Rate Base

Staff EstimateIncrease Proposed Required Rate Level
Total Operating Revenues:$5,170,656 $2,185,264 $ 7,355,920
Operating Expenses:
Source of Supply86,70386,703
Pumping302,471302,471
Water Treatment196,729196,729
Transmission and Distribution921,414921,414
Customer Accounts167,782167,782
Sales00
Administrative and General882,473882,473
Total Operation & Maintenance Expenses$2,557,572$2,557,572
Depreciation1,501,1591,501,159
Amortization00
Taxes932,210932,210
Total Operating Expenses$4,990,941$4,990,941
Net Operating Income (Loss)$179,715$2,364,979
Net Investment Rate Base:
Utility Plant in Service$57,843,376$57,843,376
Less:
Accumulated Provision for Depreciation21,799,43621,799,436
Net Plant in Service$36,043,940$36,043,940
Add: Materials and Supplies340,359340,359
Net Investment Rate Base$36,384,299$36,384,299
p. 9

Estimated Operating Revenues - Step II

for the 2026 Test Year

Adjustments

Utility EstimateNo.AmountStaff Estimate
Unmetered Sales to General Customers $0$0 $0
Metered Sales to General Customers:
Residential 1,665,0611a(26,694)1,638,367
Multi-family Residential 165,3420165,342
Commercial 830,5080830,508
Industrial 1,332,22701,332,227
Public Authority 225,8320225,832
Irrigation 000
Total Metered Sales $4,218,970$(26,694) $4,192,276
Private Fire Protection 53,916053,916
Public Fire Protection 793,6681b(12,177)781,491
Other Water Sales 000
Sales for Resale 000
Interdepartmental 000
Total Water Sales $5,066,554$(38,871) $5,027,683
Forfeited Discounts 8,55008,550
Rents of Water Property 102,4870102,487
Interdepartmental Rents 000
Other Water Revenues 74,4461c(42,511)31,935
Total Operating Revenues $5,252,038$(81,382) $5,170,656

p. 10Estimated Operating Income Statement and Net Investment Rate Base - Step II

for the 2026 Test Year

Adjustments

Utility EstimateNo.AmountStaff Estimate
Total Operating Revenues:$5,252,0381$(81,382) $5,170,656
Operating Expenses:
Source of Supply86,703086,703
Pumping302,4710302,471
Water Treatment196,7290196,729
Transmission and Distribution921,4140921,414
Customer Accounts167,7820167,782
Sales000
Administrative and General885,4292(2,956)882,473
Total Operation & Maintenance Exp.$2,560,528$(2,956) $2,557,572
Depreciation1,722,7893(163,447)1,559,342
Amortization000
Taxes932,2100932,210
Total Operating Expenses$5,215,527$(166,403) $5,049,124
Net Operating Income (Loss)$36,511$85,021 $121,532
Net Investment Rate Base:
Utility Plant in Service$67,913,376$(8,093,000) $59,820,376
Less:
Accumulated Provision for Depreciation22,021,226(163,607)21,857,619
Net Plant in Service$45,892,150$(7,929,393) $37,962,757
Add: Materials and Supplies340,3590340,359
Net Investment Rate Base$46,232,5094$(7,929,393) $38,303,116
p. 11

Estimated Income Statement and Revenue Requirement - Step II
For the 2026 Test Year

to Yield a 6.50% Return on the Net Investment Rate Base

Staff EstimateIncrease Proposed Required Rate Level
Total Operating Revenues:$5,170,656 $2,368,170 $ 7,538,826
Operating Expenses:
Source of Supply86,70386,703
Pumping302,471302,471
Water Treatment196,729196,729
Transmission and Distribution921,414921,414
Customer Accounts167,782167,782
Sales00
Administrative and General882,473882,473
Total Operation & Maintenance Expenses$2,557,572$2,557,572
Depreciation1,559,3421,559,342
Amortization00
Taxes932,210932,210
Total Operating Expenses$5,049,124$5,049,124
Net Operating Income (Loss)$121,532$2,489,703
Net Investment Rate Base:
Utility Plant in Service$59,820,376$59,820,376
Less:
Accumulated Provision for Depreciation21,857,61921,857,619
Net Plant in Service$37,962,757$37,962,757
Add: Materials and Supplies340,359340,359
Net Investment Rate Base$38,303,116$38,303,116
p. 12

Schedule of Staff Adjustments

Adjustments at 6.70% ROR

$2,425,615

Utility Requested Rate Increase
48.39%
Adjustment No. 1 - Operating Revenues

  1. a.Account 461.1 - Residential
Utility Estimate$1,665,061
Staff Estimate$1,638,367
Adjustment$26,694
  1. b.Account 463 - Public Fire Protection
Utility Estimate$793,668
Staff Estimate$781,491
Adjustment$12,177

Additional Detail

The test year estimates for Account 461.1 and Account 463 were revised based on updated Residential customer/meter counts from the applicant for the 2025 and the 2026 test year.

  1. c.Account 474 - Other Water Revenues
Utility Estimate$74,446
Staff Estimate$31,935
Adjustment$42,511

Additional Detail

The test year estimate for Account 474 was revised based on staff's estimate for the return on meters charged to the sewer dept.

Adjustment No. 2 - Administrative & General Expenses

Account 930 - Misc. General Expenses

Utility Estimate$42,685
Staff Estimate$39,729
Adjustment$(2,956)

Additional Detail

The test year estimate for Account 930 was revised to remove a portion of membership dues used for lobbying.

p. 13

Schedule of Staff Adjustments

Adjustment No. 3 - Depreciation

Depreciation Expense

Utility Estimate$1,580,289
Staff Estimate$1,501,159
Adjustment$(79,130)

Adjustment No. 4 - Net Investment Rate Base (NIRB) / Rate of Return (ROR)

Net Investment Rate Base

Utility Estimate$38,875,009
Staff Estimate$36,384,299
Adjustment$(2,490,710)

Additional Detail

The applicant included additions to Utility-Financed Plant and related Depreciation expense for the Well No. 12 project, authorized in docket 5690-CW-108, in the test year. The applicant stated that construction will begin in Summer 2026, with the project being completed and placed into service in late-2027. Since the completion/in-service date for the project falls outside of the test year, staff excluded the additions to Utility-Financed Plant and related Depreciation expense from Step I of the current case. Staff will include the additions in Step II.

Adjustment to Return on NIRB based on requested 6.70% ROR$(166,879)
Revise ROR to Current Benchmark of 6.50%$(72,769)
Staff Estimated Rate Increase - Step I$2,185,264

43.94%

p. 14

Schedule of Staff Adjustments

Adjustments at 6.70% ROR

$635,452

Utility Requested Rate Increase - Step II Increase Only
12.68%
Adjustment No. 3 - Depreciation

Depreciation Expense

Utility Estimate$1,722,789
Staff Estimate$1,559,342
Adjustment$(163,447)
Less Step I Adjustment$79,130
Total Step II Adjustment$(84,317)

Additional Detail

Staff included the additions to Utility-Financed Plant and related Depreciation expense for the Well No. 12 project, authorized in docket 5690-CW-108, in Step II, since the project has an estimated completion/in-service date in 2027. Staff used the authorized project costs as detailed in the Final Decision for docket 5690-CW-108. Any estimated cost overruns were excluded from the test year NIRB estimate. See Cover Letter for add'l detail.

In addition, the applicant included estimated additions to Utility-Financed Plant, and related Depreciation expense, for the Bliss Ave Tower project in Step II in its application. The applicant stated it has not yet submitted an application for construction authorization, and does not plan to submit one until at least 2028. Since this tower project will not be completed/in-service within the test year or subsequent year, Commission staff excluded the estimated additions to plant and related depreciation expense for this project from the Step II NIRB estimate.

p. 15

Schedule of Staff Adjustments

Adjustment No. 4 - Net Investment Rate Base (NIRB) / Rate of Return (ROR)

Net Investment Rate Base

Utility Estimate$46,232,509
Staff Estimate$38,303,116
Adjustment$(7,929,393)

Additional Detail

Staff included the additions to Utility-Financed Plant and related Depreciation expense for the Well No. 12 project that was authorized in docket 5690-CW-108 in Step II, since the project has an estimated completion/in-service date in 2027. Staff used the authorized project costs as detailed in the Final Decision for docket 5690-CW-108. Any estimated cost overruns were excluded from the test year NIRB estimate. See Cover Letter for add'l detail.

In addition, the applicant included estimated additions to Utility-Financed Plant, and related Depreciation expense, for the Bliss Ave Tower project in Step II in its application. The applicant stated it has not yet submitted an application for construction authorization, and does not plan to submit one until at least 2028. Since this tower project will not be completed/in-service within the test year or subsequent year, Commission staff excluded the estimated additions to plant and related depreciation expense for this project from the Step II NIRB estimate.

Adjustment to Return on NIRB based on requested 6.70% ROR$(531,270)
Revise ROR to Current Benchmark of 6.50%$(76,606)
Less Step I Adjustment to Return on NIRB$239,647
Staff Estimated Rate Increase - Step II$182,906
3.65%
Total Staff Estimated Rate Increase - Combined Step I & Step II$2,368,170

47.59%

p. 16

Schedule of Water Depreciation Rates
Effective January 1, 2026

Account NumberAccount Title SOURCE OF SUPPLY PLANTDepreciation Rate
314Wells and Springs2.90%
316Supply Mains1.80%
PUMPING PLANT
321Structures and Improvements3.20%
325Electric Pumping Equipment4.40%
328Other Pumping Equipment4.40%
WATER TREATMENT PLANT
331Structures and Improvements3.20%
332Sand or Other Media Filtration Equipment3.30%
334Other Water Treatement Equipment6.00%
TRANSMISSION AND DISTRIBUTION PLANT
342Distribution Reservoirs and Standpipes1.90%
343Transmission and Distribution Mains1.30%
345Services2.90%
346Meters5.50%
348Hydrants2.20%
349Other Transmission and Distribution Plant5.00%
GENERAL PLANT
390Structures and Improvements2.90%
391Office Furniture and Equipment5.80%
391.1Computer Equipment26.70%
392Transportation Equipment13.30%
393Stores Equipment5.80%
394Tools, Shop and Garage Equipment5.80%
395Laboratory Equipment5.80%
396Power Operated Equipment7.50%
397Communication Equipment15.00%
397.1SCADA Equipment9.20%