p. 1PSC REF#:612702
Public Service Commission of Wisconsin
PUBLIC SERVICE COMMISSION OF WISCONSIN
5690-WR-110
Application of the City of Stevens Point, Portage County, Wisconsin, as a Water Public Utility, for Authority to Adjust Water Rates
RECEIVED: 9/25/2026 7:55:02 AM
FINAL DECISION
This is the Final Decision in the Class 1 proceeding conducted by the Public Service Commission of Wisconsin (Commission) on the application of Stevens Point Municipal Water Utility (applicant) for approval to increase water rates. This application is APPROVED, subject to conditions.
Introduction
The applicant applied to the Commission on March 3, 2026 for authority to increase water rates. The Commission authorized the applicant’s last conventional rate case (CRC) change in docket 5690-WR-109 in a Final Decision dated August 8, 2018. Since that Final Decision, the Commission authorized an additional rate increase through the simplified rate case process in 2021. In its application, the applicant stated that it filed for this rate increase because of multiple factors. The applicant has an ongoing long-term capital improvement plan and several larger infrastructure projects planned, including reconstruction on Business Hwy 51, development of a new pressure zone that includes a new water tower, and completion of Well No. 12. The rate increase will allow the applicant to be financially prepared to undertake these projects and fund future debt service requirements. The applicant also stated that operating and maintenance expenses have increased since the prior rate increase. In this rate case, the final overall rate change authorized is $2,368,170, or a 47.59 percent increase over current rates, for p. 2the test year ending December 31, 2026. The rate increase will occur in two steps. The applicant requested a Step II rate increase to recover the costs related to construction of the Well No. 12 project approved by the Commission in docket 5690-CW-108.
The authorized Step I increase of $2,185,264 will take effect following the issuance of this Final Decision. The authorized Step II increase of $2,368,170 is compared to the current rates and is an additional increase of $182,906 over Step I rates. The applicant will implement the remaining Step II increase of $182,906 when it notifies the Commission in writing that it has completed and placed in service the Well No. 12 project, as authorized in docket 5690-CW-108. (PSC REF#: 456557.)
Pursuant to due notice, the Commission held an audiovisual hearing on September 8, 2026 before Administrative Law Judge Michael E. Newmark. The parties, for purposes of review under Wis. Stat. § 227.53, are listed in Appendix A as required by Wis. Stat § 227.47. The applicant is the only party to this proceeding.
Findings of Fact
- 1.The applicant’s presently authorized rates for water utility service will produce operating revenues of $5,170,656 for Step I of the 2026 test year. These rates fall short of the test year revenue needed by $2,185,264 for Step I and are unreasonable.
- 2.The applicant’s presently authorized rates for water utility service will produce operating revenues of $5,170,656 for Step II of the 2026 test year. These rates fall short of the test year revenue needed by $2,368,170 for Step II and are unreasonable.
- 3.The estimated net investment rate base applicable to water utility operations for the 2026 test year in Step I is $36,384,299 and in Step II is $38,303,116.
- 4.p. 3The rate changes set forth for water service in Appendix C will permit the applicant to earn the necessary revenue requirement and are consistent with the cost of service and rate design.
Conclusions of Law
- 1.The applicant is a municipal public utility as defined in Wis. Stat. § 196.01(5)(a).
- 2.The Commission has authority under Wis. Stat. §§ 196.02(1), 196.03(1) and (3), 196.19, 196.20, 196.22, 196.37(1), (2), and (3), and 196.395 to authorize the applicant to increase water utility rates and revise tariff provisions.
- 3.The Commission has authority under Wis. Stat. § 15.02(4) to delegate to the Administrator of the Division of Water Utility Regulation and Analysis (Division Administrator) those functions vested by law as enumerated above and has delegated the authority to issue this Final Decision to the Division Administrator.
Opinion
Net Investment Rate Base
The estimated net investment rate base for the 2026 test year is as follows:
STEP I
| Utility Financed Plant in Service | $57,843,376 |
| Less: Accumulated Provision for Depreciation | $21,799,436 |
| Net Plant in Service | $36,043,940 |
| Plus: Materials and Supplies | $340,359 |
| Net Investment Rate Base | $36,384,299 |
STEP II
| Utility Financed Plant in Service | $59,820,376 |
| Less: Accumulated Provision for Depreciation | $21,857,619 |
| Net Plant in Service | $37,962,757 |
| Plus: Materials and Supplies | $340,359 |
| Net Investment Rate Base | $38,303,116 |
Comparative Income Statement
Commission staff submitted a revenue requirement for the test year as shown in Ex.-PSC-Revenue Requirement. (PSC REF#: 594493.) The estimated test year income statement showing the effect of the increase in revenue that will result from authorized rates is as follows:
| STEP I | At Present Rates | Authorized Increase | After Rate Increase |
|---|---|---|---|
| Operating Revenues | $5,170,656 | $2,185,264 | $7,355,920 |
| Operating Expenses: | |||
| Oper. & Maint. Exp. | $2,557,572 | $2,557,572 | |
| Depreciation | $1,501,159 | $1,501,159 | |
| Taxes & Tax Equiv. | $932,210 | $932,210 | |
| Total Oper. Expenses | $4,990,941 | $4,990,941 | |
| Oper. Income (or Loss) | $179,715 | $2,364,979 | |
| Rate of Return | 0.49% | 6.50% | |
| STEP II | At Present Rates | Authorized Increase | After Rate Increase |
|---|---|---|---|
| Operating Revenues | $5,170,656 | $2,368,170 | $7,538,826 |
| Operating Expenses: | |||
| Oper. & Maint. Exp. | $2,557,572 | $2,557,572 | |
| Depreciation | $1,559,342 | $1,559,342 | |
| Taxes & Tax Equiv. | $932,210 | $932,210 | |
| Total Oper. Expenses | $5,049,124 | $5,049,124 | |
| Oper. Income (or Loss) | $121,532 | $2,489,702 | |
| Rate of Return | 0.32% | 6.50% | |
Commission staff computed the depreciation expense included in the revenue requirement for the 2026 test year using the depreciation rates shown in Appendix E. For purposes of computing the depreciation expense on the average investment for each plant account, these depreciation rates are effective as of January 1, 2026.
Capital Structure
In its original application, the applicant included estimated additions to Utility-Financed Plant and related depreciation expense for the Well No. 12 project, as authorized in docket 5690-CW- 108, in Step I. The applicant also requested a Step II rate increase that included estimated costs for the construction of a new water tower to replace the existing Bliss Avenue Tower. The applicant stated in its responses to Commission staff that it will begin the Well No. 12 project construction in mid-2026 and will complete and place it into service in late 2027. Since it will not complete and place this project into service during the test year, Commission staff excluded the estimated additions from the Step I increase and included them in the Step II increase.
The applicant also stated in its responses to Commission staff that it has not submitted a construction authorization application for the Bliss Avenue Tower project and that it does not p. 6plan to seek construction authorization for the project until at least 2028, with construction commencing after the Commission grants authorization. This project timeline falls outside of the test year of Commission staff’s proposed revenue requirement. In addition, the applicant has not started the authorization process and the costs for the project and financing options are unknown. As such, Commission staff did not include any additions to Utility-Financed Plant related to the Bliss Avenue Tower project in the proposed Step II rate increase. Commission staff encourages the applicant to file a subsequent CRC application once the construction authorization process has concluded and an accurate cost estimate and project timeline is available.
The Commission utilizes a rate of return on net investment rate base (ROR) to ensure utilities can cover interest on outstanding debt, earn a return on equity capital that fairly compensates for investment risk, and preserve and attract capital in their long-term operations. The applicant originally requested an ROR of 6.70 percent for Step I and Step II. The Commission calculates a benchmark ROR weekly based on a three-month rolling average of municipal bond rates and determines a floor annually. The benchmark ROR return at the time Commission staff finalized the revenue requirement exhibit for this case was 6.50 percent.
The applicant responded to Commission staff after the Ex.-PSC-Revenue Requirement and Ex.-PSC-COSS and Rate Design exhibits were issued requesting a 4.50 percent ROR for Step I with the goal of reducing the rate increase for Step I and shifting a portion of the rate increase to Step II. (PSC REF#: 607043.) Commission staff will consider the two-step process when an applicant has an ongoing infrastructure project that it begins in the test year and that will complete and placed into service in the subsequent year. The applicant implements the Step II rate increase when it notifies the Commission that it has completed and placed the project into p. 7service. Due to the uncertainty of the timing of the Step II increase implementation, Commission staff did not recommend a lower ROR for the Step I increase. As such, the Commission find it reasonable to use the benchmark ROR of 6.50 percent for both the Step I and Step II increases.
For Step I, Commission staff estimated the applicant’s capital employed in providing public utility service associated with the net investment rate base in Step I to be 70.48 percent municipal equity and 29.52 percent long-term debt. The composite cost of debt is 3.75 percent. Commission staff proposed a return on rate base of 6.50 percent to provide a 7.51 percent return on municipal earning equity and 5.05 times interest coverage in Step I.
The Commission finds that a 6.50 percent ROR will provide the applicant with sufficient earnings to help address future capital and unforeseen operating needs and will also maintain confidence in the applicant’s financial integrity without resulting in customer rates that are excessive.
For Step II, Commission staff estimated the applicant’s capital employed in providing public utility service associated with the net investment rate base in Step II to be 70.45 percent municipal equity and 29.55 percent long-term debt. The composite cost of debt is 3.75 percent. Commission staff proposed a return on rate base of 6.50 percent to provide a 7.51 percent return on municipal earning equity and 5.31 times interest coverage in Step II. The applicant did not object to using the benchmark ROR of 6.50 percent for Step II.
The Commission finds that a 6.50 percent ROR will provide the applicant with sufficient earnings to help address future capital and unforeseen operating needs and will also maintain p. 8confidence in the applicant’s financial integrity without resulting in customer rates that are excessive.
Construction Cost Overrun
The Final Decision in docket 5690-CW-108, issued January 13, 2023, indicated that the applicant expected to complete the Well No. 12 project in October 2024 for a total cost of $1,920,000. (PSC REF#: 456557.) In the current proceeding, the applicant stated that construction is in progress, and that it will place Well No. 12 into service in late 2027. (PSC REF#: 590718.) The applicant also estimated total costs for the project of $2,570,000 in its current application. (PSC REF#: 581594.)
In recent Commission decisions, the Commission has allowed recovery of authorized construction costs but has denied consideration of additional costs until all the project costs are complete and can be thoroughly reviewed. As such, in Ex.-PSC-Revenue Requirement, Commission staff included total additions of $1,920,000 to the test year net investment rate base estimate, but did not include the additional $650,000 of estimated cost overruns. The Commission finds it reasonable to include the total cost of $1,920,000 in the calculation of net investment rate base. The Commission also finds it reasonable that recovery of the cost overruns can be considered once the applicant fully completes and places the construction project into service, and it submits final costs in a subsequent rate case.
Cost of Service
Commission staff analyzed the cost of supplying water for general service and for public fire protection (PFP) service using the base-extra capacity cost allocation method. This method first allocates the operating expenses to the service cost functional components of base, p. 9customer, extra-capacity maximum-day and extra capacity maximum-hour demand, and fire protection and then to each of the customer classes served. Commission staff provided summaries of these analyses in Schedules 8 and 11 of Ex.-PSC-COSS and Rate Design, which is Commission staff’s proposal in the record in this proceeding. (PSC REF#: 602878.) Appendix B shows customer class revenue requirements resulting from the cost analysis compared with revenues at authorized rates.
Rates
Water service rates authorized in this decision will result in a Step I estimated net operating income of approximately $2,364,979, which provides a 6.50 percent return on the water utility net investment rate base of $36,384,299, and a Step II estimated net operating income of approximately $2,489,703, which provides a 6.50 percent return on the water utility net investment rate base of $38,303,116. Commission staff provided the applicant with Commission staff’s proposed rates for review prior to the hearing, and the applicant had no objection to these rates.
As shown in attached Appendix B, the base-extra capacity cost allocation method results in a relatively wide range of increases in the charges to the various general service customer classes to reflect the cost of providing service to such classes. The percentage rate increase to any individual customer will not necessarily equal the overall percentage increase to the associated customer class but will depend on the specific water use of that customer.
The authorized rates as set forth in Appendix C are based on the cost of providing service to various customer classes or types of service. The Commission finds that the rates will result in all customers paying an appropriate amount for the service provided.
p. 10Commission staff computed some typical water bills for Single-Family Residential, Multifamily Residential, Commercial, Industrial, and Public Authority customers using Schedule Mg-1 to compare present rates with the new rates. That comparison is set forth in Appendix D.
For Step I, the authorized rates will increase annual revenues from water public utility service by an estimated $2,185,264. Commission staff estimates that $1,866,028 would be from general service customer charges, and $319,236 would be from PFP charges. The increase in Step I water utility revenues would result from a 33.64 percent increase in gross plant investment and a 29.86 percent increase in operating expenses since the applicant’s last CRC in 2018. For Step I, the authorized overall increase in customer rates is 43.94 percent and is comprised of a 44.51 percent increase in general service charges and a 40.85 percent increase in the PFP charge. Under the authorized Step I rates, a typical Single-Family Residential customer’s bill will increase 38.68 percent, including PFP.
For Step II, the authorized rates will increase annual revenues from water public utility service by an estimated $2,368,170. Commission staff estimates that $2,033,932 would be from general service customer charges, and $334,239 would be from PFP charges. The increase in Step II water utility revenues would result from a 37.40 percent increase in gross plant investment and a 31.38 percent increase in operating expenses since the applicant’s last CRC in 2018. For Step II, the authorized overall increase in customer rates is 47.61 percent and is comprised of a 48.52 percent increase in general service charges and a 42.77 percent increase in the PFP charge.
p. 11Step II rates include the Step I increase. Under Step II rates, a typical Single-Family Residential customer’s overall bill would increase 41.36 percent, including PFP, after Step II is implemented. That same customer would see an increase of 1.94 percent from Step I to Step II.
The larger increase in general service charges results from a greater proportion of the annual operating costs being allocated to general service compared to what was allocated at the time of the applicant’s last rate proceeding and is based on current ratios of maximum general service demand to available system fire protection capacity. The Commission finds that the larger increase in general service charges is reasonable, as it reflects the cost of providing service appropriately.
The applicant has agreed to revise its tariff provisions (operating rules and main extension rules) to be consistent with those of other Wisconsin water utilities, as shown in Ex.-PSC-COSS and Rate Design. The Commission finds that they are in accordance with Commission policy and the Wisconsin Administrative Code.
Change in the Utility’s Billing Cycle
On August 28, 2026, the applicant filed a request to change its meter reading and billing frequency from quarterly to monthly. (PSC REF#: 607623.) As shown in Ex.-PSC-COSS and Rate Design, Commission staff’s proposal in this proceeding contained both monthly and quarterly billing. (PSC REF#: 602878.) Commission staff reviewed the applicant’s request and considered that increasing the applicant’s billing frequency provides more timely information to customers, which gives them an opportunity to better manage their water use and bills. Additionally, monthly billing will help with the applicant’s cash flow, allowing for more regular revenue to be available for operating expenses. The Commission finds the applicant’s request to p. 12change its meter reading and billing frequency from quarterly to monthly to be just and reasonable. Accordingly, the authorized rates as set forth in Appendix C allow for the meter reading change and monthly billing only.
Public Comments
The Commission received no public comments on the Electronic Records Filing (ERF) system. No members of the public attended or provided comments at the hearing. Effective Date
The test year commenced on January 1, 2026. Pursuant to Wis. Stat. § 196.19, the changes in rates and tariff provisions that are authorized in this Final Decision take effect no sooner than one day after the date of service, provided that these rates and tariff provisions are filed with the Commission, and the applicant makes a copy of the new rates available to the public before this date by placing a copy of the new rates at locations where customer payments are accepted, on the applicant’s website, or in a form and place that is otherwise readily accessible to the public.
Order
- 1.This Final Decision takes effect one day after the date of service.
- 2.The authorized rate increases and tariff provisions shall take effect no sooner than one day after the day the applicant has: (a) filed these rates and tariff provisions with the Commission; and (b) made them available to the public at locations where customer payments are accepted, on the applicant’s website, or in a form and place that is otherwise readily accessible to the public, pursuant to Wis. Stat. § 196.19 and Wis. Admin. Code § PSC 185.33(1)(f). If a copy of the new rates and tariff provisions is not made available to the p. 13public when they are filed with the Commission, the new rates and tariff provisions shall take effect one day after the day they are made available to the public.
- 3.The Step I rates approved in this docket shall take effect no later than 90 days from the service date of this Final Decision or as directed by the Commission or Commission staff.
- 4.The Step II rates approved in this docket shall be effective after the applicant has informed the Commission, in writing, that it has completed and placed in service Well No. 12, which the Commission approved in docket 5690-CW-108.
- 5.Jurisdiction is retained.
Dated at Madison, Wisconsin, this 25th day of September, 2026.
For the Commission:
Andrew P. Galvin
Administrator
Division of Water Utility Regulation and Analysis
APG:EAL:rgs:kle DL:02164592
Attachments: Notice of Appeal Rights
Appendices A-E
PUBLIC SERVICE COMMISSION OF WISCONSIN
4822 Madison Yards Way
P.O. Box 7854
Madison, Wisconsin 53707-7854
NOTICE OF RIGHTS FOR REHEARING OR JUDICIAL REVIEW, THE
TIMES ALLOWED FOR EACH, AND THE IDENTIFICATION OF THE
PARTY TO BE NAMED AS RESPONDENT
The following notice is served on you as part of the Commission’s written decision. This general notice is for the purpose of ensuring compliance with Wis. Stat. § 227.48(2), and does not constitute a conclusion or admission that any particular party or person is necessarily aggrieved or that any particular decision or order is final or judicially reviewable.
PETITION FOR REHEARING
If this decision is an order following a contested case proceeding as defined in Wis. Stat. § 227.01(3), a person aggrieved by the decision has a right to petition the Commission for rehearing within 20 days of the date of service of this decision, as provided in Wis. Stat. § 227.49. The date of service is shown on the first page. If there is no date on the first page, the date of service is shown immediately above the signature line. The petition for rehearing must be filed with the Public Service Commission of Wisconsin and served on the parties. An appeal of this decision may also be taken directly to circuit court through the filing of a petition for judicial review. It is not necessary to first petition for rehearing.
PETITION FOR JUDICIAL REVIEW
A person aggrieved by this decision has a right to petition for judicial review as provided in Wis. Stat. § 227.53. In a contested case, the petition must be filed in circuit court and served upon the Public Service Commission of Wisconsin within 30 days of the date of service of this decision if there has been no petition for rehearing. If a timely petition for rehearing has been filed, the petition for judicial review must be filed within 30 days of the date of service of the order finally disposing of the petition for rehearing, or within 30 days after the final disposition of the petition for rehearing by operation of law pursuant to Wis. Stat. § 227.49(5), whichever is sooner. If an untimely petition for rehearing is filed, the 30-day period to petition for judicial review commences the date the Commission serves its original decision.1 The Public Service Commission of Wisconsin must be named as respondent in the petition for judicial review.
If this decision is an order denying rehearing, a person aggrieved who wishes to appeal must seek judicial review rather than rehearing. A second petition for rehearing is not permitted.
Revised: March 27, 2013
1 See Currier v. Wisconsin Dep’t of Revenue, 2006 WI App 12, 288 Wis. 2d 693, 709 N.W.2d 520.
Appendix A
CONTACT LIST FOR SERVICE BY PARTIES
PUBLIC SERVICE COMMISSION OF WISCONSIN
(Not a party but must be served per Wis. Stat. § 227.53)
MANUEL SANCHEZ-MOYANO; ERIK LINDGREN
4822 MADISON YARDS WAY
P.O. BOX 7854
MADISON, WI 53707
MANUEL.SANCHEZMOYANO@WISCONSIN.GOV;
ERIK.LINDGREN@WISCONSIN.GOV
STEVENS POINT MUNICIPAL WATER UTILITY
JOEL LEMKE
300 BLISS AVE
P.O. BOX 242
STEVENS POINT, WI 54881
JLEMKE@STEVENSPOINT.COM
Appendix B
Stevens Point Municipal Water Utility - Step I
Comparison of Revenue at Present Rates, Cost of Service, and Authorized Rates
| Cost of Service | Authorized Rates | |||||
|---|---|---|---|---|---|---|
| Customer Class | Revenue at Present Rates | Revenue Required | Increase over Present Rates | Revenue | Increase over Present Rates | Percent of Cost of Service |
| Residential | $1,638,367 | $2,270,568 | 38.59% | $2,264,093 | 38.19% | 99.71% |
| Multifamily Residential | $165,342 | $235,430 | 42.39% | $235,920 | 42.69% | 100.21% |
| Commercial | $830,508 | $1,163,625 | 40.11% | $1,186,178 | 42.83% | 101.94% |
| Industrial | $1,332,227 | $2,071,470 | 55.49% | $2,051,106 | 53.96% | 99.02% |
| Public Authority | $225,832 | $317,211 | 40.46% | $321,246 | 42.25% | 101.27% |
| Public Fire Protection | $781,491 | $1,100,727 | 40.85% | $1,101,063 | 40.89% | 100.03% |
| Total | $4,973,767 | $7,159,031 | 43.94% | $7,159,606 | 43.95% | 100.01% |
Stevens Point Municipal Water Utility - Step II
Comparison of Revenue at Present Rates, Cost of Service, and Authorized Rates
| Cost of Service | Authorized Rates | |||||
|---|---|---|---|---|---|---|
| Customer Class | Revenue at Present Rates | Revenue Required | Increase over Present Rates | Revenue | Increase over Present Rates | Percent of Cost of Service |
| Residential | $1,638,367 | $2,310,745 | 41.04% | $2,312,515 | 41.15% | 100.08% |
| Multifamily Residential | $165,342 | $242,058 | 46.40% | $241,643 | 46.15% | 99.83% |
| Commercial | $830,508 | $1,195,527 | 43.95% | $1,218,200 | 46.68% | 101.90% |
| Industrial | $1,332,227 | $2,151,975 | 61.53% | $2,125,490 | 59.54% | 98.77% |
| Public Authority | $225,832 | $325,903 | 44.31% | $328,970 | 45.67% | 100.94% |
| Public Fire Protection | $781,491 | $1,115,730 | 42.77% | $1,115,877 | 42.79% | 100.01% |
| Total | $4,973,767 | $7,341,937 | 47.61% | $7,342,695 | 47.63% | 100.01% |
Appendix C
Stevens Point Municipal Water Utility
Authorized Water Rates and Rules – Step I
Stevens Point Municipal Water Utility
Water Rate File Changes
Amended
F-1
Upf-1
Mg-1R
Mg-1MF
Mg-1NR
MI-1
Am-1
OC-1
Mpa-1
Ug-1
Sg-1
BW-1
R-1
Cz-1
X-1
X-2
X-3
X-4
Deleted
X-6
p. 19Schedule No. F-1
Stevens Point Municipal Water Utility
Public Fire Protection Service
Public fire protection service shall include the use of hydrants for fire protection service only and such quantities of water as may be demanded for the purpose of extinguishing fires within the service area. This service shall also include water used for testing equipment and training personnel. For all other purposes, the metered or other rates set forth, or as may be filed with the Public Service Commission shall apply.
Under Wis. Stat. § 196.03(3)(b), the municipality has chosen to have the utility bill the retail general service customers for public fire protection service.
Monthly Public Fire Protection Service Charges:
| ⅝ - inch meter: | $6.35 | 3 - inch meter: | $97.00 |
| ¾ - inch meter: | $6.35 | 4 - inch meter: | $159.00 |
| 1 - inch meter: | $16.00 | 6 - inch meter: | $317.00 |
| 1¼ - inch meter: | $24.00 | 8 - inch meter: | $507.00 |
| 1½ - inch meter: | $32.00 | 10 - inch meter: | $762.00 |
| 2 - inch meter: | $50.00 | 12 - inch meter: | $1,016.00 |
Customers who are provided service under Schedules Mg-1R, Mg-1MF, Mg-1NR, Ug-1, or Sg-1 shall also be subject to the charges in this schedule according to the size of their primary meter. Customers who are provided service under Schedule Am-1 are exempt from these charges for any additional meters.
Billing: Same as Schedule Mg-1R.
p. 20Schedule No. Upf-1
Stevens Point Municipal Water Utility
Private Fire Protection Service - Unmetered
This service shall consist of permanent or continuous unmetered connections to the main for the purpose of supplying water to private fire protection systems such as automatic sprinkler systems, standpipes, and private hydrants. This service shall also include reasonable quantities of water used for testing check valves and other backflow prevention devices.
Monthly Private Fire Protection Service Demand Charges:
| 2 - inch or smaller connection: | $6.00 |
| 3 - inch connection: | $11.00 |
| 4 - inch connection: | $18.00 |
| 6 - inch connection: | $36.00 |
| 8 - inch connection: | $60.00 |
| 10 - inch connection: | $90.00 |
| 12 - inch connection: | $120.00 |
| 14 - inch connection: | $150.00 |
| 16 - inch connection: | $180.00 |
Billing: Same as Schedule Mg-1R.
p. 21Schedule No. Mg-1R
Stevens Point Municipal Water Utility
General Service – Metered - Residential
Monthly Service Charges:
| ⅝ - inch meter: | $13.00 | 3 - inch meter: | $74.00 |
| ¾ - inch meter: | $13.00 | 4 - inch meter: | $108.00 |
| 1 - inch meter: | $19.00 | 6 - inch meter: | $182.00 |
| 1¼ - inch meter: | $26.00 | 8 - inch meter: | $269.00 |
| 1½ - inch meter: | $31.00 | 10 - inch meter: | $383.00 |
| 2 - inch meter: | $47.00 | 12 - inch meter: | $496.00 |
Plus Volume Charges:
All water used monthly: $2.12 per 100 cubic feet
Residential Class includes single-family homes, duplexes, and individually-metered condominiums, apartment buildings, and mobile home parks.
Billing: Bills for water service are rendered monthly and become due and payable upon issuance following the period for which service is rendered. A late payment charge of 1 percent per month will be added to bills not paid within 20 days of issuance. This late payment charge will be applied to the total unpaid balance for utility service, including unpaid late payment charges. The late payment charge is applicable to all customers. The utility customer may be given a written notice that the bill is overdue no sooner than 20 days after the bill is issued. Unless payment or satisfactory arrangement for payment is made within the next 10 days, service may be disconnected pursuant to Wis. Adm. Code ch. PSC 185.
Combined Metering: Volumetric meter readings will be combined for billing if the utility for its own convenience places more than one meter on a single water service lateral. Multiple meters placed for the purpose of identifying water not discharged into the sanitary sewer are not considered for utility convenience and shall not be combined for billing. This requirement does not preclude the utility from combining readings when metering configurations support such an approach. Meter readings from individually metered separate service laterals shall not be combined for billing purposes.
p. 22Schedule No. Mg-1MF
Stevens Point Municipal Water Utility
General Service – Metered – Multifamily Residential
Monthly Service Charges:
| ⅝ - inch meter: | $13.00 | 3 - inch meter: | $74.00 |
| ¾ - inch meter: | $13.00 | 4 - inch meter: | $108.00 |
| 1 - inch meter: | $19.00 | 6 - inch meter: | $182.00 |
| 1¼ - inch meter: | $26.00 | 8 - inch meter: | $269.00 |
| 1½ - inch meter: | $31.00 | 10 - inch meter: | $383.00 |
| 2 - inch meter: | $47.00 | 12 - inch meter: | $496.00 |
Plus Volume Charges:
All water used monthly: $2.18 per 100 cubic feet
Multifamily Class includes master-metered multifamily dwelling units such as condominiums, apartment buildings, and mobile homes.
Billing: Same as Schedule Mg-1R.
Combined Metering: Same as Schedule Mg-1R.
p. 23Schedule No. Mg-1NR
Stevens Point Municipal Water Utility
General Service – Metered - Nonresidential
Monthly Service Charges:
| ⅝ - inch meter: | $13.00 | 3 - inch meter: | $74.00 |
| ¾ - inch meter: | $13.00 | 4 - inch meter: | $108.00 |
| 1 - inch meter: | $19.00 | 6 - inch meter: | $182.00 |
| 1¼ - inch meter: | $26.00 | 8 - inch meter: | $269.00 |
| 1½ - inch meter: | $31.00 | 10 - inch meter: | $383.00 |
| 2 - inch meter: | $47.00 | 12 - inch meter: | $496.00 |
| Plus Volume Charges: | |||
| First 3,333 cubic feet used each month: | $2.30 per 100 cubic feet | ||
| Next 30,000 cubic feet used each month: | $2.10 per 100 cubic feet | ||
| Next 50,000 cubic feet used each month: | $1.90 per 100 cubic feet | ||
| Next 250,000 cubic feet used each month: | $1.70 per 100 cubic feet | ||
| Over 333,333 cubic feet used each month: | $1.30 per 100 cubic feet | ||
Nonresidential Class includes commercial, industrial, and public authority customers. Commercial customers include business entities and institutions, except governmental entities, that provide goods or services. Churches and parochial schools are not governmental and are classified as commercial. Industrial customers include customers who are engaged in the manufacture or production of goods. Public Authority customers include any department, agency, or entity of local, state, or federal government, including public schools, colleges, and universities.
Billing: Same as Schedule Mg-1R.
Combined Metering: Same as Schedule Mg-1R.
p. 24Schedule No. MI-1
Stevens Point Municipal Water Utility
Municipal Interconnection Charge
For emergency water service provided to Village of Plover and the Village of Whiting, the following charges shall apply.
Volume Charge: Applicable charge under Schedule Mg-1R.
Billing: Same as Schedule Mg-1R.
p. 25Schedule No. Am-1
Stevens Point Municipal Water Utility
Additional Meter Rental Charge
Upon request, the utility shall furnish and install additional meters to:
- A.Water service customers for the purpose of measuring the volume of water used that is not discharged into the sanitary sewer system; and
- B.Sewerage service customers who are not customers of the water utility for the purpose of determining the volume of sewage that is discharged into the sanitary sewer system.
The utility shall charge a meter installation charge of $45.00 and a monthly rental fee for the use of this additional meter.
Monthly Additional Meter Rental Charges:
| ⅝ - inch meter: | $6.50 |
| ¾ - inch meter: | $6.50 |
| 1 - inch meter: | $9.50 |
| 1¼ - inch meter: | $13.00 |
| 1½ - inch meter: | $15.50 |
| 2 - inch meter: | $23.50 |
This schedule applies only if the additional meter is installed on the same service lateral as the primary meter and either:
- A.The additional meter is ¾-inch or smaller if the metering configuration is the Addition Method; or
- B.The additional meter is 2-inch or smaller for all other metering configurations.
If the additional meter is larger than 6-inch or larger than ¾-inch and installed in the Addition Method, each meter shall be treated as a separate account and Schedule Mg-1R rates shall apply.
Billing: Same as Schedule Mg-1R.
p. 26Schedule No. OC-1
Stevens Point Municipal Water Utility
Other Charges
Payment Not Honored by Financial Institution Charge: The utility shall assess a $25.00 charge when a payment rendered for utility service is not honored by the customer’s financial institution. This charge may not be in addition to, but may be inclusive of, other such charges when the payment was for multiple services.
Special Billing Charge: The utility shall assess a $5.00 charge to the requestor to cover administrative expenses whenever an existing customer or the property owner requests a special billing outside of the normal utility billing. This charge may not be assessed to a new customer.
Special Meter Reading Charge: The utility shall assess a $10.00 charge to the requestor whenever an existing customer or the property owner requests a special meter reading by utility personnel on a date other than the regularly scheduled meter reading. This charge may not be assessed if the customer or the property owner provides the meter reading. This charge may not be assessed to a new customer.
Billing: Same as Schedule Mg-1R.
p. 27Schedule No. Mpa-1
Stevens Point Municipal Water Utility
Public Service
Metered Service
Water used by the City of Stevens Point on an intermittent basis for flushing sewers, street washing, flooding skating rinks, drinking fountains, etc., shall be metered and billed according to the rates set forth in Schedule Mg-1NR.
Unmetered Service
Where it is impossible to meter the service, the utility shall estimate the volume of water used based on the pressure, size of opening, and the period of time the water is used. The estimated quantity shall be billed at the volumetric rates set forth in Schedule Mg-1NR, excluding any service charges.
Billing: Same as Schedule Mg-1NR.
p. 28Schedule No. Ug-1
Stevens Point Municipal Water Utility
General Water Service - Unmetered
Service may be supplied temporarily on an unmetered basis where the utility cannot immediately install a water meter, including water used for construction. Unmetered service shall be billed the amount that would be charged to a metered residential customer using 500 cubic feet of water monthly under Schedule Mg-1R, including the service charge for a ⅝-inch meter. If the utility determines that actual usage exceeds 500 cubic feet of water monthly, an additional charge for the estimated excess usage shall be made according to the rates under Schedule Mg-1R.
This schedule applies only to customers with a 1-inch or smaller service connection. For customers with a larger service connection, the utility shall install a temporary meter and charges shall be based on the rates set forth under Schedule Mg-1R.
Billing: Same as Schedule Mg-1R.
p. 29Schedule No. Sg-1
Stevens Point Municipal Water Utility
Seasonal Service
Seasonal customers are general service customers who voluntarily request disconnection of water service and who resume service at the same location within 12 months of the disconnection, unless service has been provided to another customer at that location in the intervening period. The utility shall bill seasonal customers the applicable service charges under Schedule Mg-1R year-round, including the period of temporary disconnection.
Seasonal service shall include customers taking service under Schedule Mg-1R, Mg-1MF, Mg-1NR, Schedule Ug-1, or Schedule Am-1.
Upon reconnection, the utility shall apply a charge under Schedule R-1 and require payment of any unpaid charges under this schedule.
Billing: Same as Schedule Mg-1R, unless the utility and customer agree to an alternative payment schedule for the period of voluntary disconnection.
p. 30Schedule No. BW-1
Stevens Point Municipal Water Utility
Bulk Water
All bulk water supplied from the water system through hydrants or other connections shall be metered or estimated by the utility. Utility personnel or a party approved by the utility shall supervise the delivery of water.
Bulk water sales are:
- A.Water supplied by tank trucks or from hydrants for the purpose of extinguishing fires outside the utility's service area;
- B.Water supplied by tank trucks or from hydrants for purposes other than extinguishing fires, such as water used for irrigation or filling swimming pools; or,
- C.Water supplied from hydrants or other temporary connections for general service type applications, except that Schedule Ug-1 applies for water supplied for construction purposes.
A service charge of $45.00 and a charge for the volume of water used shall be billed to the party using the water. The volumetric charge shall be calculated using the highest volumetric rate for residential customers under Schedule Mg-1R. In addition, for meters that are assigned to bulk water customers for more than 7 days, the applicable service charge in Schedule Mg-1R will apply after the first 7 days.
The water utility may require a reasonable deposit for the temporary use of its equipment under this and other rate schedules. The deposit(s) collected shall be refunded upon return of the utility's equipment. Damaged or lost equipment shall be repaired or replaced at the customer's expense.
Billing: Same as Schedule Mg-1R.
p. 31Schedule No. R-1
Stevens Point Municipal Water Utility
Reconnection Charges
The utility shall assess a charge to reconnect a customer, which includes reinstalling a meter and turning on the valve at the curb stop, if necessary. A utility may not assess a charge for disconnecting a customer.
| During normal business hours: | $45.00 |
| After normal business hours: | $105.00 |
Billing: Same as Schedule Mg-1R.
p. 32Schedule No. Cz-1
Stevens Point Municipal Water Utility
Water Lateral Installation Charge
The utility shall charge a customer for the actual cost of installing a water service lateral from the main through curb stop and box if these costs are not contributed as part of a subdivision development or otherwise recovered under Wis. Stats. Chapter 66.
Billing: Same as Schedule Mg-1R.
p. 33Stevens Point Municipal Water Utility
Water Utility Operating Rules
Compliance with Rules
All persons now receiving water service from this water utility, or who may request service in the future, shall be considered as having agreed to be bound by the rules and regulations as filed with the Public Service Commission of Wisconsin.
Establishment of Service
Application for water service may be made in writing on a form furnished by the water utility. The application will contain the legal description of the property to be served, the name of the owner, the exact use to be made of the service, and the size of the service lateral and meter desired. Note particularly any special refrigeration, fire protection, or water-consuming air-conditioning equipment.
Service will be furnished only if (1) the premises have a frontage on a properly platted street or public strip in which a cast iron or other long-life water main has been laid, or where the property owner has agreed to and complied with the provisions of the water utility's filed main extension rule,
- (2)the property owner has installed or agrees to install a service lateral from the curb stop to the point of use that is not less than 6 feet below the surface of an established or proposed grade and meets the water utility's specifications, and (3) the premises have adequate piping beyond the metering point.
The owner of a multi-unit dwelling has the option of being served by individual metered water service to each unit. The owner, by selecting this option, is required to provide interior plumbing and meter settings to enable individual metered service to each unit and individual disconnection without affecting service to other units. Each meter and meter connection will be treated as a separate water utility account for the purpose of the filed rules and regulations.
No division of the water service lateral to any lot or parcel of land shall be made for the extension and independent metering of the supply to an adjoining lot or parcel of land. Except for duplexes, no division of a water service lateral shall be made at the curb for separate supplies for two or more separate premises having frontage on any street or public service strip, whether owned by the same or different parties. Duplexes may be served by one lateral provided (1) individual metered service and disconnection is provided and (2) it is permitted by local ordinance.
Buildings used in the same business, located on the same parcel, and served by a single lateral may have the customer’s water supply piping installed to a central point so that volume can be metered in one place.
The water utility may withhold approval of any application where full information of the purpose of such supply is not clearly indicated and set forth by the applicant property owner.
p. 34Stevens Point Municipal Water Utility
Water Utility Operating Rules
Reconnection of Service
Where the water utility has disconnected service at the customer’s request, a reconnection charge shall be made when the customer requests reconnection of service. See Schedule R-1 for the applicable rate.
A reconnection charge shall also be required from customers whose services are disconnected (shut off at curb stop box) because of nonpayment of bills when due. See Schedule R-1 for the applicable rate.
If reconnection is requested for the same location by any member of the same household, or, if a place of business, by any partner of the same business, it shall be considered as the same customer.
Temporary Metered Service, Meter, and Deposits
An applicant for temporary water service on a metered basis shall make and maintain a monetary deposit for each meter installed as security for payment for use of water and for such other charges which may arise from the use of the supply. A charge shall be made for setting the valve and furnishing and setting the meter. See Schedule BW-1 for the applicable rate.
Water for Construction
When water is requested for construction purposes or for filling tanks or other such uses, an application shall be made to the water utility, in writing, giving a statement of the amount of construction work to be done or the size of the tank to be filled, etc. Payment for the water for construction may be required in advance at the scheduled rates. The service lateral must be installed into the building before water can be used. No connection with the service lateral at the curb shall be made without special permission from the water utility. In no case will any employee of the water utility turn on water for construction work unless the contractor has obtained permission from the water utility.
Customers shall not allow contractors, masons, or other persons to take unmetered water from their premises without permission from the water utility. Any customer failing to comply with this provision may have water service discontinued and will be responsible for the cost of the estimated volume of water used.
p. 35Stevens Point Municipal Water Utility
Water Utility Operating Rules
Use of Hydrants
In cases where no other supply is available, permission may be granted by the water utility to use a hydrant. No hydrant shall be used until the proper meter and valve are installed. In no case shall any valve be installed or moved except by an employee of the water utility.
Before a valve is set, payment must be made for its setting and for the water to be used at the scheduled rates. Where applicable, see Schedule BW-1 for deposits and charges. Upon completing the use of the hydrant, the customer must notify the water utility to that effect.
Operation of Valves and Hydrants and Unauthorized Use of Water - Penalty
Any person who shall, without authority of the water utility, allow contractors, masons, or other unauthorized persons to take water from their premises, operate any valve connected with the street or supply mains, or open any fire hydrant connected with the distribution system, except for the purpose of extinguishing fire, or who shall wantonly damage or impair the same, shall be subject to a fine as provided by municipal ordinance. Utility permission for the use of hydrants applies only to such hydrants that are designated for the specific use.
Refunds of Monetary Deposits
All money deposited as security for payment of charges arising from the use of temporary water service on a metered basis, or for the return of a hydrant valve and fixtures if the water is used on an unmetered basis, will be refunded to the depositor on the termination of the use of water, the payment of all charges levied against the depositor, and the return of the water utility’s equipment.
Service Laterals
No water service lateral shall be laid through any trench having cinders, rubbish, rock or gravel fill, or any other material which may cause injury to or disintegration of the service lateral, unless adequate means of protection are provided by sand filling or such other insulation as may be approved by the water utility. Service laterals passing through curb or retaining walls shall be adequately safeguarded by provision of a channel space or pipe casing not less than twice the diameter of the service connection. The space between the service lateral and the channel or pipe casing shall be filled and lightly caulked with an oakum, mastic cement, or other resilient material and made impervious to moisture.
In backfilling the pipe trench, the service lateral must be protected against injury by carefully hand tamping the ground filling around the pipe. There should be at least 6 inches of ground filling over the pipe, and it should be free from hard lumps, rocks, stones, or other injurious material.
p. 36Stevens Point Municipal Water Utility
Water Utility Operating Rules
Service Laterals (continued)
All water service laterals shall be of undiminished size from the street main into the point of meter placement. Beyond the meter outlet valve, the piping shall be sized and proportioned to provide, on all floors, at all times, an equitable distribution of the water supply for the greatest probable number of fixtures or appliances operating simultaneously.
Replacement and Repair of Service Laterals
The service lateral from the main to and through the curb stop will be maintained and kept in repair and, when worn out, replaced at the expense of the water utility. The property owner shall maintain the service lateral from the curb stop to the point of use.
If an owner fails to repair a leaking or broken service lateral from the curb to the point of metering or use within such time as may appear reasonable to the water utility after notification has been served on the owner by the water utility, the water will be shut off and will not be turned on again until the repairs have been completed.
Abandonment of Service
If a property owner changes the use of a property currently receiving water service such that water service will no longer be needed in the future, the water utility may require the abandonment of the water service at the water main. In such case, the property owner may be responsible for all removal and/or repair costs, including the water main and the utility portion of the water service lateral.
Charges for Water Wasted Due to Leaks
See Wis. Admin. Code § PSC 185.35 or Schedule X-4, if applicable.
Thawing Frozen Service Laterals
See Wis. Admin. Code § PSC 185.88 or Schedule X-4, if applicable.
Curb Stop Boxes
The curb stop box is the property of the water utility. The water utility is responsible for its repair and maintenance. This includes maintaining, through adjustment, the curb stop box at an appropriate grade level where no direct action by the property owner or occupant has contributed to an elevation problem. The property owner is responsible for protecting the curb stop box from situations that could obstruct access to it or unduly expose it to harm. The water utility shall not be liable for failure to locate the curb stop box and shut off the water in case of a leak on the owner’s premises.
p. 37Stevens Point Municipal Water Utility
Water Utility Operating Rules
Installation of Meters
Meters will be owned, furnished, and installed by the water utility or a utility-approved contractor and are not to be disconnected or tampered with by the customer. All meters shall be so located that they shall be protected from obstructions and permit ready access for reading, inspection, and servicing, such location to be designated or approved by the water utility. All piping within the building must be supplied by the owner. Where additional meters are desired by the owner, the owner shall pay for all piping. Where applicable, see Schedule Am-1 for rates.
Repairs to Meters
Meters will be repaired by the water utility, and the cost of such repairs caused by ordinary wear and tear will be borne by the water utility.
Repair of any damage to a meter resulting from the carelessness of the owner of the premises, owner's agent, or tenant, or from the negligence of any one of them to properly secure and protect same, including any damage that may result from allowing a water meter to become frozen or to be damaged from the presence of hot water or steam in the meter, shall be paid for by the customer or the owner of the premises.
Service Piping for Meter Settings
Where the original service piping is installed for a new metered customer, where existing service piping is changed for the customer's convenience, or where a new meter is installed for an existing unmetered customer, the owner of the premises at his/her expense shall provide a suitable location and the proper connections for the meter. The meter setting and associated plumbing shall comply with the water utility’s standards. The water utility should be consulted as to the type and size of the meter setting.
Turning on Water
The water may only be turned on for a customer by an authorized employee of the water utility. Plumbers may turn the water on to test their work, but upon completion must leave the water turned off.
Sprinkling Restrictions and Emergency Water Conditions
Where the municipality has a policy regarding sprinkling restrictions and/or emergency water conditions, failure to comply with such may result in disconnection of service.
See Wis. Admin. Code § PSC 185.37.
p. 38Stevens Point Municipal Water Utility
Water Utility Operating Rules
Failure to Read Meters
Where the water utility is unable to read a meter, the fact will be plainly indicated on the bill, and either an estimated bill will be computed or the minimum charge applied. The difference shall be adjusted when the meter is again read, that is, the bill for the succeeding billing period will be computed with the gallons or cubic feet in each block of the rate schedule doubled, and credit will be given on that bill for the amount of the bill paid the preceding period. Only in unusual cases shall more than three consecutive estimated or minimum bills be rendered.
If the meter is damaged (see Surreptitious Use of Water) or fails to operate, the bill will be based on the average use during the past year, unless there is some reason why the use is not normal. If the average use cannot be properly determined, the bill will be estimated by some equitable method.
See Wis. Admin. Code § PSC 185.33.
Complaint Meter Tests
See Wis. Admin. Code § PSC 185.77.
Inspection of Premises
During reasonable hours, any officer or authorized employee of the water utility shall have the right of access to the premises supplied with service for the purpose of inspection or for the enforcement of the water utility's rules and regulations. Whenever appropriate, the water utility will make a systematic inspection of all unmetered water taps for the purpose of checking waste and unnecessary use of water.
See Wis. Stat. § 196.171.
Vacation of Premises
When premises are to be vacated, the water utility shall be notified, in writing, at once, so that it may remove the meter and shut off the water supply at the curb stop. The owner of the premises shall be liable for prosecution for any damage to the water utility’s property. See “Abandonment of Service” in Schedule X-1 for further information.
Deposits for Residential Service
See Wis. Admin. Code § PSC 185.36.
p. 39Stevens Point Municipal Water Utility
Water Utility Operating Rules
Deposits for Nonresidential Service
See Wis. Admin. Code § PSC 185.361.
Deferred Payment Agreement
See Wis. Admin. Code § PSC 185.38 or Schedule X-4, if applicable.
Dispute Procedures
See Wis. Admin. Code § PSC 185.39.
Disconnection and Refusal of Service
See Wis. Admin. Code § PSC 185.37.
The following is an example of a disconnection notice that the utility may use to provide the required notice to customers.
DISCONNECTION NOTICE
Dear Customer:
The bill enclosed with this notice includes your current charge for water utility service and your previous unpaid balance.
You have 10 days to pay the water utility service arrears or your service is subject to disconnection.
If you fail to pay the service arrears or fail to contact us within the 10 days allowed to make reasonable deferred payment arrangement or other suitable arrangement, we will proceed with disconnection action.
To avoid the inconvenience of service interruption and an additional charge of (amount) for reconnection, we urge you to pay the full arrears IMMEDIATELY AT ONE OF OUR OFFICES.
If you have entered into a Deferred Payment Agreement with us and have failed to make the deferred payments you agreed to, your service will be subject to disconnection unless you pay the entire amount due within 10 days.
If you have a reason for delaying the payment, call us and explain the situation.
p. 40Stevens Point Municipal Water Utility
Water Utility Operating Rules
Disconnection and Refusal of Service (continued)
DISCONNECTION NOTICE (continued)
PLEASE CALL THIS TELEPHONE NUMBER, (telephone number), IMMEDIATELY IF:
- 1.You dispute the notice of delinquent account.
- 2.You have a question about your water utility service arrears.
- 3.You are unable to pay the full amount of the bill and are willing to enter into a deferred payment agreement with us.
- 4.There are any circumstances you think should be taken into consideration before service is discontinued.
- 5.Any resident is seriously ill.
Illness Provision: If there is an existing medical emergency in your home and you furnish the water utility with a statement signed by either a licensed Wisconsin physician or a public health official, we will delay disconnection of service up to 21 days. The statement must identify the medical emergency and specify the period of time during which disconnection will aggravate the existing emergency.
Deferred Payment Agreements: If you are a residential customer and you are unable to pay the full amount of the water utility service arrears on your bill, you may contact the water utility to discuss arrangements to pay the arrears over an extended period of time.
This time payment agreement will require:
- 1.Payment of a reasonable amount at the time the agreement is made.
- 2.Payment of the remainder of the outstanding balance in monthly installments over a reasonable length of time.
- 3.Payment of all future water utility service bills in full by the due date.
In any situation where you are unable to resolve billing disputes or disputes about the grounds for proposed disconnection through contacts with our water utility, you may make an appeal to the Public Service Commission of Wisconsin by calling (800) 225-7729.
(WATER UTILITY NAME)
p. 41Stevens Point Municipal Water Utility
Water Utility Operating Rules
Collection of Overdue Bills
An amount owed by the customer may be levied as a tax as provided in Wis. Stat. § 66.0809.
Surreptitious Use of Water
When the water utility has reasonable evidence that a person is obtaining water, in whole or in part, by means of devices or methods used to stop or interfere with the proper metering of the water utility service being delivered, the water utility reserves the right to estimate and present immediately a bill for unmetered service as a result of such interference, and such bill shall be payable subject to a 24-hour disconnection of service. If the water utility disconnects the service for any such reason, the water utility will reconnect the service upon the following conditions:
- A.The customer will be required to deposit with the water utility an amount sufficient to guarantee the payment of the bills for water utility service.
- B.The customer will be required to pay the water utility for any and all damages to water utility equipment resulting from such interference with the metering.
- C.The customer must further agree to comply with reasonable requirements to protect the water utility against further losses.
See Wis. Stat. §§ 98.26 and 943.20.
Repairs to Mains
The water utility reserves the right to shut off the water supply in the mains temporarily to make repairs, alterations, or additions to the plant or system. When the circumstances will permit, the water utility will give notification, by newspaper publication or otherwise, of the discontinuance of the water supply. No credit will be allowed to customers for such temporary suspension of the water supply.
See Wis. Admin. Code § PSC 185.87.
Duty of Water Utility with Respect to Safety of the Public
It shall be the duty of the water utility to see that all open ditches for water mains, hydrants, and service laterals are properly guarded to prevent accident to any person or vehicle, and at night there shall be displayed proper signal lighting to ensure the safety of the public.
p. 42Stevens Point Municipal Water Utility
Water Utility Operating Rules
Handling Water Mains and Service Laterals in Excavation Trenches
Contractors must call Digger’s Hotline and ensure a location is done to establish the existence and location of all water mains and service laterals as provided in Wis. Stat. § 182.0175. Where water mains or service laterals have been removed, cut, or damaged during trench excavation, the contractors must, at their own expense, cause them to be replaced or repaired at once. Contractors must not shut off the water service laterals to any customer for a period exceeding 6 hours.
Protective Devices
- A.Protective Devices in General: The owner or occupant of every premise receiving water supply shall apply and maintain suitable means of protection of the premise supply and all appliances against damage arising in any manner from the use of the water supply, variation of water pressure, or any interruption of water supply. Particularly, such owner or occupant must protect water-cooled compressors for refrigeration systems by means of high and/or low pressure safety cutout devices. There shall likewise be provided means for the prevention of the transmission of water ram or noise of operation of any valve or appliance through the piping of their own or adjacent premises.
- B.Relief Valves: On all "closed systems" (i.e., systems having a check valve, pressure regulator, reducing valve, water filter, or softener), an effective pressure relief valve shall be installed at or near the top of the hot water tank or at the hot water distribution pipe connection to the tank. No stop valve shall be placed between the hot water tank and the relief valve or on the drain pipe. See applicable plumbing codes.
- C.Air Chambers: An air chamber or approved shock absorber shall be installed at the terminus of each riser, fixture branch, or hydraulic elevator main for the prevention of undue water hammer. The air chamber shall be sized in conformance with local plumbing codes. Where possible, the air chamber should be provided at its base with a valve for water drainage and replenishment of air.
Cross-Connections
Every person owning or occupying a premise receiving municipal water supply shall maintain such municipal water supply free from any connection, either of a direct or of an indirect nature, with a water supply from a foreign source or of any manner of connection with any fixture or appliance whereby water from a foreign supply or the waste from any fixture, appliance, or waste or soil pipe may flow or be siphoned or pumped into the piping of the municipal water system.
See Wis. Admin. Code § NR 811.06.
p. 43Stevens Point Municipal Water Utility
Water Main Extension Rule
Water mains will be extended for new customers on the following basis:
- A.Where the cost of the extension is to immediately be collected through assessment by the municipality against the abutting property, the procedure set forth under Wis. Stat. § 66.0703 will apply, and no additional customer contribution to the utility will be required.
- B.Where the municipality is unwilling or unable to make a special assessment, the extension will be made on a customer-financed basis as follows:
- 1.The applicant(s) will advance as a contribution in aid of construction the total amount equivalent to that which would have been assessed for all property under paragraph A.
- 2.Part of the contribution required in paragraph B.1. will be refundable. When additional customers are connected to the extended main within 10 years of the date of completion, contributions in aid of construction will be collected equal to the amount which would have been assessed under paragraph A. for the abutting property being served. This amount will be refunded to the original contributor(s). In no case will the contributions received from additional customers exceed the proportionate amount which would have been required under paragraph A., nor will it exceed the total assessable cost of the original extension.
- C.When a customer connects to a transmission main or connecting loop installed at utility expense within 10 years of the date of completion, there will be a contribution required of an amount equivalent to that which would have been assessed under paragraph A.
Stevens Point Municipal Water Utility
Water Main Installations in Platted Subdivisions
Application for installation of water mains in regularly platted real estate development subdivisions shall be filed with the utility.
If the developer, or a contractor employed by the developer, is to install the water mains (with the approval of the utility), the developer shall be responsible for the total cost of construction.
If the utility or its contractor is to install the water mains, the developer shall be required to advance to the utility, prior to the beginning of the construction, the total estimated cost of the extension. If the final costs exceed estimated costs, an additional billing will be made for the balance of the cost due. This balance is to be paid within 30 days. If final costs are less than estimated, a refund of the overpayment will be made by the water utility.
p. 45Stevens Point Municipal Water Utility
Water Customer Supplemental Rules
Compliance with Rules
All persons now receiving water service from this water utility, or who may request service in the future, shall be considered as having agreed to be bound by the rules and regulations as filed with the Public Service Commission of Wisconsin.
Charges for Water Wasted Due to Leaks
Pursuant to Wis. Admin. Code § 185.35(6) and the utility’s policy, when a leak unknown to the customer is found in an appliance or the plumbing, the utility shall estimate the water wasted due to the leak and bill for this excess usage at a reduced rate not less than the utility’s cost. If this provision applies, the utility shall bill the customer for excess usage at the lowest volumetric rate in the utility’s Schedule Mg-1NR, General Service – Metered - Nonresidential. No additional adjustments shall be made for water supplied after the customer has been notified of the leak and has had an opportunity to correct the condition.
Thawing Frozen Service Laterals
See Wis. Admin. Code § PSC 185.88.
Stevens Point Municipal Water Utility
Authorized Water Rates and Rules – Step II
Stevens Point Municipal Water Utility
Water Rate File Changes
Amended
F-1
Upf-1
Mg-1R
Mg-1MF
Mg-1NR
MI-1
Am-1
OC-1
Mpa-1
Ug-1
Sg-1
BW-1
R-1
Cz-1
X-1
X-2
X-3
X-4
p. 48Schedule No. F-1
Stevens Point Municipal Water Utility
Public Fire Protection Service
Public fire protection service shall include the use of hydrants for fire protection service only and such quantities of water as may be demanded for the purpose of extinguishing fires within the service area. This service shall also include water used for testing equipment and training personnel. For all other purposes, the metered or other rates set forth, or as may be filed with the Public Service Commission shall apply.
Under Wis. Stat. § 196.03(3)(b), the municipality has chosen to have the utility bill the retail general service customers for public fire protection service.
Monthly Public Fire Protection Service Charges:
| ⅝ - inch meter: | $6.43 | 3 - inch meter: | $97.00 |
| ¾ - inch meter: | $6.43 | 4 - inch meter: | $160.00 |
| 1 - inch meter: | $16.00 | 6 - inch meter: | $317.00 |
| 1¼ - inch meter: | $24.00 | 8 - inch meter: | $507.00 |
| 1½ - inch meter: | $32.00 | 10 - inch meter: | $762.00 |
| 2 - inch meter: | $52.00 | 12 - inch meter: | $1,030.00 |
Customers who are provided service under Schedules Mg-1R, Mg-1MF, Mg-1NR, Ug-1, or Sg-1 shall also be subject to the charges in this schedule according to the size of their primary meter. Customers who are provided service under Schedule Am-1 are exempt from these charges for any additional meters.
Billing: Same as Schedule Mg-1R.
p. 49Schedule No. Upf-1
Stevens Point Municipal Water Utility
Private Fire Protection Service - Unmetered
This service shall consist of permanent or continuous unmetered connections to the main for the purpose of supplying water to private fire protection systems such as automatic sprinkler systems, standpipes, and private hydrants. This service shall also include reasonable quantities of water used for testing check valves and other backflow prevention devices.
Monthly Private Fire Protection Service Demand Charges:
| 2 - inch or smaller connection: | $6.00 |
| 3 - inch connection: | $11.00 |
| 4 - inch connection: | $18.00 |
| 6 - inch connection: | $36.00 |
| 8 - inch connection: | $60.00 |
| 10 - inch connection: | $90.00 |
| 12 - inch connection: | $120.00 |
| 14 - inch connection: | $150.00 |
| 16 - inch connection: | $180.00 |
Billing: Same as Schedule Mg-1R.
p. 50Schedule No. Mg-1R
Stevens Point Municipal Water Utility
General Service – Metered - Residential
Monthly Service Charges:
| ⅝ - inch meter: | $13.00 | 3 - inch meter: | $74.00 |
| ¾ - inch meter: | $13.00 | 4 - inch meter: | $108.00 |
| 1 - inch meter: | $19.00 | 6 - inch meter: | $182.00 |
| 1¼ - inch meter: | $26.00 | 8 - inch meter: | $269.00 |
| 1½ - inch meter: | $31.00 | 10 - inch meter: | $383.00 |
| 2 - inch meter: | $47.00 | 12 - inch meter: | $496.00 |
Plus Volume Charges:
All water used monthly: $2.22 per 100 cubic feet
Residential Class includes single-family homes, duplexes, and individually-metered condominiums, apartment buildings, and mobile home parks.
Billing: Bills for water service are rendered monthly and become due and payable upon issuance following the period for which service is rendered. A late payment charge of 1 percent per month will be added to bills not paid within 20 days of issuance. This late payment charge will be applied to the total unpaid balance for utility service, including unpaid late payment charges. The late payment charge is applicable to all customers. The utility customer may be given a written notice that the bill is overdue no sooner than 20 days after the bill is issued. Unless payment or satisfactory arrangement for payment is made within the next 10 days, service may be disconnected pursuant to Wis. Adm. Code ch. PSC 185.
Combined Metering: Volumetric meter readings will be combined for billing if the utility for its own convenience places more than one meter on a single water service lateral. Multiple meters placed for the purpose of identifying water not discharged into the sanitary sewer are not considered for utility convenience and shall not be combined for billing. This requirement does not preclude the utility from combining readings when metering configurations support such an approach. Meter readings from individually metered separate service laterals shall not be combined for billing purposes.
p. 51Schedule No. Mg-1MF
Stevens Point Municipal Water Utility
General Service – Metered – Multifamily Residential
Monthly Service Charges:
| ⅝ - inch meter: | $13.00 | 3 - inch meter: | $74.00 |
| ¾ - inch meter: | $13.00 | 4 - inch meter: | $108.00 |
| 1 - inch meter: | $19.00 | 6 - inch meter: | $182.00 |
| 1¼ - inch meter: | $26.00 | 8 - inch meter: | $269.00 |
| 1½ - inch meter: | $31.00 | 10 - inch meter: | $383.00 |
| 2 - inch meter: | $47.00 | 12 - inch meter: | $496.00 |
Plus Volume Charges:
All water used monthly: $2.25 per 100 cubic feet
Multifamily Class includes master-metered multifamily dwelling units such as condominiums, apartment buildings, and mobile homes.
Billing: Same as Schedule Mg-1R.
Combined Metering: Same as Schedule Mg-1R.
p. 52Schedule No. Mg-1NR
Stevens Point Municipal Water Utility
General Service – Metered - Nonresidential
Monthly Service Charges:
| ⅝ - inch meter: | $13.00 | 3 - inch meter: | $74.00 |
| ¾ - inch meter: | $13.00 | 4 - inch meter: | $108.00 |
| 1 - inch meter: | $19.00 | 6 - inch meter: | $182.00 |
| 1¼ - inch meter: | $26.00 | 8 - inch meter: | $269.00 |
| 1½ - inch meter: | $31.00 | 10 - inch meter: | $383.00 |
| 2 - inch meter: | $47.00 | 12 - inch meter: | $496.00 |
| Plus Volume Charges: | |||
| First 3,333 cubic feet used each month: | $2.43 per 100 cubic feet | ||
| Next 10,000 cubic feet used each month: | $2.15 per 100 cubic feet | ||
| Next 50,000 cubic feet used each month: | $1.95 per 100 cubic feet | ||
| Next 250,000 cubic feet used each month: | $1.75 per 100 cubic feet | ||
| Over 333,333 cubic feet used each month: | $1.35 per 100 cubic feet | ||
Nonresidential Class includes commercial, industrial, and public authority customers. Commercial customers include business entities and institutions, except governmental entities, that provide goods or services. Churches and parochial schools are not governmental and are classified as commercial. Industrial customers include customers who are engaged in the manufacture or production of goods. Public Authority customers include any department, agency, or entity of local, state, or federal government, including public schools, colleges, and universities.
Billing: Same as Schedule Mg-1R.
Combined Metering: Same as Schedule Mg-1R.
p. 53Schedule No. MI-1
Stevens Point Municipal Water Utility
Municipal Interconnection Charge
For emergency water service provided to Village of Plover and the Village of Whiting, the following charges shall apply.
Volume Charge: Applicable charge under Schedule Mg-1R.
Billing: Same as Schedule Mg-1R.
p. 54Schedule No. Am-1
Stevens Point Municipal Water Utility
Additional Meter Rental Charge
Upon request, the utility shall furnish and install additional meters to:
- C.Water service customers for the purpose of measuring the volume of water used that is not discharged into the sanitary sewer system; and
- D.Sewerage service customers who are not customers of the water utility for the purpose of determining the volume of sewage that is discharged into the sanitary sewer system.
The utility shall charge a meter installation charge of $45.00 and a monthly rental fee for the use of this additional meter.
Monthly Additional Meter Rental Charges:
| ⅝ - inch meter: | $6.50 |
| ¾ - inch meter: | $6.50 |
| 1 - inch meter: | $9.50 |
| 1¼ - inch meter: | $13.00 |
| 1½ - inch meter: | $15.50 |
| 2 - inch meter: | $23.50 |
This schedule applies only if the additional meter is installed on the same service lateral as the primary meter and either:
- A.The additional meter is ¾-inch or smaller if the metering configuration is the Addition Method; or
- B.The additional meter is 2-inch or smaller for all other metering configurations.
If the additional meter is larger than 6-inch or larger than ¾-inch and installed in the Addition Method, each meter shall be treated as a separate account and Schedule Mg-1R rates shall apply.
Billing: Same as Schedule Mg-1R.
p. 55Schedule No. OC-1
Stevens Point Municipal Water Utility
Other Charges
Payment Not Honored by Financial Institution Charge: The utility shall assess a $25.00 charge when a payment rendered for utility service is not honored by the customer’s financial institution. This charge may not be in addition to, but may be inclusive of, other such charges when the payment was for multiple services.
Special Billing Charge: The utility shall assess a $5.00 charge to the requestor to cover administrative expenses whenever an existing customer or the property owner requests a special billing outside of the normal utility billing. This charge may not be assessed to a new customer.
Special Meter Reading Charge: The utility shall assess a $10.00 charge to the requestor whenever an existing customer or the property owner requests a special meter reading by utility personnel on a date other than the regularly scheduled meter reading. This charge may not be assessed if the customer or the property owner provides the meter reading. This charge may not be assessed to a new customer.
Billing: Same as Schedule Mg-1R.
p. 56Schedule No. Mpa-1
Stevens Point Municipal Water Utility
Public Service
Metered Service
Water used by the City of Stevens Point on an intermittent basis for flushing sewers, street washing, flooding skating rinks, drinking fountains, etc., shall be metered and billed according to the rates set forth in Schedule Mg-1NR.
Unmetered Service
Where it is impossible to meter the service, the utility shall estimate the volume of water used based on the pressure, size of opening, and the period of time the water is used. The estimated quantity shall be billed at the volumetric rates set forth in Schedule Mg-1NR, excluding any service charges.
Billing: Same as Schedule Mg-1NR.
p. 57Schedule No. Ug-1
Stevens Point Municipal Water Utility
General Water Service - Unmetered
Service may be supplied temporarily on an unmetered basis where the utility cannot immediately install a water meter, including water used for construction. Unmetered service shall be billed the amount that would be charged to a metered residential customer using 500 cubic feet of water monthly under Schedule Mg-1R, including the service charge for a ⅝-inch meter. If the utility determines that actual usage exceeds 500 cubic feet of water monthly, an additional charge for the estimated excess usage shall be made according to the rates under Schedule Mg-1R.
This schedule applies only to customers with a 1-inch or smaller service connection. For customers with a larger service connection, the utility shall install a temporary meter and charges shall be based on the rates set forth under Schedule Mg-1R.
Billing: Same as Schedule Mg-1R.
p. 58Schedule No. Sg-1
Stevens Point Municipal Water Utility
Seasonal Service
Seasonal customers are general service customers who voluntarily request disconnection of water service and who resume service at the same location within 12 months of the disconnection, unless service has been provided to another customer at that location in the intervening period. The utility shall bill seasonal customers the applicable service charges under Schedule Mg-1R year-round, including the period of temporary disconnection.
Seasonal service shall include customers taking service under Schedule Mg-1R, Mg-1MF, Mg-1NR, Schedule Ug-1, or Schedule Am-1.
Upon reconnection, the utility shall apply a charge under Schedule R-1 and require payment of any unpaid charges under this schedule.
Billing: Same as Schedule Mg-1R, unless the utility and customer agree to an alternative payment schedule for the period of voluntary disconnection.
p. 59Schedule No. BW-1
Stevens Point Municipal Water Utility
Bulk Water
All bulk water supplied from the water system through hydrants or other connections shall be metered or estimated by the utility. Utility personnel or a party approved by the utility shall supervise the delivery of water.
Bulk water sales are:
- A.Water supplied by tank trucks or from hydrants for the purpose of extinguishing fires outside the utility's service area;
- B.Water supplied by tank trucks or from hydrants for purposes other than extinguishing fires, such as water used for irrigation or filling swimming pools; or,
- C.Water supplied from hydrants or other temporary connections for general service type applications, except that Schedule Ug-1 applies for water supplied for construction purposes.
A service charge of $45.00 and a charge for the volume of water used shall be billed to the party using the water. The volumetric charge shall be calculated using the highest volumetric rate for residential customers under Schedule Mg-1R. In addition, for meters that are assigned to bulk water customers for more than 7 days, the applicable service charge in Schedule Mg-1R will apply after the first 7 days.
The water utility may require a reasonable deposit for the temporary use of its equipment under this and other rate schedules. The deposit(s) collected shall be refunded upon return of the utility's equipment. Damaged or lost equipment shall be repaired or replaced at the customer's expense.
Billing: Same as Schedule Mg-1R.
p. 60Schedule No. R-1
Stevens Point Municipal Water Utility
Reconnection Charges
The utility shall assess a charge to reconnect a customer, which includes reinstalling a meter and turning on the valve at the curb stop, if necessary. A utility may not assess a charge for disconnecting a customer.
| During normal business hours: | $45.00 |
| After normal business hours: | $105.00 |
Billing: Same as Schedule Mg-1R.
p. 61Schedule No. Cz-1
Stevens Point Municipal Water Utility
Water Lateral Installation Charge
The utility shall charge a customer for the actual cost of installing a water service lateral from the main through curb stop and box if these costs are not contributed as part of a subdivision development or otherwise recovered under Wis. Stats. Chapter 66.
Billing: Same as Schedule Mg-1R.
p. 62Stevens Point Municipal Water Utility
Water Utility Operating Rules
Compliance with Rules
All persons now receiving water service from this water utility, or who may request service in the future, shall be considered as having agreed to be bound by the rules and regulations as filed with the Public Service Commission of Wisconsin.
Establishment of Service
Application for water service may be made in writing on a form furnished by the water utility. The application will contain the legal description of the property to be served, the name of the owner, the exact use to be made of the service, and the size of the service lateral and meter desired. Note particularly any special refrigeration, fire protection, or water-consuming air-conditioning equipment.
Service will be furnished only if (1) the premises have a frontage on a properly platted street or public strip in which a cast iron or other long-life water main has been laid, or where the property owner has agreed to and complied with the provisions of the water utility's filed main extension rule,
- (2)the property owner has installed or agrees to install a service lateral from the curb stop to the point of use that is not less than 6 feet below the surface of an established or proposed grade and meets the water utility's specifications, and (3) the premises have adequate piping beyond the metering point.
The owner of a multi-unit dwelling has the option of being served by individual metered water service to each unit. The owner, by selecting this option, is required to provide interior plumbing and meter settings to enable individual metered service to each unit and individual disconnection without affecting service to other units. Each meter and meter connection will be treated as a separate water utility account for the purpose of the filed rules and regulations.
No division of the water service lateral to any lot or parcel of land shall be made for the extension and independent metering of the supply to an adjoining lot or parcel of land. Except for duplexes, no division of a water service lateral shall be made at the curb for separate supplies for two or more separate premises having frontage on any street or public service strip, whether owned by the same or different parties. Duplexes may be served by one lateral provided (1) individual metered service and disconnection is provided and (2) it is permitted by local ordinance.
Buildings used in the same business, located on the same parcel, and served by a single lateral may have the customer’s water supply piping installed to a central point so that volume can be metered in one place.
The water utility may withhold approval of any application where full information of the purpose of such supply is not clearly indicated and set forth by the applicant property owner.
p. 63Stevens Point Municipal Water Utility
Water Utility Operating Rules
Reconnection of Service
Where the water utility has disconnected service at the customer’s request, a reconnection charge shall be made when the customer requests reconnection of service. See Schedule R-1 for the applicable rate.
A reconnection charge shall also be required from customers whose services are disconnected (shut off at curb stop box) because of nonpayment of bills when due. See Schedule R-1 for the applicable rate.
If reconnection is requested for the same location by any member of the same household, or, if a place of business, by any partner of the same business, it shall be considered as the same customer.
Temporary Metered Service, Meter, and Deposits
An applicant for temporary water service on a metered basis shall make and maintain a monetary deposit for each meter installed as security for payment for use of water and for such other charges which may arise from the use of the supply. A charge shall be made for setting the valve and furnishing and setting the meter. See Schedule BW-1 for the applicable rate.
Water for Construction
When water is requested for construction purposes or for filling tanks or other such uses, an application shall be made to the water utility, in writing, giving a statement of the amount of construction work to be done or the size of the tank to be filled, etc. Payment for the water for construction may be required in advance at the scheduled rates. The service lateral must be installed into the building before water can be used. No connection with the service lateral at the curb shall be made without special permission from the water utility. In no case will any employee of the water utility turn on water for construction work unless the contractor has obtained permission from the water utility.
Customers shall not allow contractors, masons, or other persons to take unmetered water from their premises without permission from the water utility. Any customer failing to comply with this provision may have water service discontinued and will be responsible for the cost of the estimated volume of water used.
p. 64Stevens Point Municipal Water Utility
Water Utility Operating Rules
Use of Hydrants
In cases where no other supply is available, permission may be granted by the water utility to use a hydrant. No hydrant shall be used until the proper meter and valve are installed. In no case shall any valve be installed or moved except by an employee of the water utility.
Before a valve is set, payment must be made for its setting and for the water to be used at the scheduled rates. Where applicable, see Schedule BW-1 for deposits and charges. Upon completing the use of the hydrant, the customer must notify the water utility to that effect.
Operation of Valves and Hydrants and Unauthorized Use of Water - Penalty
Any person who shall, without authority of the water utility, allow contractors, masons, or other unauthorized persons to take water from their premises, operate any valve connected with the street or supply mains, or open any fire hydrant connected with the distribution system, except for the purpose of extinguishing fire, or who shall wantonly damage or impair the same, shall be subject to a fine as provided by municipal ordinance. Utility permission for the use of hydrants applies only to such hydrants that are designated for the specific use.
Refunds of Monetary Deposits
All money deposited as security for payment of charges arising from the use of temporary water service on a metered basis, or for the return of a hydrant valve and fixtures if the water is used on an unmetered basis, will be refunded to the depositor on the termination of the use of water, the payment of all charges levied against the depositor, and the return of the water utility’s equipment.
Service Laterals
No water service lateral shall be laid through any trench having cinders, rubbish, rock or gravel fill, or any other material which may cause injury to or disintegration of the service lateral, unless adequate means of protection are provided by sand filling or such other insulation as may be approved by the water utility. Service laterals passing through curb or retaining walls shall be adequately safeguarded by provision of a channel space or pipe casing not less than twice the diameter of the service connection. The space between the service lateral and the channel or pipe casing shall be filled and lightly caulked with an oakum, mastic cement, or other resilient material and made impervious to moisture.
In backfilling the pipe trench, the service lateral must be protected against injury by carefully hand tamping the ground filling around the pipe. There should be at least 6 inches of ground filling over the pipe, and it should be free from hard lumps, rocks, stones, or other injurious material.
p. 65Stevens Point Municipal Water Utility
Water Utility Operating Rules
Service Laterals (continued)
All water service laterals shall be of undiminished size from the street main into the point of meter placement. Beyond the meter outlet valve, the piping shall be sized and proportioned to provide, on all floors, at all times, an equitable distribution of the water supply for the greatest probable number of fixtures or appliances operating simultaneously.
Replacement and Repair of Service Laterals
The service lateral from the main to and through the curb stop will be maintained and kept in repair and, when worn out, replaced at the expense of the water utility. The property owner shall maintain the service lateral from the curb stop to the point of use.
If an owner fails to repair a leaking or broken service lateral from the curb to the point of metering or use within such time as may appear reasonable to the water utility after notification has been served on the owner by the water utility, the water will be shut off and will not be turned on again until the repairs have been completed.
Abandonment of Service
If a property owner changes the use of a property currently receiving water service such that water service will no longer be needed in the future, the water utility may require the abandonment of the water service at the water main. In such case, the property owner may be responsible for all removal and/or repair costs, including the water main and the utility portion of the water service lateral.
Charges for Water Wasted Due to Leaks
See Wis. Admin. Code § PSC 185.35 or Schedule X-4, if applicable.
Thawing Frozen Service Laterals
See Wis. Admin. Code § PSC 185.88 or Schedule X-4, if applicable.
Curb Stop Boxes
The curb stop box is the property of the water utility. The water utility is responsible for its repair and maintenance. This includes maintaining, through adjustment, the curb stop box at an appropriate grade level where no direct action by the property owner or occupant has contributed to an elevation problem. The property owner is responsible for protecting the curb stop box from situations that could obstruct access to it or unduly expose it to harm. The water utility shall not be liable for failure to locate the curb stop box and shut off the water in case of a leak on the owner’s premises.
p. 66Stevens Point Municipal Water Utility
Water Utility Operating Rules
Installation of Meters
Meters will be owned, furnished, and installed by the water utility or a utility-approved contractor and are not to be disconnected or tampered with by the customer. All meters shall be so located that they shall be protected from obstructions and permit ready access for reading, inspection, and servicing, such location to be designated or approved by the water utility. All piping within the building must be supplied by the owner. Where additional meters are desired by the owner, the owner shall pay for all piping. Where applicable, see Schedule Am-1 for rates.
Repairs to Meters
Meters will be repaired by the water utility, and the cost of such repairs caused by ordinary wear and tear will be borne by the water utility.
Repair of any damage to a meter resulting from the carelessness of the owner of the premises, owner's agent, or tenant, or from the negligence of any one of them to properly secure and protect same, including any damage that may result from allowing a water meter to become frozen or to be damaged from the presence of hot water or steam in the meter, shall be paid for by the customer or the owner of the premises.
Service Piping for Meter Settings
Where the original service piping is installed for a new metered customer, where existing service piping is changed for the customer's convenience, or where a new meter is installed for an existing unmetered customer, the owner of the premises at his/her expense shall provide a suitable location and the proper connections for the meter. The meter setting and associated plumbing shall comply with the water utility’s standards. The water utility should be consulted as to the type and size of the meter setting.
Turning on Water
The water may only be turned on for a customer by an authorized employee of the water utility. Plumbers may turn the water on to test their work, but upon completion must leave the water turned off.
Sprinkling Restrictions and Emergency Water Conditions
Where the municipality has a policy regarding sprinkling restrictions and/or emergency water conditions, failure to comply with such may result in disconnection of service.
See Wis. Admin. Code § PSC 185.37.
p. 67Stevens Point Municipal Water Utility
Water Utility Operating Rules
Failure to Read Meters
Where the water utility is unable to read a meter, the fact will be plainly indicated on the bill, and either an estimated bill will be computed or the minimum charge applied. The difference shall be adjusted when the meter is again read, that is, the bill for the succeeding billing period will be computed with the gallons or cubic feet in each block of the rate schedule doubled, and credit will be given on that bill for the amount of the bill paid the preceding period. Only in unusual cases shall more than three consecutive estimated or minimum bills be rendered.
If the meter is damaged (see Surreptitious Use of Water) or fails to operate, the bill will be based on the average use during the past year, unless there is some reason why the use is not normal. If the average use cannot be properly determined, the bill will be estimated by some equitable method.
See Wis. Admin. Code § PSC 185.33.
Complaint Meter Tests
See Wis. Admin. Code § PSC 185.77.
Inspection of Premises
During reasonable hours, any officer or authorized employee of the water utility shall have the right of access to the premises supplied with service for the purpose of inspection or for the enforcement of the water utility's rules and regulations. Whenever appropriate, the water utility will make a systematic inspection of all unmetered water taps for the purpose of checking waste and unnecessary use of water.
See Wis. Stat. § 196.171.
Vacation of Premises
When premises are to be vacated, the water utility shall be notified, in writing, at once, so that it may remove the meter and shut off the water supply at the curb stop. The owner of the premises shall be liable for prosecution for any damage to the water utility’s property. See “Abandonment of Service” in Schedule X-1 for further information.
Deposits for Residential Service
See Wis. Admin. Code § PSC 185.36.
p. 68Stevens Point Municipal Water Utility
Water Utility Operating Rules
Deposits for Nonresidential Service
See Wis. Admin. Code § PSC 185.361.
Deferred Payment Agreement
See Wis. Admin. Code § PSC 185.38 or Schedule X-4, if applicable.
Dispute Procedures
See Wis. Admin. Code § PSC 185.39.
Disconnection and Refusal of Service
See Wis. Admin. Code § PSC 185.37.
The following is an example of a disconnection notice that the utility may use to provide the required notice to customers.
DISCONNECTION NOTICE
Dear Customer:
The bill enclosed with this notice includes your current charge for water utility service and your previous unpaid balance.
You have 10 days to pay the water utility service arrears or your service is subject to disconnection.
If you fail to pay the service arrears or fail to contact us within the 10 days allowed to make reasonable deferred payment arrangement or other suitable arrangement, we will proceed with disconnection action.
To avoid the inconvenience of service interruption and an additional charge of (amount) for reconnection, we urge you to pay the full arrears IMMEDIATELY AT ONE OF OUR OFFICES.
If you have entered into a Deferred Payment Agreement with us and have failed to make the deferred payments you agreed to, your service will be subject to disconnection unless you pay the entire amount due within 10 days.
If you have a reason for delaying the payment, call us and explain the situation.
p. 69Stevens Point Municipal Water Utility
Water Utility Operating Rules
Disconnection and Refusal of Service (continued)
DISCONNECTION NOTICE (continued)
PLEASE CALL THIS TELEPHONE NUMBER, (telephone number), IMMEDIATELY IF:
- 1.You dispute the notice of delinquent account.
- 2.You have a question about your water utility service arrears.
- 3.You are unable to pay the full amount of the bill and are willing to enter into a deferred payment agreement with us.
- 4.There are any circumstances you think should be taken into consideration before service is discontinued.
- 5.Any resident is seriously ill.
Illness Provision: If there is an existing medical emergency in your home and you furnish the water utility with a statement signed by either a licensed Wisconsin physician or a public health official, we will delay disconnection of service up to 21 days. The statement must identify the medical emergency and specify the period of time during which disconnection will aggravate the existing emergency.
Deferred Payment Agreements: If you are a residential customer and you are unable to pay the full amount of the water utility service arrears on your bill, you may contact the water utility to discuss arrangements to pay the arrears over an extended period of time.
This time payment agreement will require:
- 1.Payment of a reasonable amount at the time the agreement is made.
- 2.Payment of the remainder of the outstanding balance in monthly installments over a reasonable length of time.
- 3.Payment of all future water utility service bills in full by the due date.
In any situation where you are unable to resolve billing disputes or disputes about the grounds for proposed disconnection through contacts with our water utility, you may make an appeal to the Public Service Commission of Wisconsin by calling (800) 225-7729.
(WATER UTILITY NAME)
p. 70Stevens Point Municipal Water Utility
Water Utility Operating Rules
Collection of Overdue Bills
An amount owed by the customer may be levied as a tax as provided in Wis. Stat. § 66.0809.
Surreptitious Use of Water
When the water utility has reasonable evidence that a person is obtaining water, in whole or in part, by means of devices or methods used to stop or interfere with the proper metering of the water utility service being delivered, the water utility reserves the right to estimate and present immediately a bill for unmetered service as a result of such interference, and such bill shall be payable subject to a 24-hour disconnection of service. If the water utility disconnects the service for any such reason, the water utility will reconnect the service upon the following conditions:
- A.The customer will be required to deposit with the water utility an amount sufficient to guarantee the payment of the bills for water utility service.
- B.The customer will be required to pay the water utility for any and all damages to water utility equipment resulting from such interference with the metering.
- C.The customer must further agree to comply with reasonable requirements to protect the water utility against further losses.
See Wis. Stat. §§ 98.26 and 943.20.
Repairs to Mains
The water utility reserves the right to shut off the water supply in the mains temporarily to make repairs, alterations, or additions to the plant or system. When the circumstances will permit, the water utility will give notification, by newspaper publication or otherwise, of the discontinuance of the water supply. No credit will be allowed to customers for such temporary suspension of the water supply.
See Wis. Admin. Code § PSC 185.87.
Duty of Water Utility with Respect to Safety of the Public
It shall be the duty of the water utility to see that all open ditches for water mains, hydrants, and service laterals are properly guarded to prevent accident to any person or vehicle, and at night there shall be displayed proper signal lighting to ensure the safety of the public.
p. 71Stevens Point Municipal Water Utility
Water Utility Operating Rules
Handling Water Mains and Service Laterals in Excavation Trenches
Contractors must call Digger’s Hotline and ensure a location is done to establish the existence and location of all water mains and service laterals as provided in Wis. Stat. § 182.0175. Where water mains or service laterals have been removed, cut, or damaged during trench excavation, the contractors must, at their own expense, cause them to be replaced or repaired at once. Contractors must not shut off the water service laterals to any customer for a period exceeding 6 hours.
Protective Devices
- A.Protective Devices in General: The owner or occupant of every premise receiving water supply shall apply and maintain suitable means of protection of the premise supply and all appliances against damage arising in any manner from the use of the water supply, variation of water pressure, or any interruption of water supply. Particularly, such owner or occupant must protect water-cooled compressors for refrigeration systems by means of high and/or low pressure safety cutout devices. There shall likewise be provided means for the prevention of the transmission of water ram or noise of operation of any valve or appliance through the piping of their own or adjacent premises.
- B.Relief Valves: On all "closed systems" (i.e., systems having a check valve, pressure regulator, reducing valve, water filter, or softener), an effective pressure relief valve shall be installed at or near the top of the hot water tank or at the hot water distribution pipe connection to the tank. No stop valve shall be placed between the hot water tank and the relief valve or on the drain pipe. See applicable plumbing codes.
- C.Air Chambers: An air chamber or approved shock absorber shall be installed at the terminus of each riser, fixture branch, or hydraulic elevator main for the prevention of undue water hammer. The air chamber shall be sized in conformance with local plumbing codes. Where possible, the air chamber should be provided at its base with a valve for water drainage and replenishment of air.
Cross-Connections
Every person owning or occupying a premise receiving municipal water supply shall maintain such municipal water supply free from any connection, either of a direct or of an indirect nature, with a water supply from a foreign source or of any manner of connection with any fixture or appliance whereby water from a foreign supply or the waste from any fixture, appliance, or waste or soil pipe may flow or be siphoned or pumped into the piping of the municipal water system.
See Wis. Admin. Code § NR 811.06.
p. 72Stevens Point Municipal Water Utility
Water Main Extension Rule
Water mains will be extended for new customers on the following basis:
- A.Where the cost of the extension is to immediately be collected through assessment by the municipality against the abutting property, the procedure set forth under Wis. Stat. § 66.0703 will apply, and no additional customer contribution to the utility will be required.
- B.Where the municipality is unwilling or unable to make a special assessment, the extension will be made on a customer-financed basis as follows:
- 1.The applicant(s) will advance as a contribution in aid of construction the total amount equivalent to that which would have been assessed for all property under paragraph A.
- 2.Part of the contribution required in paragraph B.1. will be refundable. When additional customers are connected to the extended main within 10 years of the date of completion, contributions in aid of construction will be collected equal to the amount which would have been assessed under paragraph A. for the abutting property being served. This amount will be refunded to the original contributor(s). In no case will the contributions received from additional customers exceed the proportionate amount which would have been required under paragraph A., nor will it exceed the total assessable cost of the original extension.
- C.When a customer connects to a transmission main or connecting loop installed at utility expense within 10 years of the date of completion, there will be a contribution required of an amount equivalent to that which would have been assessed under paragraph A.
Stevens Point Municipal Water Utility
Water Main Installations in Platted Subdivisions
Application for installation of water mains in regularly platted real estate development subdivisions shall be filed with the utility.
If the developer, or a contractor employed by the developer, is to install the water mains (with the approval of the utility), the developer shall be responsible for the total cost of construction.
If the utility or its contractor is to install the water mains, the developer shall be required to advance to the utility, prior to the beginning of the construction, the total estimated cost of the extension. If the final costs exceed estimated costs, an additional billing will be made for the balance of the cost due. This balance is to be paid within 30 days. If final costs are less than estimated, a refund of the overpayment will be made by the water utility.
Stevens Point Municipal Water Utility
Water Customer Supplemental Rules
Compliance with Rules
All persons now receiving water service from this water utility, or who may request service in the future, shall be considered as having agreed to be bound by the rules and regulations as filed with the Public Service Commission of Wisconsin.
Charges for Water Wasted Due to Leaks
Pursuant to Wis. Admin. Code § 185.35(6) and the utility’s policy, when a leak unknown to the customer is found in an appliance or the plumbing, the utility shall estimate the water wasted due to the leak and bill for this excess usage at a reduced rate not less than the utility’s cost. If this provision applies, the utility shall bill the customer for excess usage at the lowest volumetric rate in the utility’s Schedule Mg-1NR, General Service – Metered - Nonresidential. No additional adjustments shall be made for water supplied after the customer has been notified of the leak and has had an opportunity to correct the condition.
Thawing Frozen Service Laterals
See Wis. Admin. Code § PSC 185.88.
Appendix D
Stevens Point Municipal Water Utility - Step I
Customer Water Bill Comparison at Present and Authorized Rates
Quarterly Including
| Customer Type | Meter Size | Volume (100 Cubic Feet) | Quarterly Bills at Current Step I Rates Rates | Percent Change | Public Fire Protection Bills at Current Step I Rates Rates | Percent Change |
|---|---|---|---|---|---|---|
| Small Residential | 3/4" | 8 | $41.18 $ 55.96 | 35.89% | $54.71 $ 75.01 | 37.10% |
| Average Residential | 3/4" | 15 | $51.26 $ 70.80 | 38.12% | $64.79 $ 89.85 | 38.68% |
| Large Residential | 3/4" | 30 | $72.86 $ 102.60 | 40.82% | $86.39 $ 121.65 | 40.81% |
| Large Residential | 3/4" | 40 | $87.26 $ 123.80 | 41.87% | $100.79 $ 142.85 | 41.73% |
| Large Residential | 3/4" | 60 | $116.06 $ 166.20 | 43.20% | $129.59 $ 185.25 | 42.95% |
| Multifamily Residential | 2" | 550 | $924.56 $ 1,340.00 | 44.93% | $1,032.71 $ 1,490.00 | 44.28% |
| Multifamily Residential | 2" | 1,500 | $2,340.06 $ 3,411.00 | 45.77% | $2,448.21 $ 3,561.00 | 45.45% |
| Multifamily Residential | 3" | 750 | $1,284.36 $ 1,857.00 | 44.59% | $1,485.21 $ 2,148.00 | 44.63% |
| Multifamily Residential | 4" | 3,600 | $5,614.29 $ 8,172.00 | 45.56% | $5,951.10 $ 8,649.00 | 45.33% |
| Commercial | 2" | 2,350 | $3,315.56 $ 4,826.00 | 45.56% | $3,423.71 $ 4,976.00 | 45.34% |
| Commercial | 3" | 3,100 | $4,158.86 $ 6,212.00 | 49.37% | $4,359.71 $ 6,503.00 | 49.16% |
| Commercial | 4" | 3,600 | $4,732.29 $ 7,164.00 | 51.39% | $5,069.10 $ 7,641.00 | 50.74% |
| Commercial | 6" | 8,500 | $9,722.78 $ 15,716.00 | 61.64% | $10,399.49 $ 16,667.00 | 60.27% |
| Industrial | 2" | 800 | $1,282.06 $ 1,841.00 | 43.60% | $1,390.21 $ 1,991.00 | 43.22% |
| Industrial | 4" | 4,000 | $5,124.29 $ 7,844.00 | 53.07% | $5,461.10 $ 8,321.00 | 52.37% |
| Industrial | 4" | 6,000 | $7,084.29 $ 11,244.00 | 58.72% | $7,421.10 $ 11,721.00 | 57.94% |
| Industrial | 10" | 330,000 | $283,733.53 $ 434,869.00 | 53.27% | $285,355.78 $ 437,155.00 | 53.20% |
| Public Authority | 3" | 5,400 | $6,412.86 $ 10,122.00 | 57.84% | $6,613.71 $ 10,413.00 | 57.45% |
| Public Authority | 4" | 1,000 | $1,719.29 $ 2,444.00 | 42.15% | $2,056.10 $ 2,921.00 | 42.07% |
| Public Authority | 4" | 1,300 | $2,106.29 $ 3,014.00 | 43.10% | $2,443.10 $ 3,491.00 | 42.89% |
| Public Authority | 4" | 3,800 | $4,928.29 $ 7,504.00 | 52.26% | $5,265.10 $ 7,981.00 | 51.58% |
Appendix D
Stevens Point Municipal Water Utility - Step II
Customer Water Bill Comparison at Present and Authorized Rates
Quarterly Including
| Customer Type | Meter Size | Volume (100 Cubic Feet) | Quarterly Bills at Bills at Step I Step II Rates Rates | Percent Change | Public Fire Protection Bills at Bills at Step I Step II Rates Rates | Percent Change |
|---|---|---|---|---|---|---|
| Small Residential | 3/4" | 8 | $55.96 $ 56.76 | 1.43% | $75.01 $ 76.05 | 1.39% |
| Average Residential | 3/4" | 15 | $70.80 $ 72.30 | 2.12% | $89.85 $ 91.59 | 1.94% |
| Large Residential | 3/4" | 30 | $102.60 $ 105.60 | 2.92% | $121.65 $ 124.89 | 2.66% |
| Large Residential | 3/4" | 40 | $123.80 $ 127.80 | 3.23% | $142.85 $ 147.09 | 2.97% |
| Large Residential | 3/4" | 60 | $166.20 $ 172.20 | 3.61% | $185.25 $ 191.49 | 3.37% |
| Multifamily Residential | 2" | 550 | $1,340.00 $ 1,378.50 | 2.87% | $1,490.00 $ 1,534.50 | 2.99% |
| Multifamily Residential | 2" | 1,500 | $3,411.00 $ 3,516.00 | 3.08% | $3,561.00 $ 3,672.00 | 3.12% |
| Multifamily Residential | 3" | 750 | $1,857.00 $ 1,909.50 | 2.83% | $2,148.00 $ 2,200.50 | 2.44% |
| Multifamily Residential | 4" | 3,600 | $8,172.00 $ 8,424.00 | 3.08% | $8,649.00 $ 8,904.00 | 2.95% |
| Commercial | 2" | 2,350 | $4,826.00 $ 4,951.50 | 2.60% | $4,976.00 $ 5,107.50 | 2.64% |
| Commercial | 3" | 3,100 | $6,212.00 $ 6,375.00 | 2.62% | $6,503.00 $ 6,666.00 | 2.51% |
| Commercial | 4" | 3,600 | $7,164.00 $ 7,352.00 | 2.62% | $7,641.00 $ 7,832.00 | 2.50% |
| Commercial | 6" | 8,500 | $15,716.00 $ 16,149.00 | 2.76% | $16,667.00 $ 17,100.00 | 2.60% |
| Industrial | 2" | 800 | $1,841.00 $ 1,889.00 | 2.61% | $1,991.00 $ 2,045.00 | 2.71% |
| Industrial | 4" | 4,000 | $7,844.00 $ 8,052.00 | 2.65% | $8,321.00 $ 8,532.00 | 2.54% |
| Industrial | 4" | 6,000 | $11,244.00 $ 11,552.00 | 2.74% | $11,721.00 $ 12,032.00 | 2.65% |
| Industrial | 10" | 330,000 | $434,869.00 $ 451,377.00 | 3.80% | $437,155.00 $ 453,663.00 | 3.78% |
| Public Authority | 3" | 5,400 | $10,122.00 $ 10,400.00 | 2.75% | $10,413.00 $ 10,691.00 | 2.67% |
| Public Authority | 4" | 1,000 | $2,444.00 $ 2,502.00 | 2.37% | $2,921.00 $ 2,982.00 | 2.09% |
| Public Authority | 4" | 1,300 | $3,014.00 $ 3,087.00 | 2.42% | $3,491.00 $ 3,567.00 | 2.18% |
| Public Authority | 4" | 3,800 | $7,504.00 $ 7,702.00 | 2.64% | $7,981.00 $ 8,182.00 | 2.52% |
Appendix D
Stevens Point Municipal Water Utility - Step II
Customer Water Bill Comparison at Present and Authorized Rates
Quarterly Including
| Customer Type | Meter Size | Volume (100 Cubic Feet) | Quarterly Bills at Bills at Current Step II Rates Rates | Percent Change | Public Fire Protection Bills at Bills at Current Step II Rates Rates | Percent Change |
|---|---|---|---|---|---|---|
| Small Residential | 3/4" | 8 | $41.18 $ 56.76 | 37.83% | $54.71 $ 76.05 | 39.01% |
| Average Residential | 3/4" | 15 | $51.26 $ 72.30 | 41.05% | $64.79 $ 91.59 | 41.36% |
| Large Residential | 3/4" | 30 | $72.86 $ 105.60 | 44.94% | $86.39 $ 124.89 | 44.57% |
| Large Residential | 3/4" | 40 | $87.26 $ 127.80 | 46.46% | $100.79 $ 147.09 | 45.94% |
| Large Residential | 3/4" | 60 | $116.06 $ 172.20 | 48.37% | $129.59 $ 191.49 | 47.77% |
| Multifamily Residential | 2" | 550 | $924.56 $ 1,378.50 | 49.10% | $1,032.71 $ 1,534.50 | 48.59% |
| Multifamily Residential | 2" | 1,500 | $2,340.06 $ 3,516.00 | 50.25% | $2,448.21 $ 3,672.00 | 49.99% |
| Multifamily Residential | 3" | 750 | $1,284.36 $ 1,909.50 | 48.67% | $1,485.21 $ 2,200.50 | 48.16% |
| Multifamily Residential | 4" | 3,600 | $5,614.29 $ 8,424.00 | 50.05% | $5,951.10 $ 8,904.00 | 49.62% |
| Commercial | 2" | 2,350 | $3,315.56 $ 4,951.50 | 49.34% | $3,423.71 $ 5,107.50 | 49.18% |
| Commercial | 3" | 3,100 | $4,158.86 $ 6,375.00 | 53.29% | $4,359.71 $ 6,666.00 | 52.90% |
| Commercial | 4" | 3,600 | $4,732.29 $ 7,352.00 | 55.36% | $5,069.10 $ 7,832.00 | 54.50% |
| Commercial | 6" | 8,500 | $9,722.78 $ 16,149.00 | 66.09% | $10,399.49 $ 17,100.00 | 64.43% |
| Industrial | 2" | 800 | $1,282.06 $ 1,889.00 | 47.34% | $1,390.21 $ 2,045.00 | 47.10% |
| Industrial | 4" | 4,000 | $5,124.29 $ 8,052.00 | 57.13% | $5,461.10 $ 8,532.00 | 56.23% |
| Industrial | 4" | 6,000 | $7,084.29 $ 11,552.00 | 63.07% | $7,421.10 $ 12,032.00 | 62.13% |
| Industrial | 10" | 330,000 | $283,733.53 $ 451,377.00 | 59.08% | $285,355.78 $ 453,663.00 | 58.98% |
| Public Authority | 3" | 5,400 | $6,412.86 $ 10,400.00 | 62.17% | $6,613.71 $ 10,691.00 | 61.65% |
| Public Authority | 4" | 1,000 | $1,719.29 $ 2,502.00 | 45.53% | $2,056.10 $ 2,982.00 | 45.03% |
| Public Authority | 4" | 1,300 | $2,106.29 $ 3,087.00 | 46.56% | $2,443.10 $ 3,567.00 | 46.00% |
| Public Authority | 4" | 3,800 | $4,928.29 $ 7,702.00 | 56.28% | $5,265.10 $ 8,182.00 | 55.40% |
Appendix E
Stevens Point Municipal Water Utility - Step II
Schedule of Water Depreciation Rates
Effective January 1, 2026
| Account Number | Account Title SOURCE OF SUPPLY PLANT | Depreciation Rate |
|---|---|---|
| 314 | Wells and Springs | 2.90% |
| 316 | Supply Mains | 1.80% |
| PUMPING PLANT | ||
| 321 | Structures and Improvements | 3.20% |
| 325 | Electric Pumping Equipment | 4.40% |
| 328 | Other Pumping Equipment | 4.40% |
| WATER TREATMENT PLANT | ||
| 331 | Structures and Improvements | 3.20% |
| 332 | Sand or Other Media Filtration Equipment | 3.30% |
| 334 | Other Water Treatement Equipment | 6.00% |
| TRANSMISSION AND DISTRIBUTION PLANT | ||
| 342 | Distribution Reservoirs and Standpipes | 1.90% |
| 343 | Transmission and Distribution Mains | 1.30% |
| 345 | Services | 2.90% |
| 346 | Meters | 5.50% |
| 348 | Hydrants | 2.20% |
| 349 | Other Transmission and Distribution Plant | 5.00% |
| GENERAL PLANT | ||
| 390 | Structures and Improvements | 2.90% |
| 391 | Office Furniture and Equipment | 5.80% |
| 391.1 | Computer Equipment | 26.70% |
| 392 | Transportation Equipment | 13.30% |
| 393 | Stores Equipment | 5.80% |
| 394 | Tools, Shop and Garage Equipment | 5.80% |
| 395 | Laboratory Equipment | 5.80% |
| 396 | Power Operated Equipment | 7.50% |
| 397 | Communication Equipment | 15.00% |
| 397.1 | SCADA Equipment | 9.20% |