Water rate study, test year 2026: the City's application

Publisher
Stevens Point Municipal Water Utility
Date
Feb. 23, 2026
Saved
Nov. 26, 2026, 51 pages

Saved text

Set for reading from the publisher’s PDF, with its page numbers. Headings and tables are rebuilt from the text, so check the original for exact layout.

p. 1PSC REF#:580721

Public Service Commission of Wisconsin

City of Stevens Point Department of Public
Utilities and Transportation – Water Utility

RECEIVED: 2/23/2026 12:18:40 PM
Forecasted Water Revenue Requirement

Test Year 2026

Prepared as of February 23, 2026

p. 2

Table of Contents
Test Year 2026

Page

Accountants' Compilation Report1
Summary of Significant Accounting Policies and Significant Assumptions2
Application to Increase Rates5
Ratemaking Goals6
Telephonic Hearing Information7
Attachments
1 Listing of Largest Customers Billed8
2A Volume Sales10
2B Service Charges11
2C Sales Forecast Historical12
3A Volume Sales13
3B Water Utility Consumer Analysis14
4 Public Fire Protection Revenue (Summary)15
5 Public Fire Protection Revenue (Supporting Detail)16
6 Private Fire Protection Revenue18
7 Operating Revenues19
8 Taxes (Account 408)20
9 Property Tax Equivalent Computation21
10 Operating Expenses22
11 Utility Plant in Service24
11a Contributed Plant26
12 Depreciation Accrual and Expenses28
13 Accumulated Depreciation, Materials and Supplies
and Regulatory Liability and Other Adjustments30
14 Estimated Rate Base and Increase Requested31
14a Cash Flow - Forecasted 202632
14b Debt Coverage - Forecasted 202633
15 Financing and Debt Summary34
16 Impact Fees35
17 Miscellaneous36
18 Water Conservation Spending39
19 Additional Notes40
19a Required Supplemental Information41
19b Credit Card Fees43
p. 3

Table of Contents
Test Year 2026

Page

20Step II Major Plant Detail45
21Step II Summary46
22Step II Notes47
p. 4

Accountants' Compilation Report

To the Utility Commission of Stevens Point Water, Wastewater and Stormwater Departments

Management is responsible for the accompanying forecasted Attachments 1 through 22 (Attachments) as identified in the table of contents of the Stevens Point Municipal Water Utility (Utility), an enterprise fund of the City of Stevens Point, Wisconsin (the City) for the years ending December 31, 2025 and 2026, including the related summaries of significant assumptions and accounting policies in accordance with guidelines for the presentation of a forecast established by the American Institute of Certified Public Accountants (AICPA). We have performed a compilation engagement in accordance with Statements on Standards for Accounting and Review Services promulgated by the Accounting and Review Services Committee of the AICPA. We did not examine or review the forecasted Attachments nor were we required to perform any procedures to verify the accuracy or completeness of the information provided by management. Accordingly, we do not express an opinion, a conclusion, nor provide any form of assurance on this forecasted Attachments.

There will usually be differences between the forecasted and actual results because events and circumstances frequently do not occur as expected, and those differences may be material. We have no responsibility to update this report for events and circumstances occurring after the date of this report.

The accompanying supplementary information, identified as historical financial information for the years ended December 31, 2022 through 2024 and nonfinancial information, contained in the Attachments is presented for purposes of additional analysis and is not a required part of the forecast. Such information is the responsibility of management. The supplementary information was subject to our compilation engagement. We have not examined or reviewed the supplementary information and do not express an opinion, a conclusion nor provide any assurance on such information.

Madison, Wisconsin
February 23, 2026

Baker Tilly Advisory Group, LP and Baker Tilly US, LLP, trading as Baker Tilly, are members of the global network of Baker Tilly International Ltd., the members of which are separate and independent legal entities. Baker Tilly US, LLP is a licensed CPA firm that provides assurance services to its clients. Baker Tilly Advisory Group, LP and its subsidiary entities provide tax and consulting services to their clients and are not licensed CPA firms.

p. 5

Summary of Significant Accounting Policies and Significant Assumptions
Test Year 2026

Nature of Forecast

This financial forecast presents, to the best of management's knowledge and belief, the Utility's expected results of operations for the forecast period. Accordingly, the forecast reflects its judgment as of February 23, 2026, the date of this forecast, of the expected conditions and its expected course of action. The assumptions disclosed herein are those that management believes are significant to the forecast. There will usually be differences between the forecasted and actual results because events and circumstances frequently do not occur as expected, and those differences may be material.

Nature of Operations

The Utility is an enterprise fund of the City of Stevens Point. The Utility is managed by the Utility Commission. The Utility is subject to regulation by the Public Service Commission of Wisconsin (PSCW) in matters of rates, financial reporting and other procedures.

Revenue Recognition

Water revenues are recorded for service rendered based on water meter readings, with billings made to customers quarterly. The Utility does not accrue beyond billing dates.

Expenses

Historical operation and maintenance expenses are reported on the accrual basis. Forecasted 2025 and 2026 expenses are also generally reported on the accrual basis with the exception of certain nonrecurring major expenses which are normalized for rate-making purposes. This accounting for nonrecurring expenses differs from generally accepted accounting principles. Expenses related to pensions are based on cash contributions, rather than Governmental Accounting Standards Board Statement No. 68 expenses, as required by the PSCW.

Plant

Additions to and replacements of Utility plant are recorded at original cost, which includes material, labor and overhead. The cost of renewals and betterments relating to retirement units is added to plant accounts. The cost of property replaced, retired or otherwise disposed of, is deducted from plant accounts and, generally, together with removal costs less salvage, is charged to accumulated depreciation.

Depreciation

Depreciation is computed using straight-line rates authorized by the PSCW applied to the average plant investment balances for the calendar year.

Accumulated Depreciation

Salvage and cost of removal are projected based on historical trends and estimates from Utility management. A summary of forecasted salvage and cost of removal is shown on Attachment 13.

Depreciation expense charged to sewer is determined based on 1/2 of meters depreciation computed on Attachment 12.

Materials and Supplies

Materials and supplies are generally used for construction and for operation and maintenance work - not for resale. They are valued at lower of cost or market based on average prices and charged to construction or operation and maintenance expense when used.

p. 6

Summary of Significant Accounting Policies and Significant Assumptions
Test Year 2026

Contributions in Aid of Construction

Contributions in aid of construction represent contributions received from customers for construction of plant. These amounts are not subject to repayment. Contributions are based on historical trends and estimates provided by Utility management on Attachment 11a.

Increased depreciation expense resulting from contributed plant cannot be recovered through user fees due to changes in the accounting and ratemaking treatment of contributions in aid of construction approved by the PSCW as of January 1, 2003. To ensure rates are adequate to meet debt coverage, an analysis of the 2026 estimated coverage is provided on Attachment 14b.

Taxes

Taxes included in the forecast include the PSCW remainder assessment and social security taxes. Municipal utilities are exempt from income taxes and therefore no income tax liability is recorded by the Utility.

Property tax equivalent for 2025 is based on the actual 2025 mill rates and the 2024 assessment ratio. Property tax equivalent for 2026 is based on the actual 2025 mill rates inflated by the PSCW Inflationary rate and the assessment ratio was kept consistent. Social security expenses and PSCW remainder assessment tax in 2025 and 2026 are increased by PSCW inflationary rate.

Financing

Forecasted debt issues were determined by management and management's registered municipal advisor.

Operating Revenues

The following assumptions are based on discussions with Utility management, analysis of historical data for 2022 through 2024 and expected changes for 2025 and 2026.

Metered Sales

Forecasted metered sales are based on average consumption per customer times the number of customers. The number of customers is forecasted based on current levels and analysis of prior years. Total consumption is based on an analysis of the most recent historical consumption. Please refer to Attachments 3A and 3B for a summary of forecasted volume and customer changes.

Public Fire Protection

Public fire protection is forecasted based on the number of customers forecasted on Attachment 3B. The public fire protection computation is shown on Attachment 5.

Private Fire Protection

Private fire protection was forecasted based on actual 2025 connections. The calculation is shown on Attachment 6.

Other Water Revenues

Refer to Attachment 7 for expected changes in other water revenues.

p. 7

Summary of Significant Accounting Policies and Significant Assumptions
Test Year 2026

Operating Expenses

Operation and maintenance expenses are forecasted based on the following:

  1. 1.Actual costs incurred from January 1, 2025 through August 31, 2025.
  2. 2.Historical trends from 2022-2024.
  3. 3.Specific knowledge of expenses the Utility will incur as outlined on Attachment 19.
  4. 4.Significant nonroutine maintenance and other costs are normalized for rate making purposes.
p. 8

Application to Increase Rates
Public Service Commission of Wisconsin
Division of Water Utility Regulation and Analysis
Hill Farms State Office Building - 6th Floor
4822 Madison Yards Way
3024 (1-1-2014)
(Filling this form out is in accordance with Wis. Stat. § 196.25)

The Public Service Commission of Wisconsin does not discriminate on the basis of disability in the provision of programs, services, or employment. If you are speech, hearing, or visually impaired and need assistance, call (608) 266-5481 or TTY (608)267-1479. We will try to find another way to get the information to you in a usable form.

Name of Utility:
Stevens Point Municipal Water Utility
Type of rate increase requested:

WaterSewerBoth
Contact Personnel Information
UtilityConsultant
NameStevens Point Municipal Water UtilityBaker Tilly US
Contact Person (1)Mr. Joel LemkeJodi Dobson
Contact Person (2)Nina Crane
300 Bliss Ave, P.O. Box 2424807 Innovate Ln, PO Box 7398
Street or P.O. Box
City and Zip CodeStevens Point, WI 54881-0242Madison, WI 53707-7998
County or CountiesPortage County
Telephone Number (1)608-240-2469
Telephone Number (2)312-228-7248
E-Mail Addressjlemke@stevenspoint.comnina.crane@bakertilly.com
Fax Number
Best Hours between 7:30 am & 5:00 pm8:00 AM - 4:00 PM8:00 AM - 4:00 PM
Days AvailableM, T, W, TH, FM, T, W, TH, F
p. 9

2026 Test Year
Ratemaking Goals

Reason for Rate increase:Please select the reasons for requesting a rate increase from the drop down and provide additional
Recent Constructioninformation such as project information, debt service schedules, and other relevant information
Debt Service Coveragesupporting the request for a rate increase:
Increasing O&M Costs
OtherIn addition to our 1% reconstruction goal every year, we have several years of Business 51 reconstruction ahead,

which will create more strain on rates. Additionally, we have a new pressure zone that needs to be constructed, which involves a new water tower, and well 12 will also need to be completed. O&M continues to rise as well. The bigger projects will require debt to be issued.

Goals for Rate Proceeding:Please describe any goals the utility would like to see addressed as part of this rate proceeding.
AffordabilityOur goals are to maintain as affordable of rates as possible while addressing older infrastructure at a respondible
Conservationrate, hopefully 1% or so. Additionally we need to get through several big CIP years related to business 51
Particular Customer Class (provide detail)reconstruction and a second pressure zone. Our rate class structure is working well for us but we do worry about the
Change to block rate structurepaper mill's future. That mill closure would be devistating to our revenue.

Change to PFP
Other

Required Approvals: Please describe what governing body the utility must recieve approval from in order to request

this rate proceeding. Has the utility recieved such approval? Please provide documentation to demonstrate the approvals and any specific changes approved (amount of increase, PFP change, specific ROR, etc.)

The utility has received permission from the Stevens Point Public Utility Commission followed by approval from the Common Council in April of 2025. Minues available here: https://stevenspointwi.portal.civicclerk.com/event/2051/files/agenda/4195

Public Involvement: Please describe the measures taken to date to inform customers of the rate increase you are

applying for. Please detail how the utility informed them, if the utility provided an estimated rate increase and any other information the utility has provided to the customer regarding the need for a rate increase.

The public notice has been made by way of our agenda and minutes to this point. We have not anticipated the rate increase amount yet with the customer base.

Affordability: Does the utility anticipate there will be customers with affordability concerns as a result of the rate increase?

If yes, please describe any conversations the utility may have had with customers and/or local decision makers about this issue.

We have a small percentage of water customers who struggle with bills, but there has not been formal discussion about an affordability program in the water utility yet.

Has the utility considered requesting reductions to its PILOT payment, shifting a portion of PFP to municipal charge, or altering its rate structure to try to address affordability.

Many years ago we were able to get our PILOT capped at 870K so that we were not subject to an ever-increaseing pilot. We have hit that cap occasionally during big CIP years.

If the utility checkedPlease explain in more detail the concerns the utility has about affordability, and the affordability goals it would
"Affordability" inlike to achieve. Has the utility had any conversations with Residential customers, businesses, or local decision
Question 2 above.makers about the affordability issue? Would the utility consider any changes to the rate design that might be
Please answer therelevant to affordability concerns, such as establishing class-based rates, adjusting the rate block sizes, or
following questions.adding uniform or inclining block rates for Residential customers?

We would consider a rate strucre to account for affordability. Most of our conversations have been in the sewer utility. We recently created a fee that covers the replacement of sewer laterals in the right-of-way because it was the largest most unexpected costs that customers would have to cover. That program is going very well.

p. 102026 Test Year Hearing Location Questionnaire

Requests to adjust rates require Commission approval. Pursuant to state statutes, a rate increase can only be authorized after a public hearing. A hearing may be conducted in one of the ways indicated below:

For options one and two, all utility representatives who plan to participate at the hearing must have adequate audio and visual connections to Zoom.

For option two, any utility hosted hearing location must meet the following requirements:

  1. 1.Sufficiently sized to accommodate the number of expected persons.
  2. 2.Accessible to persons with a disability; and
  3. 3.Configured so that all hearing location attendees can adequately see and hear the participants connected by Zoom and vice versa.

For option three utility representatives must travel to Madison to participate at the Commission’s office.

The Zoom connection will be livestreamed and retained on the Commission’s hearings YouTube channel; https://www.youtube.com/@PSCWI-Hearings.

More details will be provided concerning the scheduling and administrating the hearing when Commission staff has completed processing your application to adjust rates.

Please check the hearing option requested:

Over Zoom with no physical location.

Over Zoom and at a location hosted by the utility. Location must meet the requirements.

Building Name: Utility Office

Room No. or Name: Conference Room

Address: 300 Bliss Avenue, Stevens Point

Phone No. 715-345-5260

Over Zoom and at the Commission’s office in Madison. Utility must travel to Madison.

p. 11

ATTACHMENTS

p. 12PART 1: ATTACHMENT 1 Provide consumption data for the four largest customers in each customer class.

  1. 1.List the billing units consistent with Schedule Mg-1 in your tariff sheets.

100 Cubic Feet (CCF)

  1. 2.During the last 12-month period, list the highest consumption billed for each of the four largest customers in each class. Please select four different customers in each class and not multiple bills from the same customer. A customer may be listed more than once only if they are served by more than one meter and the meter sizes are different.
  2. 3.List the meter size, billing date, and the billed consumption.
  • –For privacy reasons, do not list any customer names.

LISTING OF LARGEST CUSTOMERS BILLED

MeterBillingBilled SpecifyNo. of Month(s)
Customer NameClass
SizeDateConsumption Unitsof Consumption
Residential 1Res.3/4"3/21/2025609 CCF3 months
Residential 2Res.3/4"9/23/2024367 CCF3 months
Residential 3Res.3/4"9/23/2024341 CCF3 months
Residential 4Res.3/4"9/23/2024293 CCF3 months
Multifamily Residential 1MF4"2/24/20253,679 CCF1 month
Multifamily Residential 2MF2"3/21/20251,528 CCF3 months
Multifamily Residential 3MF3"2/21/2025754 CCF3 months
Multifamily Residential 4MF2"4/22/2025564 CCF3 months
Commercial 1Com.6"9/23/20248,534 CCF3 months
Commercial 2Com.4"9/23/20243,621 CCF3 months
Commercial 3Com.3"9/23/20243,118 CCF3 months
Commercial 4Com.2"3/21/20252,352 CCF3 months
Industrial 1Ind.10"9/23/2024328,005 CCF3 months
Industrial 2Ind.4"9/23/20244,728 CCF3 months
Industrial 3Ind.4"9/23/20244,151 CCF3 months
Industrial 4Ind.2"9/23/2024811 CCF3 months
Public Authority 1P.A.3"9/23/20245,419 CCF3 months
Public Authority 2P.A.4"9/23/20243,832 CCF3 months
Public Authority 3P.A.4"9/23/20241,282 CCF3 months
Public Authority 4P.A.4"9/23/20241,050 CCF3 months
Irrigation 1Irr.
Irrigation 2Irr.
Irrigation 3Irr.
Irrigation 4Irr.
p. 13

PART 2:
Please answer each question about billing procedures.

  1. 1.How do you send your water bills?

Envelopes

  1. 2.What is your current billing frequency for residential customers?

Quarterly

2a. Would you prefer to change the current billing frequency?

2b. If so, which billing frequency would be preferred?
Quarterly

  1. 3.How frequently do you read residential customer meters?

Quarterly

  1. 4.Which of the following best describes the manner in which you read meters each billing period? Meters are read in cycle (one-third of customers are read each month).

Please explain if meters read in cycles:

We have 3 billing sections. Each section receives a quarterly billing. We process a different sections quarterly billing each month.

  1. 5.What is the estimated start date for reading

1st of the month
meters for your next billing period?

p. 142026 Test Year ATTACHMENT 2A

VOLUME SALES

  1. 1.Provide the authorized rates for volume consistent with Schedule Mg-1.
  2. 2.Complete Attachment 2A using actual data from the latest 12 months for each customer class.
  3. 3.Provide the actual total volume for the most recent 12 months for each class.

August 31, 2025

Billing Periods per Year: 4 Actual Latest 12 Months Ending:

Yes

Does the utility have class-based volume rates?

Class-based rates are separate rate schedules for residential, multifamily, nonresidential (commercial, industrial, public authority) or irrigation classes If the Utility had a rate change within the past year, be sure to use prorated rates. See instructions for more detail.

Which rate schedules do you have?

Volume BlockNonresidential ResidentialNoMultifamily Irrigation
Residential$1.44
Multi- Family$1.49
First10,000$1.55
Next90,000$1.46
Next150,000$1.29
Next750,000$0.98
Over1,000,000$0.85
First-
Next-
Next-
Next-
Over-
MultifamilyPublic
ResidentialResidentialCommercialIndustrialAuthorityIrrigation
UnitsUnitsUnitsUnitsUnitsUnitsTotal
Residential480,97900000480,979
Multi- Family080,345000080,345
First 10,00000145,5636,79927,1520179,514
Next 90,00000196,56432,66869,5890298,821
Next 150,0000039,86037,2079,198086,265
Next 750,0000025,558130,7245,1030161,385
Over 1,000,0000001,269,389001,269,389
0000000
0000000
0000000
Total Units480,97980,345407,5451,476,787111,04202,556,698
Unit Revenues$692,610$119,714$589,072$1,313,321$160,552$-$2,875,269
p. 15

ATTACHMENT 2B

2026 Test Year SERVICE CHARGES

  1. 1.Provide the authorized meter charges consistent with Schedule Mg-1.
  2. 2.Complete Attachment 2B using actual data from the latest 12 months for each customer class.
  3. 3.Provide actual total billed revenues for the same 12 months. If variance between total revenues and actual billed revenue is greater than 3 percent for any customer class, the variance must be explained with a reason and any corrective plan to address the variance in the Notes.
  4. 4.Include Am-1 revenue(s) from additional rates on Attachment 7 - Account 474 (Other Water Revenues), not on Attachment 2B.
Billing Periods per Year:4Actual Latest 12 Months Ending:August 31, 2025
MultifamilyPublic
ResidentialResidentialCommercialIndustrial AuthorityIrrigation

Average No. of Average No. of Average No. of Average No. of Average No. of Average No. of

Meter Size ChargeMetersMetersMetersMeters MetersMetersTotals
5/8" $29.666,444342551506,892
3/4" $29.661,428816911101,617
1" $43.261511133345300633
1 1/4" $58.710000000
1 1/2" $71.070080109
2" $105.063411663500263
2 1/2" $0.000000000
3" $166.860135134071
4" $250.290416713040
6" $438.780011002
8" $679.800001001
10" $979.530001001
12" $1,276.170000000
Total Meters8,0261701,1542515409,529
Fixed Revenues$961,324$42,760$241,436$18,906$65,280$-1,329,706
Total Volume Revenue$692,609.76$119,714.05$589,072.33$1,313,320.93$160,551.90$-$2,875,269
Surcharges, etc.$0$0$0$0$0$0$0
Total Revenues Per Analysis$1,653,934$162,475$830,508$1,332,227$225,832$0$4,204,975
Total Actual Billed Revenues$1,630,062$159,574$816,608$1,332,225$225,568$0$4,164,037
Dollar Variance$23,872$2,901$13,900$2$264$0$40,938
Percent Variance1.44%1.79%1.67%0.00%0.12%0.00%0.97%
  1. (A)The annual revenues from meter charges are based upon the number of bills issued annually.
p. 16
2026 Test YearSales Forecast HistoricalAttachment 2C
YearAvg. # CustomersResidential Usage (Ccf's)Avg/Cust/Qtr (Ccf's)Change in Customer CtYearAvg. # CustomersCommercial Usage (Ccf's)Avg/Cust/Qtr (Ccf's)Change in Customer Ct
20217,808511,43716.38020211,094405,52792.670
20227,834484,08815.452620221,075393,41491.49-19
20237,880578,32118.354620231,120509,602113.7545
20247,896460,77314.591620241,116390,94787.58-4
20258,026480,97914.9813020251,154407,54588.2938
20268,080484,21514.985420261,154407,54588.290
Averages:Averages:
5-year avg7,889503,12015.940.005-year avg1,112421,40794.760.00
4-year avg7,909501,04015.8454.504-year avg1,116425,37795.2715.00
3-year avg7,934506,69115.9764.003-year avg1,130436,03196.4726.33
2-year avg7,961470,87614.7973.002-year avg1,135399,24687.9417.00
20258,026480,97914.98130.0020251,154407,54588.2938.00
Multifamily ResidentialPublic Authority
Avg. #UsageAvg/Cust/QtrChange inAvg. #UsageAvg/Cust/QtrChange in
YearCustomers(Ccf's)(Ccf's)Customer CtYearCustomers(Ccf's)(Ccf's)Customer Ct
202115973,705115.8902021167121,448181.810
202215865,951104.35-12022165119,813181.53-2
202316571,667108.5972023166141,631213.301
202416568,963104.4902024167113,802170.361
202517080,345118.1552025154111,042180.26-13
202617381,763118.1532026154111,042180.260
Averages:Averages:
5-year avg16372,126110.350.005-year avg164121,547185.510.00
4-year avg16571,731109.012.754-year avg163121,572186.46-3.25
3-year avg16773,658110.494.003-year avg162122,158188.13-3.67
2-year avg16874,654111.422.502-year avg161112,422175.11-6.00
202517080,345118.155.002025154111,042180.26-13.00
IrrigationIndustrial
Avg. #UsageAvg/Cust/QtrChange inAvg. #UsageAvg/Cust/QtrChange in
YearCustomers(Ccf's)(Ccf's)Customer CtYearCustomers(Ccf's)(Ccf's)Customer Ct
2021000.0002021261,394,39313407.630
2022000.0002022261,871,51717995.360
2023000.0002023311,734,46013987.585
2024000.0002024291,568,81013524.23-2
2025000.0002025251,476,78714767.87-4
2026000.0002026251,476,78714767.870
Averages:Averages:
5-year avg00#DIV/0!0.005-year avg271,609,19314682.420.00
4-year avg00#DIV/0!0.004-year avg281,662,89414981.02-0.25
3-year avg00#DIV/0!0.003-year avg281,593,35214058.99-0.33
2-year avg00#DIV/0!0.002-year avg271,522,79914099.99-3.00
202500#DIV/0!0.002025251,476,78714767.87-4.00
p. 17

VOLUME SALES

ATTACHMENT 3A

2026 Test Year Estimates for Test Year

  1. 1.Provide the meter charges for the estimated test year.
  2. 2.Use the Utility's most current rates.
  3. 3.Provide complete details in Notes section concerning the gain or loss of any large customer, 20 percent change in usage from a customer class, or customers being reclassified to a different customer class.
  4. 4.If necessary, please describe any unusual situations in the Notes section.

Billing Periods per Year: 4

Yes

Does the utility have class-based volume rates?

Which rate schedules do you have?

Note: Only change these rates if there has been an SRC or adjustment for purchased water in the last 12 months

NonresidentialNoMultifamily0
Irrigation0
Volume BlockRate
Residential All water used$1.44
Multi- Family All water used$1.49
First 10,000$1.55
Next 90,000$1.46
Next 150,000$1.29
Next 750,000$0.98
Over 1,000,000$0.85
First -$0.00
Next -$0.00
First -$0.00
Next -$0.00
Next -$0.00
MultifamilyPublic
ResidentialResidentialCommercialIndustrialAuthorityIrrigation
UnitsUnitsUnitsUnitsUnitsUnitsTotal
Residential 484,21500000484,215
Multi- Family 081,763000081,763
First 10,000 00145,5636,79927,1520179,514
Next 90,000 00196,56432,66869,5890298,821
Next 150,000 0039,86037,2079,198086,265
Next 750,000 0025,558130,7245,1030161,385
Over 1,000,000 0001,269,389001,269,389
0000000
0000000
First 10,000 0000000
Next 90,000 0000000
Total Units 484,21581,763407,5451,476,787111,04202,561,352
Unit Revenues $697,270$121,827$589,072$1,313,321$160,552$-$2,882,042
p. 18

WATER UTILITY CONSUMER ANALYSIS

ATTACHMENT 3B

2026 Test Year Estimates for Test Year

  1. 1.Provide the meter charges for the estimated test year.
  2. 2.Use the Utility's most current rates.
  3. 3.Provide complete details in Notes section concerning the gain or loss of any large customer, 10 percent change in customer count for a customer class, or customers being reclassified to a different customer class
Billing Periods per Year:4
MultifamilyPublic
ResidentialResidentialCommercialIndustrialAuthorityIrrigation

Average No. of Average No. of Average No. of Average No. of Average No. of Average No. of

Meter Size ChargeMetersMetersMetersMeters MetersMetersTotals
5/8" $29.666,487342551506,935
3/4" $29.661,438816911101,627
1" $43.261521153345300636
1 1/4" $58.710000000
1 1/2" $71.070080109
2" $105.063421663500264
2 1/2" $0.000000000
3" $166.860135134071
4" $250.290416713040
6" $438.780011002
8" $679.800001001
10" $979.530001001
12" $1,276.170000000
Total Meters8,0801731,1542515409,586
Fixed Revenues$967,792$43,515$241,436$18,906$65,280$-$1,336,928.43
Total Volume Revenue$697,270$121,827$589,072$1,313,321$160,552$-$2,882,042
Surcharges, etc.$0$0$0$0$0$0$0
Total Estimated Revenues$1,665,061$165,342$830,508$1,332,227$225,832$0$4,218,970

Estimated Customer Growth for the Test Year:

Number of Meter
Customer Class Customers Sizes

Residential Multifamily54 4, 5/8 & 1 3 1 &2
Commercial0
Industrial0
Public Auth.0
Irrigation0
Total57
p. 19

PUBLIC FIRE PROTECTION REVENUE (SUMMARY)
Estimated for Test Year 2026

2026 Test Year ATTACHMENT 4

  1. 1.This schedule is a summary of various methods of charging for Public Fire

Protection and must be consistent with the Utility's current F-1 or Fd-1 tariff.

  1. 2.For a Municipal Charge based upon mains and/or hydrants or Direct Charges to Customers based upon equivalent meters or services, test year estimate is derived from Attachment 5.
  2. 3.For all other charges, insert the test year estimate in the amount column.
  3. 4.For Direct Charges to Customers based upon a method other than equivalent meters or services, detail must be submitted to the PSC supporting this metod.

MUNICIPAL CHARGE
Based upon Mains and Hydrants:

$0

Estimated Test Year Revenue (Per Attachment 5)

MUNICIPAL CHARGE
Based upon a Flat Charge to Municipality:

$0

Estimated Test Year Revenue

DIRECT CHARGE TO CUSTOMERS
Based upon Equivalent Meters or Equivalent Services:

$793,668

Estimated Test Year Revenue (Per Attachment 5)

DIRECT CHARGE TO CUSTOMERS

Based upon a Direct Charge Method other than in number 3 above:

$0

Estimated Test Year Revenue
Note: Detail Must be Submitted to PSC Supporting this Method.

CHARGES TO WHOLESALE CUSTOMERS

$0

Estimated Test Year Revenue (Per attachment 3A)

OTHER PUBLIC FIRE PROTECTION CHARGES TO CUSTOMERS FOR FIRE PROTECTION

Based upon Charges for Water Used for Fire Protection (i.e., using Tariff
Schedules F-2 or BW-1)

Estimated Test Year Revenue$0
TOTAL ESTIMATED TEST YEAR PUBLIC FIRE PROTECTION REVENUE$793,668
TOTAL ESTIMATED TEST YEAR WHOLESALE FIRE PROTECTION REVENUE$0
p. 20

PUBLIC FIRE PROTECTION REVENUE (SUPPORTING DETAIL)
Estimated for Test Year 2026

2026 Test Year ATTACHMENT 5

  1. 1.For a Municipal Charge based upon mains and/or hydrants, complete the Municipal Charge section.
  2. i.Base units and charges are obtained from the current tariff sheet, typically Schedule F-1.
  3. ii.Net additions for mains and hydrants units are derived from Attachment 17, Part One.

Municipal Charge

If Public Fire Protection Revenue is a Municipal Charge based upon mains and/or hydrants, complete the following.

$0

Base annual charge (dollars)
Base estimated transmission and distribution main (number of feet)
Main size larger than (typically 4 or 6 inches)
Charge per foot of main over base (dollars)
Base number of hydrants
Charge per hydrant over base (dollars)

Based upon Mains and/or Hydrants:Mains Inches & LargerNumber of HydrantsDollar Amount
Base Units and Charge (Per tariff schedule)0 feet0 hyd$0
Balance - 12/31/202400
2025 NET additions8,24917
1/2 of test year 2026 NET Routine units added00
All of Test Year 2026 Major Units Added00
Test Year Average Units8,24917
Test Year Units Over Base Units8,249 feet17 hyd
times Authorized Rates per Unit (per tariff schedule)$0.00$0.00
Increase in Revenue Over Base Amount$0$0$0
Estimated Total Test Year Revenue$0
  1. 2.p. 21For Direct Charges to Customers based upon equivalent meters or equivalent services, complete Direct Charge to Customers section.
  2. i.The Authorized Rates are obtained from the current tariff sheet, typically Schedule F-1 or Fd-1

Direct Charge to Customers
Based upon Equivalent Meters or Equivalent Services:

Insert Billings per Year if Different4
AuthorizedAverage No. of Meters
Meter SizeRate(per Attachment 3)Annual Revenue
5/8"$13.536,935$375,344
3/4"$13.531,627$88,040
1"$33.99636$86,472
1 1/4"$49.440$0
1 1/2"$67.989$2,447
2"$108.15264$114,096
2 1/2"$0.000$0
3"$200.8571$57,056
4"$336.8140$53,985
6"$676.712$5,414
8"$1,081.501$4,326
10"$1,622.251$6,489
12"$2,163.000$0
SUBTOTALS9,586$793,668
Surcharges or Rounding$0
CALCULATED ANNUAL REVENUE$793,668
p. 22

PRIVATE FIRE PROTECTION REVENUE

Estimated for Test Year 2026

  1. 1.To compute the test year Private Fire Protection Revenue, complete the applicable sections.
  2. 2.The Authorized Rates are obtained from the current tariff sheet, typically Schedule Upf-1.
  3. 3.Enter the test year Average Number of Connections based on size of the connection.
Insert Billings per Year if Different4
Average Number
Fire Connections:Connectionof ConnectionsAuthorizedAnnual
SizeEach BillingAnnuallyRatesRevenue
2" or smaller28$15.00$120
3"00$24.00$0
4"34136$42.00$5,712
6"57228$84.00$19,152
8"38152$135.00$20,520
10"728$204.00$5,712
12"14$270.00$1,080
14"00$339.00$0
16"14$405.00$1,620
140560
Total Connection Revenue$53,916
Average Number
General Service Branches OffMeterof MetersAuthorizedAnnual
The Private Fire ConnectionsSizesEach BillingAnnuallyRatesAmount
5/8"00$29.66$0
3/4"00$29.66$0
1"00$43.26$0
1 1/4"00$58.71$0
1 1/2"00$71.07$0
2"00$105.06$0
2 1/2"00$0.00$0
3"00$166.86$0
4"00$250.29$0
6"00$438.78$0
8"00$679.80$0
00
Total General Branch Connection Revenues$0

If Applicable, the Authorized Credit is Usually 30% of Total General Branch Revenues.
(However, the credit may be at a different percentage or if N/A, enter zero)

Insert Authorized Credit Percentage in this box (if applicable):$0
Total Estimated Test Year Revenue (Connection Revenue less Credit Amount)$53,916
p. 23

OPERATING REVENUES
Estimated for Test Year 2026

  1. 1.Test year revenue estimated amounts are derived for the following:

Metered Sales to General Customers; Private Fire Protection; and Public Fire Protection.

  1. 2."Interim year" and other test year estimates should be based upon historical trends and other relevant information.
  2. 3.Test year revenue from additional rates or Am-1 meters should be included in Account 474 (Other Water Revenues) on this attachment, not Attachment 2B.
  3. 4.Any unusual situations that cause a variance in an account must be explained in the Notes.
AccountEstimatedTest Year
NumberDescription20222023202420252026
460Unmetered Sales to General Customers
Residential$0$0$0$0$0
Multifamily Residential00000
Commercial00000
Industrial00000
Public Authority00000
Irrigation00000
Total unmetered sales$0$0$0$0$0
461Metered Sales to General Customers
Residential$1,638,841$1,739,201$1,617,165$1,653,934$1,665,061 (A)
Multifamily Residential151,464150,990162,445162,475165,342 (A)
Commercial791,310926,902800,351830,508830,508 (A)
Industrial1,695,6771,544,9391,402,4791,332,2271,332,227 (A)
Public Authority243,181266,307226,644225,832225,832 (A)
Irrigation000-0 (A)
Total metered sales$4,520,473$4,628,339$4,209,084$4,204,975$4,218,970
462Private fire protection service$46,168$47,734$46,016$53,916$53,916 (B)
463Public fire protection service774,991775,700776,236793,668793,668 (C)
465Other water sales000-0
466Sales for resale000-0
467Interdepartmental sales000-0
Total sales of water$5,341,632$5,451,773$5,031,336$5,052,559$5,066,554
Other Operating Revenues:
470Forfeited discounts$13,445$9,608$8,036$8,309$8,550
472Rents from water property81,30485,465118,47398,805102,487
473Interdepartmental rents000-0
474Other water revenues62,17265,84569,96972,34874,446
Total other operating revenues$156,921$160,918$196,478$179,463$185,484
Total Operating Revenues$5,498,553$5,612,691$5,227,814$5,232,021$5,252,038
NOTE:(A) 2026 test year General Service Revenue estimates must come from ATTACHMENT 3.
  1. (B)2026 test year Private Fire Protection Revenue estimates must come from ATTACHMENT 6.
  2. (C)2026 test year Public Fire Protection Revenue estimates must come from ATTACHMENT 4.
p. 24

Taxes (Account 408)
Estimated for Test Year 2026

  1. 1.The test year and interim year amounts are derived for the Property Tax Equivalent Payable for the Year, and the Local and School Tax Equivalent on Meters Charged to the Sewer Department (sewer meter allocation).
  2. 2.The test year and interim year meter allocations to the sewer department are based upon 50 percent of the beginning of year meter balance (Attachment 11, Account 346), the assessment ratio (Attachment 9) and the current year net local and school mill rate (Attachment 9).
  3. i.If the meter allocation is other than 50 percent, insert the appropriate percentage in the cell formula.
  4. 3.If necessary, please describe unusual situations in the Notes.

Instructions for Taxes (Account 408)
The summary should be completed as follows:

  1. 1)For the years 2023 and 2024 the information is from the PSC Annual Reports, page W-6.
  2. 2)For Estimated 2025 and Test Year 2026, the Property Tax Equivalent must agree with the Property Tax Equivalent Computation on Attachment 9.
  3. 3)If the sewer department DOES NOT USE the meter reading of the water utility for determining
the sewer bill, then the Meter Balance allocation should not be deducted. Insert if other than 50%. ==>50
Instructions Actual Actual EstimatedTest Year
Description Reference 2023 2024 20252026
Property Tax Equivalent Payable for the
Year (from Attachment 9) 1) & 2) $838,743 $870,000 $870,000$870,000
Less: Local and school tax equivalent
on meters charged to sewer dept. 1) & 3) $29,478 $32,651 $25,289$23,163
Net Property Tax Equivalent-Water Utility $809,265 $837,349 $844,711$846,837
Social Security Taxes 1) $67,768 $85,604 $77,852$80,110
PSC Remainder Assessment Tax 1) $4,947 $4,947 $5,115$5,263
Other (specify): 1) $0 $0 $0$0
Total Taxes $881,980 $927,900 $927,678$932,210

Notes

$10,312 of pension expense was posted to the 2024 SS Taxes account 408 in error. It should have been posted to the PSC account 926.

p. 252026 Test Year Attachment 9

Property Tax Equivalent Computation
Estimated for Test Year 2026

  1. 1.For the years 2023-2024, use actual information reported in the PSC Annual Reports.
  2. 2.For estimated 2025 and test year 2026:
  3. a)Plant - January 1 must come from Attachment 11 (Utility/Municipal Financed Plant) and Attachment 11a (Contributed Plant).
  4. b)Major Plant Additions (Both Utility Financed and Contributed) are included for the Test Year for rate case purposes.
  5. c)Construction Work In Progress (CWIP) and Plant Held for Future Use - January 1;

excluding any amounts included as Major Plant Additions in Test Year.

  1. d)Materials and Supplies - January 1 must come from Attachment 13.
  2. e)Plant Outside Limits-January 1 - State the basis for any change from prior year.
  3. f)The utility must state what assumptions it made with regard to projecting the tax rates and assessment ratio.
  4. 3.If the municipality has authorized an amount as allowed by Wis. Stat. § 66.0811(2) [formerly § 66.069 (1)(c)], then place that amount on this line. If no authorization, leave blank. Fully explain the circumstances in Notes.
  5. 4.If the municipality has authorized an amount as allowed by Wis. Stat. § 66.0811(2), then that amount is the tax equivalent payable for the current year. If not, then the tax equivalent payable for the current year is the larger of either the tax equivalent computed for the current year or the 1994 tax equivalent payable in 1995.
  6. 5.The property tax equivalent is not applicable to Water Sanitary Districts.
  7. 6.If the local government adopted a resolution to set the PILOT lower, the Utility must provide a copy of the resolution along with Notes.
  8. 7.Describe unusual situations in the Notes.
ActualActualEstimatedTest Year
DescriptionInstr.2023202420252026
Add:
Utility Plant - January 11$58,774,236$61,320,083
Utility/Municipal Financed Plant - January 12a)$51,581,829$56,602,616
Contributed Plant - January 12a)$12,506,288$12,506,288
Major Plant Additions in Test Year2b)$2,558,968
CWIP & Held for Future Use - January 12c)$1,572,094$1,572,094$0
Materials & Supplies - January 11,2d)$309,606$327,381$370,910$335,966
Less: Plant Outside Limits - January 11,2e)$850,050$959,118$959,118$959,118
Net Taxable Plant$58,233,792$60,688,346$65,072,003$71,044,720
Assessment Ratio (show as a decimal)1,2f)0.98050.94580.94580.9458
Assessed Plant Value$57,098,233$57,399,038$61,545,100$67,194,096
Current Year Net Local & Schools (L&S)
Mill Rate (Line R below)1,2f)14.68947715.33146217.32165517.823983
Tax Equivalent Computed for the Current
Year (Plant Value times L&S Rate/1000)1,3$838,743$880,011$1,066,063$1,197,666
1994 Tax Equivalent Payable in 19951$333,470$333,470$333,470$333,470
Tax Equivalent Authorized by Municipality1,3$0$870,000$870,000$870,000
Tax Equivalent Payable for the Current Year1,4$838,743$870,000$870,000$870,000
ActualActualEstimatedTest Year
Line2023202420252026
Mill Rate DetailRef.TotalTotalTotalTotal
State tax rate(A)0.0000000.0000000.0000000.000000
County tax rate(B)4.3533374.3530924.3850984.512266
Local tax rate(C)8.0840388.8671599.73575710.018094
School tax rate(D)6.8341796.7814177.8985528.127610
Voc. school tax rate(E)0.7248010.7160940.7039150.724329
Other tax rates-Local(F1)0.0000000.0000000.0000000.000000
Other tax rates-Non-Local(F2)0.0000000.0000000.0000000.000000
Total Tax Rate(G)19.99635520.71776222.72332223.382298
Less: State Credit(H)1.2189051.3080471.2596541.296184
Net Tax Rate(I)18.77745019.40971521.46366822.086114
UtilityUtilityUtilityUtility
Local tax rate (Line C above)(J)8.0840388.8671599.73575710.018094
School tax rate (Line D above)(K)6.8341796.7814177.8985528.127610
Voc. school tax rate (Line E above)(L)0.7248010.7160940.7039150.724329
Other tax rates-Local (Line F1 above)(M)0.0000000.0000000.0000000.000000
Total local & schools tax rates(N)15.64301816.36467018.33822418.870032
Total tax rate (Line G above)(O)19.99635520.71776222.72332223.382298
Ratio of local & school tax rate to
total tax rate (Line N divided by O)(P)78.229347%78.988599%80.702214%80.702214%
Net Tax Rate ( Line I above)(Q)18.77745019.40971521.46366822.086114
Net local and school rate: (Line P times Q)(R)14.68947715.33146217.32165517.823983
p. 26

OPERATING EXPENSES
Estimated for Test Year 2026

  1. 1.A historical three-year average is provided. If expenses fluctuate from year to year, the average can be helpful determining the interim and test year estimates.
  2. 2.If either the interim or test year estimate varies from the three-year average by more than plus or minus 15 percent, the cause(s) must be explained in the Notes.
  3. 3.The Utility must describe unusual situations in the Notes.

2022, 2023, 2024

Acct.EstimatedTest Year3 Year EstimatedTest Year
No.Description20222023202420252026Average 20252026
600Operation labor$19,551$8,693$3,129$3,254$3,349$10,458 ExplainExplain
601Operation labor and expenses10,1505,2835,7746,0056,1797,069 Explain
602Purchased water000000
603Miscellaneous expenses000000
604Rents000000
610Maintenance supervision and engineering000000
611Maintenance of structures and improvements000000
612Maint. of collecting and impounding reservoirs000000
613Maintenance of lake, river, and other intakes000000
614Maintenance of wells and springs54,44872,41060,38175,00077,17562,413 ExplainExplain
616Maintenance of supply mains000000
617Maintenance of misc. water source plant000000
Total Source of Supply Expenses$84,149$86,386$69,284$84,259$86,703$79,940
620Operation supervision and engineering$7,839$8,693$3,129$3,254$3,349$6,554 ExplainExplain
621Fuel for power production000000
622Power production labor and expenses000000
623Fuel or power purchased for production264,669289,601255,516250,000257,250269,929
624Pumping labor and expenses1,9801321,4281,4851,5281,180 ExplainExplain
625Expenses transferred--credit000000
626Miscellaneous expenses000000
627Rents000000
630Maintenance supervision and engineering000000
631Maintenance of structures and improvements12,1826,58022,45714,20714,61913,740
632Maintenance of power production equipment000000
633Maintenance of pumping equipment49,55018,77846,32725,00025,72538,218 ExplainExplain
Total Pumping Expenses$336,220$323,784$328,857$293,946$302,471$329,620
640Operation supervision and engineering$0$0$0$0$0$0
641Chemicals114,814122,619112,844120,729124,230116,759
642Operation labor and expenses52,10159,13559,71262,10063,90156,983
643Miscellaneous expenses15,6466,6421937,7487,9737,494
644Rents000000
650Maintenance supervision and engineering000000
651Maintenance of structures and improvements000000
652Maintenance of water treatment equipment01,7630608625588
Total Water Treatment Expenses$182,561$190,159$172,749$191,185$196,729$181,823
NOTE:All 2025 and test year 2026 estimates that vary from the three year average by

more than (plus or minus) 15 percent must be explained in detail in the Notes.

p. 272026 Test Year ATTACHMENT 10

OPERATING EXPENSES
Estimated for Test Year 2026

0

Acct.EstimatedTest Year3 Year EstimatedTest Year
No.Description20222023202420252026Average 20252026
660Operation supervision and engineering$121,792$115,789$159,012$165,372$170,168$132,198 ExplainExplain
661Storage facilities expenses4,1722,9361,7733,0613,1502,960
662Transmission and distribution expenses26,21829,11426,26546,50047,84927,199 ExplainExplain
663Meter expenses19,69025,58539,35425,00025,72528,210
664Customer installations expenses000000
665Miscellaneous expenses132,081144,912130,173140,337144,406135,722
666Rents00000
670Maintenance supervision and engineering7,8398,6933,1293,2543,3496,554 ExplainExplain
671Maintenance of structures and improvements00000
672Maintenance of distr.reservoirs and standpipes6,5183,8454,661125,178128,8085,008 ExplainExplain
673Maintenance of transmission and distr. mains45,96558,46998,466100,000102,90067,633 ExplainExplain
675Maintenance of services176,583369,276450,060200,000205,800331,973 ExplainExplain
676Maintenance of meters21,3475,1127,61211,74312,08411,357
677Maintenance of hydrants37,99687,65332,36075,00077,17552,670 ExplainExplain
678Maintenance of miscellaneous plant000000
Total Transmission and Distribution Expenses$600,201$851,384$952,865$895,445$921,414$801,483
901Supervision$21,088$22,601$19,986$22,074$22,714$21,225
902Meter reading labor19,59012,9537,5887,8928,12013,377 ExplainExplain
903Customer records and collection expenses118,166122,408142,632132,078135,909127,735
904Uncollectible accounts1956290284292275
905Miscellaneous customer accounts expenses000000
906Customer service and Information Expenses673680752726747702
Total Customer Accounts Expenses$159,712$159,271$170,958$163,054$167,782$163,314
910Sales Expenses$0$0$0$0$0$0
920Administrative and general salaries$2,311$2,380$2,912$3,028$3,116$2,534 ExplainExplain
921Office supplies and expenses75,24773,48485,64680,78283,12578,126
922Administrative expenses transferred -- credit00000
923Outside services employed108,47142,04289,342125,000128,62579,952 ExplainExplain
924Property insurance33,24934,87838,67339,98841,14835,600Explain
925Injuries and damages17,54616,85519,98118,74419,28718,127
926Employee pensions and benefits333,278430,456604,182503,305516,451455,972
928Regulatory commission expenses001,78810,61610,924596 ExplainExplain
929Duplicate charges -- credit00000
930Miscellaneous general expenses39,82332,12948,98841,48242,68540,313
931Rents00000
932Maintenance of general plant34,16434,00144,81138,93940,06837,659
Total Admin. And General Expenses$644,089$666,225$936,323$861,884$885,429$748,879
Total Oper. And Maint. Expenses$2,006,932$2,277,209$2,631,036$2,489,773$2,560,528$2,305,059
NOTE:All 2025 and test year 2026 estimates that vary from the three year average by

more than (plus or minus) 15 percent must be explained in detail in the Notes.

p. 28

UTILITY PLANT IN SERVICE

Estimated for Test Year 2026 Utility or Municipal Financed Transactions Only

  1. 1.If any Plant Additions require Construction Approval by the PSC, a request for approval must be submitted to the Commission for this rate increase application to be processed. Please list the construction docket number(s):
  2. 2.Do not include Plant financed by Contributions. Contributed Plant is shown in Attachment 11a.
ActualEstimatedEstimate 2026EstimatedTest Year
Acct.Balance2025BalanceMajor ConstructionRoutine ConstructionBalanceAverage
No.Plant account12/31/2024AdditionsRetirementsAdjustments12/31/2025Additions RetirementsAdditions Retirements12/31/2026Balance
Notes (A,B)Note (B)Notes (A,B) Note (B)Notes (A,B) Note (B)
Intangible Plant
301Organization$0$0$0$0$0$0 $0$0$0$0$0
302Franchises and consents00$0000 00000
303Miscellaneous intangible plant00$0000 00000
0
Total Intangible Plant$0$0$0$0$0$0 $0$0$0$0$0
Source of Supply
310Land and land rights$0$0$0$0$0$0 $0$0$0$0$0
311Structures and improvements00000757,000 000757,000757,000
312Collecting and impounding reservoirs000000 00000
313Lake, river, and other intakes000000 00000
314Wells and springs1,628,553115,000001,743,553500,000 11,032002,232,5212,232,521
316Supply mains13,61600013,616557,000 000570,616570,616
317Other water source plant000000 00000
Total Source of Supply Plant$1,642,169$115,000$0$0$1,757,169$1,814,000 $11,032$0$0$3,560,137$3,560,137
Pumping Plant
320Land and land rights$966,897$0$0$0$966,897$0 $0$0$0$966,897$966,897
321Structures and improvements3,536,6390003,536,6390 0003,536,6393,536,639
323Other power production equipment00000350,000 000350,000350,000
325Electric pumping equipment818,149000818,1490 000818,149818,149
326Diesel pumping equipment000000 00000
328Other pumping equipment141,263000141,2630 000141,263141,263
Total Pumping Plant$5,462,948$0$0$0$5,462,948$350,000 $0$0$0$5,812,948$5,812,948
Water Treatment Plant
330Land and land rights$0$0$0$0$0$0 $0$0$0$0$0
331Structures and improvements9,521,0710009,521,071335,000 0009,856,071$9,856,071
332Sand or Other Media Filtration Equip1,580,8130001,580,8130 0001,580,813$1,580,813
333Membrane Filtration Equipment000000 0000$0
334Other Water Treatment Equipment619,090000619,09071,000 000690,090$690,090
Total Water Treatment Plant$11,720,974$0$0$0$11,720,974$406,000 $0$0$0$12,126,974$12,126,974

p. 292026 Test Year ATTACHMENT 11

UTILITY PLANT IN SERVICE
Estimated for Test Year 2026
Utility or Municipal Financed Transactions Only

EstimatedEstimate 2026Test Year
Acct.Actual2025BalanceMajor ConstructionRoutine ConstructionEstimatedAverage
No.Plant accountBalanceAdditionsRetirementsAdjustments12/31/2025Additions RetirementsAdditions RetirementsBalanceBalance
12/31/2024Notes (A,B)Note (B)Notes (A,B) Note (B)Notes (A,B) Note (B)12/31/2026
Transmission and Distribution Plant
340Land and land rights$9,148$0$0$0$9,148$0 $0$45,000 $0$54,148$31,648
341Structures and improvements000000 00 000
342Distribution reservoirs and standpipes1,547,51421,900001,569,4140 00 01,569,4141,569,414
343Transmission and distribution mains16,327,8053,921,200132,171020,116,8340 01,935,100 141,20621,910,72821,013,781
345Services3,637,632676,1564,99804,308,7900 0313,800 9,6644,612,9264,460,858
346Meters3,783,0180003,783,0180 00 03,783,0183,783,018
348Hydrants2,039,794425,53935,49002,429,8430 0366,100 5,5462,790,3972,610,120
349Other transmission and distr. plant95,05900095,0590 00 095,05995,059
Total Transmission and Distr. Plant$27,439,970$5,044,795$172,659$0$32,312,106$0 $0$2,660,000 $156,416$34,815,690$33,563,898
General Plant
389Land and land rights$15,741$0$0$0$15,741$0 $0$0$0$15,741$15,741
390Structures and improvements3,823,4520003,823,4520 0003,823,4523,823,452
391Office furniture and equipment23,23000023,2300 00023,23023,230
391.1Office furniture & equip - Computers224,3803,00000227,3800 000227,380227,380
392Transportation equipment668,716000668,7160 000668,716668,716
393Stores equipment2,7070002,7070 0002,7072,707
394Tools, shop and garage equipment388,964000388,9640 000388,964388,964
395Laboratory equipment26,60800026,6080 00026,60826,608
396Power operated equipment124,050000124,0500 000124,050124,050
397Communication equipment17,92099,70069,049048,5710 00048,57148,571
397.1SCADA equipment000000 00000
398Miscellaneous equipment000000 00000
Total General Plant$5,315,768$102,700$69,049$0$5,349,419$0 $0$0$0$5,349,419$5,349,419
Total Plant In Service$51,581,829$5,262,495$241,708$0$56,602,616$2,570,000 $11,032$2,660,000 $156,416$61,665,168$60,413,376

Please enter the construction docket(s) below: 5690-CW-108 for Well 12

p. 302026 Test Year ATTACHMENT 11a

Contributed Plant
Estimated for Test Year 2026
Contributed Plant Transactions Only

  1. 1.If any Plant Additions require Construction Approval by the PSC, a request for approval must be submitted to the Commission for this rate increase application to be processed. Please list the construction docket number(s):

Actual

Acct. No.Plant account Intangible PlantContributed Plant 12/31/2024Estimated 2025 Additions Note (A)RetirementsAdjustmentsEstimated Balance 12/31/2025Major Construction Additions Note (A)Estimate 2026 RetirementsRoutine Construction Additions Note (A)RetirementsEstimated Balance 12/31/2026
301Organization$0$0$0$0$0$0$0$0$0$0
302Franchises and consents0000000000
303Miscellaneous intangible plant0000000000
Total Intangible Plant$0$0$0$0$0$0$0$0$0$0
Source of Supply
310Land and land rights$0$0$0$0$0$0$0$0$0$0
311Structures and improvements0000000000
312Collecting and impounding reservoirs0000000000
313Lake, river, and other intakes0000000000
314Wells and springs0000000000
316Supply mains0000000000
317Other water source plant0000000000
Total Source of Supply Plant$0$0$0$0$0$0$0$0$0$0
Pumping Plant
320Land and land rights$100,000$0$0$0$100,000$0$0$0$0$100,000
321Structures and improvements2,168,6300002,168,63000002,168,630
323Other power production equipment0000000000
325Electric pumping equipment0000000000
326Diesel pumping equipment0000000000
328Other pumping equipment0000000000
Total Pumping Plant$2,268,630$0$0$0$2,268,630$0$0$0$0$2,268,630
Water Treatment Plant
330Land and land rights$0$0$0$0$0$0$0$0$0$0
331Structures and improvements0000000000
332Sand and other media filtration Equip0000000000
333Membrane Filtration Equipment0000000000
334Other Water Treatment Equipment0000000000
Total Water Treatment Plant$0$0$0$0$0$0$0$0$0$0

p. 312026 Test Year ATTACHMENT 11a

Contributed Plant
Estimated for Test Year 2026
Contributed Plant Transactions Only
Actual

Acct. No.Plant account Transmission and Distribution PlantContributed Plant 12/31/2024Estimated 2025 Additions Note (A)RetirementsAdjustmentsEstimated Balance 12/31/2025Major Construction Additions Retirements Note (A)Estimate 2026Routine Construction Additions Note (A)RetirementsEstimated Balance 12/31/2026
340Land and land rights$0$0$0$0$0$0$0$0$0$0
341Structures and improvements0000000000
342Distribution reservoirs and standpipes0000000000
343Transmission and distribution mains7,212,4240007,212,42400007,212,424
345Services1,986,9260001,986,92600001,986,926
346Meters0000000000
348Hydrants1,038,3080001,038,30800001,038,308
349Other transmission and distr. plant0000000000
Total Transmission and Distr. Plant$10,237,658$0$0$0$10,237,658$0$0$0$0$10,237,658
General Plant
389Land and land rights$0$0$0$0$0$0$0$0$0$0
390Structures and improvements0000000000
391Office furniture and equipment0000000000
391.1Office furniture & equip - Computers0000000000
392Transportation equipment0000000000
393Stores equipment0000000000
394Tools, shop and garage equipment0000000000
395Laboratory equipment0000000000
396Power operated equipment0000000000
397Communication equipment0000000000
397.1SCADA equipment0000000000
398Miscellaneous equipment0000000000
Total General Plant$0$0$0$0$0$0$0$0$0$0
Total$12,506,288$0$0$0$12,506,288$0$0$0$0$12,506,288

Please list the construction docket(s) below:

p. 32

DEPRECIATION ACCRUAL AND EXPENSE
Estimated for Test Year 2026

  1. 1.The Estimated 2025 Depreciation Accrual in Column (A) is to be calculated based upon the current depreciation rates.
  2. 2.The Test Year 2026 Depreciation Accrual in Column (B) is to be based upon the PSC Recommended Depreciation Benchmark Rates (revised

March 2, 2000) or upon the Utility Proposed Rates for the test year.

  1. i.If any rate other than the benchmark will be used for the test year, the rate should be entered. If an account is fully depreciated, a depreciation rate of 0% must be inserted.
  2. 3.Enter the appropriate adjustment information at the bottom of the schedule to reconcile the depreciation accrual to the estimated depreciation expense.
  3. 4.In the Notes, the Utility must describe unusual situations such as Miscellaneous Credits or adjustments
Acct.(per Attach. 11)(per Attachment 11)
No.Plant accountDepr.Avg. DepreciableDepreciationDepr.Average Depreciable BalanceDepreciation AccrualTest Year
301-303 310Total Intangible Plant Source of Supply Land and land rightsRate (A) N/A N/AEstimated 2025 Balance N/A N/AAccrual N/A N/ARate (B) N/A N/AMajor N/A N/ATest Year 2026 Routine N/A N/AMajor N/A N/ARoutine N/A N/ATotal N/A N/A
311Structures and improvements0.00%$0$03.20%$757,000$0$24,224$0$24,224
312Collecting and impounding reservoirs0.00%$001.70%00000
313Lake, river, and other intakes0.00%$001.70%00000
314Wells and springs2.90%$1,686,05348,8962.90%500,0001,732,52114,50050,24364,743
316Supply mains1.80%$13,6162451.80%557,00013,61610,02624510,271
317Other water source plant0.00%$004.50%00000
Total Source of Supply Plant$49,141$99,238
Pumping Plant
320Land and land rightsN/AN/AN/AN/AN/AN/AN/AN/AN/A
321Structures and improvements3.20%$3,536,639$113,1723.20%$0$3,536,639$0$113,172$113,172
323Other power production equipment0.00%$004.40%350,000015,400015,400
325Electric pumping equipment4.40%$818,14935,9994.40%0818,149035,99935,999
326Diesel pumping equipment0.00%$004.40%00000
328Other pumping equipment4.40%$141,2636,2164.40%0141,26306,2166,216
Total Pumping Plant$155,387$170,787
Water Treatment Plant
330Land and land rightsN/AN/AN/AN/AN/AN/AN/AN/AN/A
331Structures and improvements3.20%$9,521,071$304,6743.20%$335,000$9,521,071$10,720$304,674$315,394
332Sand or Other Media Filtration Equip3.30%$1,580,81352,1673.30%01,580,813052,16752,167
333Membrane Filtration Equipment0.00%$006.00%00000
334Other Water Treatment Equipment6.00%$619,09037,1456.00%71,000619,0904,26037,14541,405
Total Water Treatment Plant$393,986$408,966

p. 332026 Test Year ATTACHMENT 12

DEPRECIATION ACCRUAL AND EXPENSE
Estimated for Test Year 2026

Estimated 2025 Acct. (per Attach. 11) No. Plant account Depr. Avg. Depreciable Rate (A) Balance Transmission and Distribution Plant 340 Land and land rights N/A N/ADepreciation Accrual N/ADepr. Rate (B) N/ATest Year 2026 (per Attachment 11) Average Depreciable Balance Depreciation Accrual Major Routine Major Routine N/A N/A N/A N/ATest Year Total N/A
341 Structures and improvements 0.00% $0$03.20%$0 $0 $0 $0$0
342 Distribution reservoirs and standpipes 1.90% $1,558,46429,6111.90%0 1,569,414 0 29,81929,819
343 Transmission and distribution mains 1.30% $18,222,320236,8901.30%0 21,013,781 0 273,179273,179
345 Services 2.90% $3,973,211115,2232.90%0 4,460,858 0 129,365129,365
346 Meters 5.50% $3,783,018208,0665.50%0 3,783,018 0 208,066208,066
348 Hydrants 2.20% $2,234,81949,1662.20%0 2,610,120 0 57,42357,423
349 Other transmission and distr. plant 5.00% $95,0594,7535.00%0 95,059 0 4,7534,753
Total Transmission and Distr. Plant$643,709$702,605
General Plant
389 Land and land rights N/A N/AN/AN/AN/A N/A N/A N/AN/A
390 Structures and improvements 2.90% $3,823,452$110,8802.90%$0 $3,823,452 $0 $110,880$110,880
391 Office furniture and equipment 5.80% $23,2301,3475.80%0 23,230 0 1,3471,347
391.1 Office furniture & equip - Computers 26.70% $225,88060,31026.70%0 227,380 0 60,71060,710
392 Transportation equipment 13.30% $668,71688,93913.30%0 668,716 0 88,93988,939
393 Stores equipment 5.80% $2,7071575.80%0 2,707 0 157157
394 Tools, shop and garage equipment 5.80% $388,96422,5605.80%0 388,964 0 22,56022,560
395 Laboratory equipment 5.80% $26,6081,5435.80%0 26,608 0 1,5431,543
396 Power operated equipment 7.50% $124,0509,3047.50%0 124,050 0 9,3049,304
397 Communication equipment 15.00% $33,2464,98715.00%0 48,571 0 7,2867,286
397.1 SCADA equipment 0.00% $009.20%0 0 0 00
398 Miscellaneous equipment 0.00% $005.80%0 0 0 00
Total General Plant$300,027$302,726
Total $52,481,348$1,542,250$2,570,000 $56,829,090 $79,130 $1,605,192$1,684,322
Miscellaneous Credits (Charges) to Accrual$0Miscellaneous Credits (Charges) to Accrual$0
Estimated Depreciation Accrual (To Attachment 13)==>$1,542,250(To Attachment 13)==>$1,684,322
Meter depr. allocated to sewer (deduction) 50 % <=Change if different(104,033)50 % <=Change if different allocation to sewer(104,033)
Adjustments & Depreciation charged clearing accounts, etc: add (deduct):00
(Specify)00
(Specify)00
Estimated Depreciation Expense$1,438,217Test Year Depreciation Expense (To Attachment 14)==>$1,580,289

Please enter any full depreciated assets below:

p. 34

ATTACHMENT 13

2026 Test Year Estimated for Test Year 2026

  1. 1.The depreciation accrual totals for 2025 and 2026 must agree with Attachment 12. For rate case purposes, major construction additions are factored into the calculated accrual as if in service the entire year.
  2. 2.The plant retirements totals for 2025 and 2026 must agree with Attachment 11. If test year retirements are being retired as a result of major construction project, indicate that portion in the major projects column.
  3. 3.If there is a variance to the prior year balance of more or less than 15%, please state the basis used for developing the M & S estimates for 2025 & 2026.
  4. 4.Explain adjustments in Notes section.

Test Year

Accumulated Depreciation (Account 111.1)Major ProjectsRoutine TotalAverage Balance
January 1, 2025 Balance(Estimated)$19,785,698
Add: Annual Accrual(per Attachment 12)(A)1,542,250
Salvage(Estimated)$0 0
Less: Retirements(per Attachment 11)(B)241,708
Cost of Removal(Estimated)$0 0
Adjustmentsincrease (decrease)(C)0 0
December 31, 2025 Balance(Estimated)$21,086,240$21,086,240
Add: Annual Accrual(per Attachment 12)(A)$79,130$1,605,192 1,684,322881,726
Salvage(Estimated)00 00
Less: Retirements(per Attachment 11)(B)11,032156,416 167,44889,240
Cost of Removal(Estimated)00 00
December 31, 2026 Balance(Estimated)$22,603,114
Test Year Average Balance$21,878,726
Materials and Supplies InventoryTest Year
Account Balances:Average Balance
December 31, 2022(Actual)$309,606
December 31, 2023(Actual)327,381
December 31, 2024(Actual)370,910
December 31, 2025(Estimated)(D)335,966$167,983
December 31, 2026(Estimated)(D)344,752172,376
Test Year Average Balance$340,359
p. 35

Estimated for Test Year 2026

  1. 1.Part One calculates the Net Operating Income (loss) for the test year. All amounts are derived from other attachments except Amortization Expense, Account 404, which , if applicable, must be entered and the purpose specified.
  2. 2.Part Two is a calculation of Average Net Investment Rate Base for the test year. All amounts are derived from other attachments
  3. 3.Part Three calculates the estimated requested increase.
  4. i.Enter a requested rate of return (ROR) in the highlighted box and the estimated increase is calculated.
  5. ii.Generally, the current benchmark rate is used for most situations. If the Utility requests a different ROR, please describe the reasons in the Notes. An example of supporting detail would be a Cash Flows statement.
Part One: Total Operating Revenues(per Attachment 7)$5,252,038
Total Operation and Maintenance Expenses(per Attachment 10)$2,560,528
Depreciation Expense(per Attachment 12)1,580,289
Amortization Expense--Account # 404 (specify):0
Taxes(per Attachment 8)932,210
Total Operating Expenses$5,073,027
Net Operating Income (Loss)-Test Year 2026$179,011
Part Two: Utility Plant In Service--Financed by Utility or Municipality:
Test Year Average Balance(per Attachment 11)$60,413,376
Materials and Supplies:
Test Year Average Balance(per Attachment 13)340,359
Less: Accumulated Depreciation:
Test Year Average Balance(per Attachment 13)21,878,726
Average Net Investment Rate Base (NIRB)$38,875,009
Part Three: Average Net Investment Rate Base(per Part Two above)$38,875,009
TIMES Rate of Return Requested
(Enter requested rate in this box.)6.70%6.70%
Return on Average Net Investment Rate Base (NIRB)$2,604,626
Total Operation and Maintenance Expenses(per Part One above)$2,560,528
TIMES allowance on O&M expenses6.00%
Operating Allowance$153,632
Enter the larger of either:
The Return on NIRB (A) or the Operating Allowance (B)$2,604,626
Less: Estimated Net Operating Income (Loss)(per Part One above)179,011
Increase Requested-Test Year 2026$2,425,615
Overall Percentage Increase in
Total Sales of Water at Current Rates:48.39%

p. 362026 Test Year ATTACHMENT 14a

STEVENS POINT MUNICIPAL WATER UTILITY

CASH FLOW
Forecasted 2026 - With Full Debt Service

Forecasted Without IncreaseForecasted With Increase
Operating Income (Loss)$179,011$179,011
Rate Increase2,425,615
Add:
Depreciation1,580,2891,580,289
Investment income135,181135,181
Less:
Capital Additions Funded with Utility Earnings(60,000)(60,000)
Debt payments (A)
Interest(461,342)(461,342)
Principal(1,043,859)(1,043,859)
Net Cash Flow$329,279$2,754,894
  1. (A)- Debt payments include the principal and interest on 2009 GO Notes, 2011 Revenue Bonds, 2022 Revenue Bond and tentative 2026 Revenue Bonds

p. 372026 Test Year ATTACHMENT 14b

STEVENS POINT MUNICIPAL WATER UTILITY

DEBT COVERAGE
Forecasted 2026

Actual Net EarningsWithout Increase Forecasted 2026With Increase Forecasted 2026
Operating revenues$5,252,038$5,252,038
Rate Increase-2,425,615
Interest income135,181135,181
Operation and maintenance expenses(2,560,528)(2,560,528)
Taxes other than equivalent(62,210)(62,210)
Actual Net Earnings$2,764,480$5,190,096

Required Net Earnings
Minimum Earnings Required:

Debt service - revenue bonds*1,505,201$1,505,201
Coverage factor1.101.10
Minimum Earnings Required$1,655,722$1,655,722
Estimated Debt Coverage - as
Defined in Bond Resolutions1.673.13
DEBT COVERAGE WITH PILOT
Defined Earnings (above)$2,764,480$5,190,096
Less: Tax Equivalent(870,000)(870,000)
Adjusted Defined Earnings$1,894,480$4,320,096
Revenue Bond Debt Service Above$1,505,201$1,505,201
True Total Debt Coverage1.262.87
  • –Includes proposed debt issuance for 2026
p. 38

FINANCING AND DEBT SUMMARY

FINANCING OF PLANT ADDITIONS (Including Contributed Plant)

  1. 1.Identify the sources of financing plant additions for interim and test years. Use descriptions provided or specify other types of financing.

Estimated Test Year
Description 2025 2026

Contributed Plant by Developers
Contributed Plant by Customers
Special Assessments--Collections and Tax Roll
Grants for Plant Additions
Plant Paid for by Municipality
Plant Paid for by TIF District

Proceeds from Debt Issued during Year5,100,000
Special Construction Funds
Available Cash or Invested Funds1,572,094
Utility Earnings3,690,40160,000
Other: (Specify)
Total$5,262,495$5,160,000
Utility Financed Plant from Attachment 115,262,4955,230,000
Contributed Plant from Attachment 11a--
Total$5,262,495$5,230,000

The total financing of additions should agree to the total additions to plant as forecast on Attachments 11 and 11a.

DEBT SUMMARY

  1. 1.List Utility's debt issues. Use only one line for each existing and estimated new debt issue.
  2. i.Include the corresponding annual interest, either accrued or payable, for each issue.
  3. ii.All debt issues for all utility departments and non-utility sewer departments reported in the PSC annual report must be included, unless a separate balance sheet and income statement are provided.
  4. 2.If necessary, please describe unusual situations in the Notes.
Estimated 2025Estimated 2026Estimated 2027
Description Outstanding Debt Issues - Detailed List:Annual Interest Expense (1)Outstanding Principal End of YearAnnual Interest Expense (1)Outstanding Principal End of YearAnnual Interest Expense (1)Outstanding Principal End of Year
2009 Go notes$10,855$364,238$8,551$276,742$6,185$186,913
2011 Revenue Bonds$93,914$3,963,016$80,310$3,337,919$66,407$2,699,070
2022 Revenue Bonds$176,231$3,970,000$168,481$3,810,000$160,356$3,645,000
2026 Revenue Bonds$0$0$204,000$4,928,733$197,149$4,750,615
Totals$281,000$8,297,254$461,342$12,353,394$430,097$11,281,598
Note (1): Include as Interest Expense amounts which will be reported in Account 427, Interest on Long Term Debt;

in Account 430, Interest on Debt to Municipality; and Account 431, Other Interest Charges.

p. 39

IMPACT FEES

A. This attachment requests information about impact fees. If the utility has impact fees, please complete the schedule and supply the impact fee study and impact fee ordinance as a separate file on ERF.

Is the utility currently collecting impact fees,
No
capacity assessments, or other such fees?

If yes, answer the following:

  1. 1)Describe the facilities to be constructed using the impact fees.
  2. 2)Provide the year the impact fees were adopted.
  3. 3)Provide the year the facilities were or will be constructed.
  4. 4)Provide a copy of the most recent impact fee study and impact fee ordinance.

Note: If more than one water utility impact fee exists, answer the above questions for each project. If more space is needed please include an explanation in the footnotes on Attachment 19.

p. 40

MISCELLANEOUS
Test Year 2026

2026 Test Year ATTACHMENT 17 Part One:

If plant accounts in Attachment 11 and/or Attachment 11a (Utility Plant in Service) have transactions for the interim or test year for Account 343 (Mains) or Account 348 (Hydrants) specify the units added and/or retired for each account .

Attachment 11Attachment 11aIndicate diameter(s)
YearUnits AddedUnits RetiredUnits Units Added RetiredNet and length(s) of main Units added and retired
Feet of Main202524,17715,9288,249 -1,008, 6"-14,279, 8"-1.424, 10"-3
Feet of Main-Routine202611,02211,0220 13, 6"-5,015, 8"-302, 10"-176, 12"
Feet of Main-Major Projects20260
Hydrants2025442717
Hydrants-Routine202615150
Hydrants-Major Projects20260

Water Service Installation

Does the utility wish to revise Schedule Cz-1, the charge for installing a water service?
No

Late Fees

The Wisconsin Administrative Code provides alternatives for late payment charges on delinquent bills for service. If the utility is also regulated by the PSC for electric and/or sewer rates, it is recommended that the charge be consistent for all. Please indicate which late payment charge the utility wants to be included in its tariff.

1% per month charge

Other Charges (Schedule OC-1)

Non-Sufficient FundsYes$ $ 25.00
Is the Utility also regulated for electric and/or sewer rates?No - water rates only
Amount charged by your financial institution:$$12.00
Special Billing ChargeYes$$5.00
Special Meter Reading ChargeYes$$ 10.00
Missed Appointment ChargeNo
Real Estate Closing ChargeNo$
Reconnection Charges (Schedule R-1)Field StaffAdmin StaffVehicle
Normal Business Hours:$$ 45.00# of Hours0.750.250.50
After Hours:$$ 105.00Hourly Rate$36.79$31.49$14.42
R-1 Total$27.59$7.87$7.21

Public Fire Protection Charges (Schedule F-1)

How will the utility collect the PFP charge?

Equivalent Meter

Direct Charge on Water Bill Method for calculating direct charges:

Will direct charges also be applied to non-customers who own property in the municipality?

No

If your utility collects PFP through a municipal charge, please answer the following question.

  1. 1.Does the utility have water customers that reside outside the municipal limits? No
  2. 2.If yes, does the utility wish to provide an outside utility rate to recover public fire No protection costs through a Schedule Mg-2?

Schedule X-4: Deferred Payment Agreements (DPA)

No

Do you request to amend the utility's tariff related to DPA's for residential customers?

p. 41

Schedule X-4: Continued

  1. 1.Do you currently offer leak credits to water customers? If so, please provide your policy on Attach19. No

Select the rate option for billing excess usage due to leak:

Yes

Option 1) the lowest volumetric rate provided in the utility’s Schedule Mg-1.
Option 2) $X.YZ per [1,000 gallons/100 cubic feet]. See your records or most recent cost study.

  1. 2.Do you currently offer budget billing to water customers? If so, please provide your policy on Attach19. No

General Service Rate Design (Schedule Mg-1)

Please indicate the preferred rate design for each customer class:

General/ResidentialUniform Rate
Multifamily ResidentialUniform Rate
Non-ResidentialDeclining Block Rate

Please indicate if you would like an irrigation rate or an additional meter charge (choose one or none).

Irrigation Rate No
Additional Meter Charge (Am-1) Yes
Are you interested in rate design to promote conservation goals?No

If you decide to pursue an irrigation rate, then please provide the following information:

The Public Service Commission of Wisconsin defines the irrigation customer class as “customers who have water service provided primarily for landscape irrigation. For the purpose of this schedule, landscape irrigation includes the use of water to sustain crops, lawns, or landscapes on any residential, commercial, industrial, or public authority property, including water used for irrigating athletic fields, parks, and golf courses. Irrigation customers include those customers that have multiple meters installed on a single lateral for the purpose of measuring water that is not discharged to the sanitary sewer system. The utility shall classify each additional meter as an irrigation meter and treat each meter as a separate general service customer.”

  1. 1)We will eliminate Schedule Am-1 from your tariff. All existing Am-1 deduct meters will become irrigation meters and
  2. 2)Please identify all of your irrigation customers. This will become your new irrigation customer class that will receive its own unique uniform water rate. Water for irrigation will have higher volume rates than general service volume rates due
  3. 3)Update the meter count, fixed revenues, volume revenues, and total actual billed revenues for the irrigation customer class as shown in Attachment 2B. Remember that as you add a meter to the irrigation class, you must subtract it from one of the other customer classes.
  4. 4)Please identify the annual combined consumption of the irrigation meters by rate block. Update Attachment 2A accordingly. Remember that as you add consumption to the irrigation customer class, you must subtract it from some of the other customer classes. The irrigation usage must be based on your customers that will be reclassified as irrigation customers.

Describe any proposed modifications to the general service rates or list any other proposed tariff or schedule changes below: Also, please indicate any tariff language the Utility currently has that is considered non-standard. (e.g. X-1, Mg-1, F-1, etc.)

NOTE: Utilities proposing a modified rate structure should submit detailed customer billing information for the most recent 12

months. For each billing period, include an analysis by customer class of the number of customer bills ending in each 1,000 gallon or 100 cubic foot increment, the total number of bills in the billing period, and the total volume of sales in the billing period. For residential customers, it is suggested that the increments be in 1,000's of gallons, up to 25,000 gallons per month (75,000 gallons per quarter), and then by 5,000 gallon increments.

p. 42

Utility COSS/RD Exhibit

No

Does the Utility plan to issue its own cost-of-service study and rate design?

If yes, please submit the proposed cost-of-service study and rate design exhibit within 20 Days of accepting the Revenue Requirement (Ex.-PSC-Revenue Requirement).

Rebate Programs Does the Utility wish to establish a new rebate or incentive program

No

for water saving fixtures and/or water efficiency process changes?

If yes, the Utility must obtain PSC approval before spending additional ratepayer-generated funds on these efforts. In general, the PSC allows utilities to spend one to two percent of total operating revenues on water conservation programs. Please provide the PSC with an implementation plan that is consistent with “Implementing Toilet Rebates and Other Incentive Programs” found on our website: http://psc.wi.gov/conservation/documents/wc-RebateProgram.pdf

Once a conservation program is approved, the Utility will be required to report annually on the costs, gallon savings, and other supporting information about its program by completing page W-27 in the WEGS Annual Reporting System.

Are there any specific timing constraints that this case is depending on? Are there any external deadlines related to funding or other issues (DNR or safe drinking water) that Commission staff should be aware of?

Footnotes

p. 43

WATER CONSERVATION SPENDING
Test Year 2026

  1. 1.This attachment requests information about the utilty's water conservation spending. The utility only needs to complete this schedule if it has a PSC approved water conservation program.
  2. 2.If the utility has a conservation program that was authorized by the PSC, please complete the deferred expense schedule below.

Deferred Expense Schedule:

End of Year

Beginning Account 186 Account 253

Expenses

Program Year Ending Balance Expenditures Collections

  1. (a)(b) (c) (d) (e) December 31, December 31, December 31, December 31,
Net Balance of Acct. 186 (debit) and Acct. 253 (credit) Last Actual Year$0
Amortization Expense (Net Balance Divided by 3)$0
Estimated Future Annual Expenditures$0
Total Expenses (To be Recorded in Account 906)$0

What are the estimated effects of the utility's planned water conservation and efficiency

program on water sales for the test year? Estimate the reduction in volumetric sales, by customer class, for the test year. Test year sales in Attachment 3 should reflect adjustments for conservation.

Test Year Sales Conservation Adjusted
Customer Class
Without Conservation Test Year Sales
Residential
Multifamily
Commercial
Industrial
Public Authority
Other

Additional Comments:

p. 44

Additional Notes

Attachment 1

Answer to question 2a. is No

Attachment 10C:

600, 601, 620, 624, 660,670, 902 & 920 - Operation labor and benefits

Increase from the 3-year average related to the additional four staff members being hired in 2024, general wage increases and additional benefits accruals related to GASB 101 implementation. The variance between accounts is based on the actual hours employees spend on tasks related to expenses.

614 - Maintenance of wells and springs:
2025 is expected to see increased costs for well 12 and water tower inspections.

633 - Maintenance of pumping equipment:

Increase in 2024 related to pump maintenance for well 11, which is not anticipated occur in 2025 and 2026.

662 - Transmission and distribution expenses:
Increase in maintenance costs and inventory use in 2025 and 2026 related to inspections.

672 - Maintenance of distr. reservoirs and standpipes:
The $1.8M of water tower painting costs were normalized over 15 years.

673 - Maintenance of transmission and distr. mains:
Increase in maintenance costs and inventory use in 2025 and 2026 due to the aging system.

675 - Maintenance of services:

Decrease in maintenance cost and use of inventory items in 2025 and 2026 relating to inspections that occurred in 2023 and 2024.

677 - Maintenance of hydrants:
Increase relates to the 2025 and 2026 costs incurred for hydrant painting, not incurred in 2024.

923 - Outside services employed:

The increase reflects additional costs for 50% of the city engineer's wages rather than hiring a full-time engineer.

924 - Property insurance:
The increase is due to the annual rise in property insurance fees.

928 - Regulatory commission expenses:
The CRC fees totaled $30K were normalized over 3 years.

Attachment 19a

Answer to Water Tower Painting question b: The utility plans to demolish the Bliss Ave Tower and construct a new Lattice Tower. Therefore, the utility does not plan to paint the Bliss Ave Tower. The construction of the new tower project is expected to start in 2027.

p. 45

ATTACHMENT 19a

2026 Test Year Required Supplemental Information
Pensions and Benefits Expense

  1. a.Pension and Benefits Expense should include Pensions, Health Insurance, Life Insurance, and other employee benefits. It should not include employee payroll taxes and employee reimbursement expenses such as phone and transportation. The totals on this schedule should equal the total Pensions and Benefits Expense listed on Attachment 10.
  2. b.Expense details should be provided for the test year and three prior years for Account 686 (Class D) or Account 926 (Classes AB and C).
20232024 2025 2026
Pensions66,78565,339 67,953 69,923
Health Insurance309,538320,502 333,322 342,988
Life Insurance2,0872,359 2,453 2,525
Sick Leave45,970168,312 50,000 50,000
Other employees benefits/reimbursements6,07647,670 49,577 51,015
Total for Account 686 or 926430,456604,182 503,305 516,451

These totals should agree with Attach10
Membership Dues

  1. a.Membership Dues should include each organization the Utility belongs to as well as the account number that Membership Dues are recorded in.
  2. b.For each organization the utility belongs to, identify the amount of the dues for the years noted below and indicate what expense account is charged.
Account20252026
AWWA1-1-9300027002800
WRWA1-1-93000660660
MEG - water1-1-9300020002000
Alliance for Water Efficiency
Other-WEF1-1-92600364364

Other-Explain

Water Tower Painting

  1. a.Water Tower Painting should include each water tower painting. Please provide an explanation on the Current Cost in the Notes.
  2. b.The normalized cost of water tower painting should be included in the forecast for Account 650 (Class C&D utilities) or Account 672 (Class AB utilities). Also, see Instructions - Attachment 10.

Number of Years Annual

DescriptionYear Last Next Date To PaintedBe PaintedPrior Current Between Normaliza- Cost CostPaintings tion
Water St tower painting20062025375,457 180000015120000
Bliss Ave tower2004 TBD142,849 see Attach18

Other Normalizations
See Instructions for Attachment 10.
Explain on Attachment 19.

p. 46

Second Meters

  1. a.Does the utility have any customers with second meters to measure water not discharged to the Yes sanitary sewer system?
  2. b.Does the utility have rate schedule Am-1, Additional Meter Rental Charge? Yes For more information about second meters, please visit the "What are the allowable configurations and

applicable charges for additional meters ?" on the Commission's wesbite using the following link. FAQs: Meters If yes, fill out the summary below.

Revenues from additional meters should be reported in Account 474, Other Water Revenue on Attachment 7.

ResidentialMultifamilyCommercial Industrial
Last Actual Year End CountPublic Authority
General Service Meters8,0801731,15425154Columns H to L on W-23
Additional Meters27157512Columns I or Q on W-23
Total8107174121130166

The totals should agree with the meter counts reported on page W-23 of Annual Report.

If the utility does not have Schedule Am-1 but has customers with seconds meters, how are these customers billed for the second meter?

N/A

Payroll Allocations

If employees perform work for more than one function, please explain how costs are assigned to the water utility. For example, when an employee performs work for municipal parks, sewer, water, and private lead service lines, describe how the salary and wages dollars are assigned to the regulated water utility.

Payroll for employees who serve both the water and sewer departments is either allocated based on historical analysis (salary) or tracked based on work performed (hourly).

Notes

  1. 1.$10,312 of pension expense was posted to the 2024 SS Taxes account 408 in error. It should have been posted to the PSC account 926.
  2. 2.Other employees' benefits/reimbursements include clothing reimbursements, employee assistance program, boot allowance, pre-employment testing, wellness program, and post-employment plan PEHP ($43,094 in 2024, $0 in 2023).
  3. 3.The sick leave expense for FY24 is elevated due to the implementation of GASB 101, Compensated absences.
p. 47

ATTACHMENT 19b

2026 Test Year CREDIT CARD FEES

Required Supplemental Information

On January 25, 2019, the PSC sent communication to all municipal utilities outlining recent decisions to allow utilities to recover credit card processing fees through rates. As stated in that letter, municipal utilities may now request recovery of credit cards fees in a conventional rate case. If the Utility currently allows customers to pay utility bills using a credit card, please answer Question #1. If the Utility currently wants to include the cost to process credit cards payments in the estimated test year O&M expenses, please answer Question #2.

  1. 1.Does the Utility currently offer credit card billing? If yes, provide the following: Yes

A. Does the Utility or customer currently pay the transaction fee?
The Utility has been paying the fees involved with using a credit card since 2020

B. What expense account(s) does the Utility use to record credit card fees?
1-1-92101 (PSC account 921)

C. Provide the most recent three years of credit card fee expense.

Year$
202453,205
202338,481
202235,112

D. Identify either the vendor or the third party company used by the utility.
Used Civic Pay in 2024 and the beginning of 2025, but in June switched to Xpress Bill Pay

E. Provide a breakdown of the cost per transaction and any other fees that are incurred by the Utility.
The main fees related to MasterCard, Visa, and Discover are summarized as follows:

$0.00450 per transaction, $0.03 for each datawire, $0.01950 in processor fees/NABU fees. In addition to these, there are interchange fees that vary from month to month. Other fees are immaterial. The total cost is around 2.3% of the total credit charges amount.

  1. 2.Did the Utility include any expenses related to accepting credit cards in the test year

Yes

O&M forecast? If not, does the Utility want to include such expenses in the current application? If yes to either question, please provide further information on the A. Provide the test year estimate and methodology used to determine the forecast?

Water Utility share: 2025 - Estimate of $18,338 (2024 actual adjusted for the PSC inflation rate), 2026 - $18,870 (2025 estimate adjusted for the PSC inflation rate). Based on a general increase each year.

p. 48B. Provide the allocation percentage(s) and methodology used to allocate credit card fees across utilities or shared services.

The total fees above are split evenly between three accounts (water, sewer, and stormwater).

C. What O&M account did the Utility use for the test year estimate?
906

D. Identify the vendor the Utility will be using.
Xpress Bill Pay

E. Provide a breakdown of the cost per transaction and any other fees that will be incurred by the Utility.

The main fees related to MasterCard, Visa, and Discover are summarized as follows:

$0.00450 per transaction, $0.03 for each datawire, $0.01950 in processor fees/NABU fees. In addition to these, there are interchange fees that vary from month to month. Other fees are immaterial. The total cost is around 2% of the total credit charges amount.

F. What percentage of customers currently pay by credit card?
~ 32% of customers pay via credit cards.

G. Does the Utility expect more customers to use credit cards if this payment option is offered at no charge to the

customer? If so, what percentage of customers do you estimate will pay by credit card?
The utility does not expect an increase in usage.

H. Has the utility worked with vendor(s) to negotiate lower fees?
H1: Identify utility efforts to minimize fees.
H2: Provide name of vendor(s) contacted.
H3: Provide quoted amount(s) from each vendor contacted.
The Utility switched to Xpress Bill Pay in June 2025.

p. 49

STEP II MAJOR PLANT DETAIL
Test Year 2026
NOTE: Only applies to utilities requesting a two step rate case

USE ONLY FOR "MAJOR" PLANT NOT COMPLETED NOR PLACED IN SERVICE BY THE END OF THE TEST YEAR

  1. 1.If a utility has a major project that will not be completed in the current test year but will be completed by December 31st of the following year, filing a Two Step Rate Application may be appropriate. The utility excludes the project in preparing its Step I test year revenue requirement and includes the project in its revenue requirement for a Step II test year.
  2. 2.If a part or all of a major project will start during the test year and be placed into service by December 31st in the year following the test year, that portion of the project must be considered in Step II.
  3. 3.Summary of Step II major plant additions:
  4. i.Summarize, by plant account, the Step II plant additions.
  5. ii.Insert the applicable depreciation rates (from Attachment 12).
  6. iii.The depreciation expense will be calculated based upon the estimated plant and depreciation rates.
  7. 4.If necessary, please describe unusual situations in the Step II Notes.

A Two Step rate increase requires construction approval.
Please enter the construction docket below:
The Utility plans to submit the PSC request in 2026 for approval to construct
Tower 3, with construction expected in 2027.

Summary of Plant Additions (Retirements) in Step II
Addition

Account Number Description Financed by Utility or Municipality:(Retirement) AmountDepreciation RateExpense
342 Distribution reservoirs and standpipes7,500,0001.90%$142,500
Total Financed by Utility or Municipality7,500,000Depreciation Total$142,500
Contributed Plant:
Total Contributed Plant0
Total Step II NET Plant Additions$7,500,000
Less: Plant Outside Municipality0
Net Taxable Plant$7,500,000
Times Assessment Ratio (per Attachment 9)0.945800
Times Net Local and School Rate (per Attachment 9)17.823983
Calculated Tax Equivalent--Step II$126,434
Calculated Tax Equivalent – Step I (per Attachment 9)1,197,666
Tax Equivalent Computed (Combined Total Step I and II)$1,324,100
1994 Tax Equivalent Payable in 1995 (per Attachment 9)$333,470

If the municipality has authorized a lower amount as allowed by Wis. Stat. § 66.0811(2), then place that

amount on this line. If no authorization, leave blank. ===>870,000
Step I and Step II Combined:
Tax Equivalent Payable for the Test Year (See Attachment 9, Instruction 4 for criteria)$870,000
Less: Meter Allocation to Sewer (Attachment 8)23,163
Step I and Step II Combined Net Property Tax Equivalent-Water Utility$846,837
Units Added
If mains or hydrant plant accounts have Step II transactions above, specify theFeet of Main0
net units added for each.Hydrants0
p. 50

STEP II SUMMARY
NOTE: Only applies to utilities requesting a two step rate case

2026 Test YearStep I Total Per Attachment 14Step II AdditionalCombined TotalATTACHMENT 21
Part One:Total Operating Revenues$5,252,038$0$5,252,038
Total Operation and Maintenance Expenses$2,560,528$0$2,560,528
Depreciation Expense1,580,289142,5001,722,789
Amortization Expense--Acct # 404 (If Step II--specify):000
00
Taxes932,2100932,210
Total Operating Expenses$5,073,027$142,500$5,215,527
Net Operating Income (Loss)-Test Year 2026$179,011($142,500)$36,511
Part Two:
Plant In Service--Financed by Utility or Municipality$60,413,376$7,500,000$67,913,376
Materials and Supplies340,3590340,359
Less: Accumulated Depreciation21,878,726142,50022,021,226
Less: Regulatory Liability and Other000
Net Investment Rate Base (NIRB)$38,875,009$7,357,500$46,232,509
Part Three:Average Net Investment Rate Base(per Part Two above)$46,232,509
TIMES Rate of Return Requested for Step II:
The requested return can be different than in Step I.6.70%6.70%
Enter the Step II requested rate in this box.
Return on Average Net Investment Rate Base (NIRB)$3,097,578(A)
Total Operation and Maintenance Expenses(per Part One above)$2,560,528
TIMES allowance on O&M expenses6.00%
Operating Allowance$153,632(B)
Enter the larger of either:
The Return on NIRB (A) or the Operating Allowance (B)$3,097,578
Less: Estimated Net Operating Income (Loss)--Combined Step I and II(per Part One above)$36,511
Increase Requested-Test Year 2026--Combined Step I and II$3,061,067
Overall Percentage Increase in
Total Sales of Water at Current Rates:61.07%

p. 51STEP II

NOTES
Test Year 2026

NOTE: Only applies to utilities requesting a two step rate case

  1. 1.This attachment is to be used to describe any assumptions used by the utility in forecasting or describing any Step II items in Attachments 20 and 21.
  2. 2.Describe, in particular, Step II additional revenue or operation and maintenance expense forecasted in Attachment 21.
  3. 3.If necessary, include other general discussion that may be helpful regarding Step II items.

Step II Major Project(s) Authorization Docket Number(s)==>

Briefly Describe the Major Project(s) Below:

The Utility plans to submit the PSC request in 2026 for approval to construct Tower 3, with construction expected in 2027.

Other assumptions relating to Step II Major Project(s) -- Describe below: