GUARANTEED ENERGY SAVINGS PROGRAM
STUDY DIVISION OF ENERGY RESOURCES
Bemidji is first city to achieve energy efficiency upgrades with Minnesota GESP help
Energy retrofit: Upgrades to mechanical systems, building controls, interior and exterior LED lighting for eight city buildings, wastewater treatment plant, and replacement of citywide street lighting with LEDs.
Cost: $2.45 million
Project Summary: The City of Bemidji used an Energy Savings
Annual energy savings: 6,228 MMBtu (equivalent to reducing
Performance Contract (ESPC) to upgrade eight city buildings, its greenhouse gas emissions annually from 193 cars or CO2
wastewater treatment plant, and the city’s streetlights. It was the emissions from 96 homes) first local government entity to use the state’s Guaranteed Energy
Annual cost savings: $126,000
Savings Program (GESP) to oversee its project, which focused on
improving lighting, energy management controls, and mechanical Energy services company: Honeywell
systems. The project was completed in December 2016 and is State assistance: Guaranteed Energy Savings Program expected to yield annual energy savings of 15% and cost savings
Utility rebates: $122,000
of more than $126,000 per year. The city leveraged $273,000 in
previously approved capital improvement plan dollars, with no Project completed: December 2016 other upfront costs for the city and its taxpayers. The project
| is being paid for over 20 years via energy savings, which are | install, and monitor the energy and water saving measures |
| guaranteed by Honeywell, the energy services company. | proposed in the Investment Grade Audit Report. Terms included: |
| Aims & Objectives: Bemidji sought a cost-effective energy | • Project guaranteed maximum price; |
improvement plan that would be cash flow neutral. The city
| looked at energy savings as a great way to implement building | • Complete list of services to be provided as related to |
| upgrades while building on its sustainability efforts to be a good | each cost; |
| steward of the environment. | • Term of the contract; |
| Assessment & Energy Savings Performance Contract: Following | • Description of financing options and recommendations, includ- |
| a preliminary assessment of energy needs and opportunities, | ing soliciting financing companies on behalf of the state institu- |
| Honeywell performed a detailed analysis of the potential savings | tion and developing a lease purchase agreement with payment |
| and costs for each accepted energy and water savings measure. | schedules and lender financing terms and schedules; |
Utilizing the state’s GESP Master Contract, the contractor pre-
pared an Energy Savings Performance Contract proposal to design, • Guaranteed energy, operation, and maintenance savings;
(over)
“The biggest single benefit is that all of these infrastructure and capital improvements were done with basically no up-front cost. We made over $2 million in upgrades to buildings and street lights without burdening our taxpayers.”
—Rita Albrecht, Mayor of Bemidji
GESP
mn.gov/commerce
STUDY DIVISION OF ENERGY RESOURCES
JUNE 2017
- •Explanation of how the savings will be calculated and Results/Benefits: In 2018, Bemidji will document utility savings
adjusted; and achieved in 2017 from its energy efficiency measures, as financed
without bonding or raising taxes. Packaging energy efficiency
- •Analysis of annual cash flow for the state institution
upgrades in several buildings allowed Bemidji to do more on a
during the contract term.
quicker timeline than otherwise would have been possible, said
| Implementation: Work was completed on eight city buildings and | Ron Eischens, Bemidji’s finance director. Bemidji lacked technical |
| a wastewater treatment plant, and citywide improvements were | staff with specialization in energy efficiency, so it relied on Hon- |
| made to street lighting and vending | eywell’s expertise. “The bidding and selection process was |
| machines. Citywide, high pressure | fully managed by Honeywell, which saved the city a lot of |
| sodium and metal halide street | administrative time,” said Eischens. Due to the Guaranteed |
| lighting fixtures were retrofitted with | Energy Savings Program, “the performance contract also |
| light-emitting diode (LED) kits, and | created competition among vendors bidding on individual |
| controls were installed to shut down | projects, which meant many of the projects came in under |
| beverage vending machines when not | budget and saved us money.” |
being used.
What’s more, the energy services contract struck by Bemidji
| Three buildings—City Hall, Public | and Honeywell included collaboration with a third party, |
| Works, and the Sanford Center— | the Guaranteed Energy Services Program (GESP), which |
| received lighting retrofits, energy | provided Bemidji support every step of the way. GESP, |
| management system (EMS) and direct | administered by the Minnesota Department of Commerce, |
| digital controls (DDC) recommission- | provided transparency to the process by evaluating the |
| ing, and air leakage sealing; Public | technical and financial feasibility of ESCO proposals and by |
| Works also had a cooling system | providing project technical assistance review for cash flow |
| upgrade. The Wastewater Treatment | and the Measurement and Verification Plan. |
Facility, Chamber Building, and two
“All of the things mentioned above are benefits of any
liquor stores received lighting up-
performance contract project,” said Bemidji Mayor Rita
grades. The History Center had its
Albrecht. “But what made using GESP particularly beneficial
existing DDC system recommissioned,
is that we received guidance from the experts at the Min-
while the Library received a lighting Street lights were retrofitted with nesota Department of Commerce who provided standard
retrofit, DDC recommissioning, air LED kits citywide.
contracts and added certainty to the process.”
leakage service, and two new hot water high-efficiency modulating boilers.
What is the Guaranteed Energy Savings Program?
The Guaranteed Energy Savings Program (GESP) is a procurement and financing mechanism that assists state agencies, local units of government, school districts, and institutions of higher education with the development, implementation, and ongoing measurement and verification of energy efficiency and/or renewable energy projects. Participants gain access to technical assistance from Commerce, pre-qualified Energy Services Companies, Master Contract, selection and procurement documents, and GESP staff oversight for each phase of the project that can last up to 25 years. The intent of the program is to maximize job creation and operational cost savings through investment in public facilities.
GESP is administered by the Minnesota Department of Commerce. It can help public entities:
- •Solicit and award site-specific RFPs from pre-qualified Energy Services Companies (ESCO) to perform Energy Savings Performance Contracting (ESPC) services;
- •Evaluate the technical and financial feasibility of ESCO proposals;
- •Negotiate and award work order contracts to pre-qualified ESCOs to implement energy conservation measures;
- •Offer project management oversight; and
- •Ensure that the ESPC Measurement and Verification Plan is properly performed.
For information on GESP, contact Pete Berger, GESP manager, at 651-539-1850 or Peter.berger@state.mn.us.